Amber - Tru Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Aug 2026
- Last 24 months
- 10 permits filed
107 permits since 2000: 77 completed, 9 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
5 roof deck permits: 4 completed, 1 expired or cancelled. Typically 343 days from filing to permit and 804 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2019 | Completed final sign-off Jul 2020 | 357 Elsie St | revision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space)Details
revision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space) | $2,000 |
| Mar 1, 2018 | Expired or cancelled cancelled Jun 2018 | 2851 Filbert St | add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors.Details
add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors. | $50,000 |
| Mar 16, 2015 | Completed final sign-off May 2023 | 1100 Potrero Av | to erect 4 stories, no basement, 4 dwelling unit residential apartment. partial of (e) structure with historical features will be re-assembled as a sunroom on roofdeck above the 3rd floor of the new building.Details
to erect 4 stories, no basement, 4 dwelling unit residential apartment. partial of (e) structure with historical features will be re-assembled as a sunroom on roofdeck above the 3rd floor of the new building. | $700,000 |
| Jul 23, 2013 | Completed final sign-off May 2017 | 284 Grand View Av | proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deckDetails
proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck | $300,000 |
| Jun 25, 2009 | Completed final sign-off Feb 2012 | 3767 21st St | renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath.Details
renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath. | $360,000 |