Back to kitchen remodel contractors
Amber - Tru Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Aug 2026
- Last 24 months
- 10 permits filed
107 permits since 2000: 77 completed, 9 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 31 days from filing to permit and 357 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Feb 2026 | 541 Eureka St | interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear.Details
interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear. | $110,000 |
| Aug 16, 2024 | Completed final sign-off Apr 2025 | 260 32nd Av | replace existing kitchen cabinetry. remove wall between kitchen and dining room. install new kitchen island. install new door/window at kitchen, new closet at entry foyer. legalize (e) balcony at third floor. legalize rear deck expanded without a benefit a permit.Details
replace existing kitchen cabinetry. remove wall between kitchen and dining room. install new kitchen island. install new door/window at kitchen, new closet at entry foyer. legalize (e) balcony at third floor. legalize rear deck expanded without a benefit a permit. | $68,000 |
| Jun 3, 2024 | Completed final sign-off Jun 2025 | 339 Elsie St | interior remodel to (e) 2 story, sfd. remodel (e) kitchen & bahtorom; convert (e) closet into laundry room. remove & replace patio door. remove door & replace with window. modify (e) deck to accomodate (n) rear door.Details
interior remodel to (e) 2 story, sfd. remodel (e) kitchen & bahtorom; convert (e) closet into laundry room. remove & replace patio door. remove door & replace with window. modify (e) deck to accomodate (n) rear door. | $48,000 |
| Mar 14, 2024 | Completed final sign-off Jan 2026 | 25 Toledo Wy | remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallwayDetails
remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallway | $400,000 |
| Nov 30, 2022 | Completed final sign-off Apr 2023 | 132 Funston Av | 3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor.Details
3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor. | $50,000 |
| Mar 9, 2022 | Completed final sign-off Oct 2024 | 1251 Dolores St | interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area.Details
interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area. | $400,000 |
| Jun 29, 2020 | Completed final sign-off Apr 2023 | 4118 21st St | revision to pa# 201802272279. expansion of sfh to 2 unit. add 3rd floor with living, dinning, kitchen for new 2nd unit per bid. new bpa can incorporate inspection & work under pa# 201802272279. plan abate dbi nov# 201919811 &nov# 201813931 / dcp2018-017368eng per dcp approval 2020-000215prj/cuaDetails
revision to pa# 201802272279. expansion of sfh to 2 unit. add 3rd floor with living, dinning, kitchen for new 2nd unit per bid. new bpa can incorporate inspection & work under pa# 201802272279. plan abate dbi nov# 201919811 &nov# 201813931 / dcp2018-017368eng per dcp approval 2020-000215prj/cua | $300,000 |
| Nov 19, 2018 | Completed final sign-off Jun 2023 | 3454 Sacramento St | add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permitDetails
add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permit | $1,554,324 |
| Sep 18, 2017 | Completed final sign-off Aug 2020 | 109 Hoffman Av | converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl.Details
converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl. | $85,000 |
| Jan 19, 2017 | Expired or cancelled cancelled Jun 2018 | 1709 Broderick St | replace existing bathroom and kitchen in-kind. no exterior alterations.Details
replace existing bathroom and kitchen in-kind. no exterior alterations. | $500 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| Feb 12, 2014 | Never finaled issued Feb 2014, no final | 1099 23rd St | remodel kitchen & one (1) bathroom, new cabinets, tile & fixtures. no structural work.Details
remodel kitchen & one (1) bathroom, new cabinets, tile & fixtures. no structural work. | $75,000 |
| Oct 17, 2013 | Completed final sign-off Apr 2014 | 793 22nd Av | remodel of kitchen & bathroom on top floor unit .Details
remodel of kitchen & bathroom on top floor unit . | $15,000 |
| Jul 23, 2013 | Completed final sign-off May 2017 | 284 Grand View Av | proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deckDetails
proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck | $300,000 |
| Jun 14, 2013 | Completed final sign-off Oct 2016 | 2851 Filbert St | remove existing kitchen; building to become accessory structure.Details
remove existing kitchen; building to become accessory structure. | $900 |
| Jun 22, 2010 | Completed final sign-off Aug 2010 | 2230 Pacific Av | remodel kitchen and bath in top floor condo. cabinets, tile, countertops and fixtures all replaced. plmg & elec. up grade ot code. extg electrical panel moved from closet to hallway as per code. no structural work to be performed. kchn: atleast 50% high efficacy lighting. bathroom:high efficacy orDetails
remodel kitchen and bath in top floor condo. cabinets, tile, countertops and fixtures all replaced. plmg & elec. up grade ot code. extg electrical panel moved from closet to hallway as per code. no structural work to be performed. kchn: atleast 50% high efficacy lighting. bathroom:high efficacy or | $35,000 |
| Aug 31, 2009 | Completed final sign-off Dec 2009 | 75 Buena Vista East Av | remove and replace cabinets in kitchen with similar new cabinets and countertop. remove and replace bathroom tile and fixtures and replace in kind. no structural work. all work in apartment on top floor #903 only. no walls to be moved during remodel. no structural work.Details
remove and replace cabinets in kitchen with similar new cabinets and countertop. remove and replace bathroom tile and fixtures and replace in kind. no structural work. all work in apartment on top floor #903 only. no walls to be moved during remodel. no structural work. | $35,000 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 50 Hiliritas Av | remove cabinets and tile to kitchen and bathroom and replace in kind. no structure change. kitchen: 16'x10' & bathroom : 8'x10'. replace countertop, sink, vanity, bathtub, toilet, flooring. upgrade electrical & add two lights. no lighting change in kitchen.Details
remove cabinets and tile to kitchen and bathroom and replace in kind. no structure change. kitchen: 16'x10' & bathroom : 8'x10'. replace countertop, sink, vanity, bathtub, toilet, flooring. upgrade electrical & add two lights. no lighting change in kitchen. | $37,829 |
| Feb 19, 2009 | Completed final sign-off May 2009 | 360 Guerrero St | work @ unit# 106 only. remove existing kitchen cabinets & replace in kind. no electrical or plumbing needed.Details
work @ unit# 106 only. remove existing kitchen cabinets & replace in kind. no electrical or plumbing needed. | $12,000 |