Back to bathroom remodel contractors
Amber - Tru Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Aug 2026
- Last 24 months
- 10 permits filed
107 permits since 2000: 77 completed, 9 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 22 completed, 2 in progress, 4 never finaled, 4 expired or cancelled. Typically 13 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Feb 2026 | 541 Eureka St | interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear.Details
interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear. | $110,000 |
| Oct 16, 2024 | In progress issued Oct 2024 | 3749 22nd St | laundry room and bath renovation. replace side door in kind. new steps and steel rails/gates at side entry. new planter, platforms, and steel rails at driveway.Details
laundry room and bath renovation. replace side door in kind. new steps and steel rails/gates at side entry. new planter, platforms, and steel rails at driveway. | $75,000 |
| Jun 28, 2024 | Completed final sign-off Apr 2025 | 260 32nd Av | remodel 3 bathrooms. change out tile, fixtures and vanity. no layout or structural change.Details
remodel 3 bathrooms. change out tile, fixtures and vanity. no layout or structural change. | $75,000 |
| Mar 14, 2024 | Completed final sign-off Jan 2026 | 25 Toledo Wy | remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallwayDetails
remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallway | $400,000 |
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 2746 Filbert St | bathroom remodel on upper fl. replace in-kind tile, tub and fixtures, replace vanity top. remodel in-kind.Details
bathroom remodel on upper fl. replace in-kind tile, tub and fixtures, replace vanity top. remodel in-kind. | $30,000 |
| Jun 26, 2023 | Expired or cancelled withdrawn Jul 2023 | 2746 Filbert St | revision to pa# 2021-0325-7298; to remove remodel of master bathroom on top floor from scopeDetails
revision to pa# 2021-0325-7298; to remove remodel of master bathroom on top floor from scope | |
| Nov 30, 2022 | Completed final sign-off Apr 2023 | 132 Funston Av | 3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor.Details
3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor. | $50,000 |
| Aug 12, 2022 | Expired or cancelled expired Feb 2026 | 202 Fair Oaks St | interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairsDetails
interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairs | $40,000 |
| Jun 21, 2022 | Completed final sign-off Jan 2023 | 4545 25th St | remodel in kind. 4 bathrooms & 1 laundry room, new tile and plumbing fixtures. no layout change, no structural work.Details
remodel in kind. 4 bathrooms & 1 laundry room, new tile and plumbing fixtures. no layout change, no structural work. | $200,000 |
| Mar 9, 2022 | Completed final sign-off Oct 2024 | 1251 Dolores St | interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area.Details
interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area. | $400,000 |
| Feb 1, 2021 | Never finaled issued Aug 2022, no final | 649 28th St | addition to rear of 1st and 2nd floors and addition of new 3rd floor. expand existing 2,105 gsf 2-bedroom, 1 bath house to a 4,227 gsf-5 bedroom 3.5-bath house.Details
addition to rear of 1st and 2nd floors and addition of new 3rd floor. expand existing 2,105 gsf 2-bedroom, 1 bath house to a 4,227 gsf-5 bedroom 3.5-bath house. | $1,200,000 |
| Nov 19, 2018 | Completed final sign-off Jun 2023 | 3454 Sacramento St | add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permitDetails
add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permit | $1,554,324 |
| Sep 18, 2017 | Completed final sign-off Aug 2020 | 109 Hoffman Av | converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl.Details
converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl. | $85,000 |
| Jan 19, 2017 | Expired or cancelled cancelled Jun 2018 | 1709 Broderick St | replace existing bathroom and kitchen in-kind. no exterior alterations.Details
replace existing bathroom and kitchen in-kind. no exterior alterations. | $500 |
| Sep 12, 2016 | Completed final sign-off May 2018 | 2851 Filbert St | remodel two bathrooms in (e) rear yard cottage. repair dry rot to access stairs to same cottage. not visible from strret - repair in-kind.Details
remodel two bathrooms in (e) rear yard cottage. repair dry rot to access stairs to same cottage. not visible from strret - repair in-kind. | $25,000 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2020 | 1632 Broderick St | convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/fDetails
convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/f | $20,000 |
| Jul 1, 2014 | Completed final sign-off Apr 2017 | 537 Laidley St | third story vertical & horizontal addition, proposed residence 4 bedrooms and 3 and half bathrooms.Details
third story vertical & horizontal addition, proposed residence 4 bedrooms and 3 and half bathrooms. | $300,000 |
| Feb 12, 2014 | Never finaled issued Feb 2014, no final | 1099 23rd St | remodel kitchen & one (1) bathroom, new cabinets, tile & fixtures. no structural work.Details
remodel kitchen & one (1) bathroom, new cabinets, tile & fixtures. no structural work. | $75,000 |
| Oct 17, 2013 | Completed final sign-off Apr 2014 | 793 22nd Av | remodel of kitchen & bathroom on top floor unit .Details
remodel of kitchen & bathroom on top floor unit . | $15,000 |
