Permit GraphShortlistSan Francisco building permits since 2000

Amber - Tru Construction Inc.

Contractor license
880789
State license record
Based in
San Francisco
On San Francisco permits
Nov 2006 to Aug 2026
Last 24 months
10 permits filed

107 permits since 2000: 77 completed, 9 in progress, 12 never finaled, 9 expired or cancelled.

Of the 12 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Roof deck permits

AllRoof deck 5Deck 9Stairs 18Kitchen remodel 19Bathroom remodel 32

5 roof deck permits: 4 completed, 1 expired or cancelled. Typically 343 days from filing to permit and 804 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 15, 2019Completed
final sign-off Jul 2020
357 Elsie Strevision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space)
Details
Permit
201901150393
Status
complete
Filed
Jan 15, 2019
Permit issued
Jan 16, 2019
Final sign-off
Jul 27, 2020
Declared cost
$2,000
Address
357 Elsie St

revision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space)

Open the permit page

$2,000
Mar 1, 2018Expired or cancelled
cancelled Jun 2018
2851 Filbert Stadd roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors.
Details
Permit
201803012631
Status
cancelled
Filed
Mar 1, 2018
Permit issued
Mar 27, 2018
Declared cost
$50,000
Address
2851 Filbert St

add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors.

Open the permit page

$50,000
Mar 16, 2015Completed
final sign-off May 2023
1100 Potrero Avto erect 4 stories, no basement, 4 dwelling unit residential apartment. partial of (e) structure with historical features will be re-assembled as a sunroom on roofdeck above the 3rd floor of the new building.
Details
Permit
201503161018
Status
complete
Filed
Mar 16, 2015
Permit issued
May 3, 2019
Final sign-off
May 31, 2023
Declared cost
$700,000
Address
1100 Potrero Av

to erect 4 stories, no basement, 4 dwelling unit residential apartment. partial of (e) structure with historical features will be re-assembled as a sunroom on roofdeck above the 3rd floor of the new building.

Open the permit page

$700,000
Jul 23, 2013Completed
final sign-off May 2017
284 Grand View Avproposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck
Details
Permit
201307232538
Status
complete
Filed
Jul 23, 2013
Permit issued
Jul 1, 2014
Final sign-off
May 16, 2017
Declared cost
$300,000
Address
284 Grand View Av

proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck

Open the permit page

$300,000
Jun 25, 2009Completed
final sign-off Feb 2012
3767 21st Strenv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath.
Details
Permit
200906251333
Status
complete
Filed
Jun 25, 2009
Permit issued
Jun 6, 2011
Final sign-off
Feb 3, 2012
Declared cost
$360,000
Address
3767 21st St

renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath.

Open the permit page

$360,000