| Aug 29, 2013 | Completed final sign-off May 2014 | 914 Sanchez St | rev. to pa#201307051246 alter master bath, utilize existing foundation at gridline e and center of garage instead of installing new foundation.Details
rev. to pa#201307051246 alter master bath, utilize existing foundation at gridline e and center of garage instead of installing new foundation. | |
| Jul 23, 2013 | Completed final sign-off May 2017 | 284 Grand View Av | proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deckDetails
proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck | $300,000 |
| May 3, 2013 | Completed final sign-off May 2016 | 220 27th St | addition of (n) upper 3/fl & excavate portions of garage level 1/fl. additions/extension on grd (1st) fl & main (2nd) fl. remodel interior (e) house. 2 (n) bathroom added.Details
addition of (n) upper 3/fl & excavate portions of garage level 1/fl. additions/extension on grd (1st) fl & main (2nd) fl. remodel interior (e) house. 2 (n) bathroom added. | $350,000 |
| Feb 26, 2013 | Completed final sign-off Feb 2015 | 315 30th St | horizontal addition to rear of house. including 2 (n) bedrooms & 2 (n) bathrooms & office & media room.Details
horizontal addition to rear of house. including 2 (n) bedrooms & 2 (n) bathrooms & office & media room. | $200,000 |
| Jan 9, 2012 | Completed final sign-off Feb 2012 | 3767 21st St | revision to app#200906251333 to include:1st floor:scope reduction reconfigure bathroom and closet-move furnace and redo crawl space. 2nd floor:reconfigure bath and laundry. 3rd floor: add closets to master bed and reconfigure bath. roof: remove exit ridge skylight and infill with new roofDetails
revision to app#200906251333 to include:1st floor:scope reduction reconfigure bathroom and closet-move furnace and redo crawl space. 2nd floor:reconfigure bath and laundry. 3rd floor: add closets to master bed and reconfigure bath. roof: remove exit ridge skylight and infill with new roof | |
| Nov 1, 2011 | Expired or cancelled expired Jul 2020 | 357 Elsie St | addition & renovaton to an existing single family house: new vertical addition including new bathroom. alteration to existing back room on garden side.Details
addition & renovaton to an existing single family house: new vertical addition including new bathroom. alteration to existing back room on garden side. | $115,000 |
| Feb 15, 2011 | Never finaled issued Feb 2011, no final | 2654 16th Av | relocate laundry rm. reconfigure 1st. flr. entry & stair(enclose 1560sq.ft.)remodel (e) bath#2. install 4(n) ext. doors(not visible to st.)install (n) ext. landing & stair to rearyard. install (n) roof area & skylight @ int. lightwell. relocate closet @ bedrm.#2.Details
relocate laundry rm. reconfigure 1st. flr. entry & stair(enclose 1560sq.ft.)remodel (e) bath#2. install 4(n) ext. doors(not visible to st.)install (n) ext. landing & stair to rearyard. install (n) roof area & skylight @ int. lightwell. relocate closet @ bedrm.#2. | $75,000 |
| Feb 2, 2011 | Completed final sign-off Jul 2011 | 621 Banks St | convert (e) storage space into a new bathroom and laundry room on garage level. no structural work. no work @ front of building.Details
convert (e) storage space into a new bathroom and laundry room on garage level. no structural work. no work @ front of building. | $25,000 |
| Jun 22, 2010 | Completed final sign-off Aug 2010 | 2230 Pacific Av | remodel kitchen and bath in top floor condo. cabinets, tile, countertops and fixtures all replaced. plmg & elec. up grade ot code. extg electrical panel moved from closet to hallway as per code. no structural work to be performed. kchn: atleast 50% high efficacy lighting. bathroom:high efficacy orDetails
remodel kitchen and bath in top floor condo. cabinets, tile, countertops and fixtures all replaced. plmg & elec. up grade ot code. extg electrical panel moved from closet to hallway as per code. no structural work to be performed. kchn: atleast 50% high efficacy lighting. bathroom:high efficacy or | $35,000 |
| Aug 31, 2009 | Completed final sign-off Dec 2009 | 75 Buena Vista East Av | remove and replace cabinets in kitchen with similar new cabinets and countertop. remove and replace bathroom tile and fixtures and replace in kind. no structural work. all work in apartment on top floor #903 only. no walls to be moved during remodel. no structural work.Details
remove and replace cabinets in kitchen with similar new cabinets and countertop. remove and replace bathroom tile and fixtures and replace in kind. no structural work. all work in apartment on top floor #903 only. no walls to be moved during remodel. no structural work. | $35,000 |
| Jun 25, 2009 | Completed final sign-off Feb 2012 | 3767 21st St | renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath.Details
renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath. | $360,000 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 50 Hiliritas Av | remove cabinets and tile to kitchen and bathroom and replace in kind. no structure change. kitchen: 16'x10' & bathroom : 8'x10'. replace countertop, sink, vanity, bathtub, toilet, flooring. upgrade electrical & add two lights. no lighting change in kitchen.Details
remove cabinets and tile to kitchen and bathroom and replace in kind. no structure change. kitchen: 16'x10' & bathroom : 8'x10'. replace countertop, sink, vanity, bathtub, toilet, flooring. upgrade electrical & add two lights. no lighting change in kitchen. | $37,829 |