Amber - Tru Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Aug 2026
- Last 24 months
- 10 permits filed
107 permits since 2000: 77 completed, 9 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
18 stairs permits: 14 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 18 days from filing to permit and 549 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Feb 2026 | 541 Eureka St | interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear.Details
interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear. | $110,000 |
| Aug 12, 2022 | Expired or cancelled expired Feb 2026 | 202 Fair Oaks St | interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairsDetails
interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairs | $40,000 |
| Mar 9, 2022 | Completed final sign-off Oct 2024 | 1251 Dolores St | interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area.Details
interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area. | $400,000 |
| Jan 15, 2019 | Completed final sign-off Jul 2020 | 357 Elsie St | revision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space)Details
revision to 201111018059 to include new 1 hour rated wall in garage. remove roof deck and spiral stairs from scope. (separate permit to add habitable space) | $2,000 |
| Nov 19, 2018 | Completed final sign-off Jun 2023 | 3454 Sacramento St | add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permitDetails
add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permit | $1,554,324 |
| Mar 1, 2018 | Expired or cancelled cancelled Jun 2018 | 2851 Filbert St | add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors.Details
add roof deck to new single family house on rear part of roof, not visible from street. rolling roof hatch for access. glass railings around perimeter. top of glass on roof hatch not to exceed 12" above roof surface. remove existing spiral stairs and in-fill floors. | $50,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2018 | 67 Richland Av | replace front stairs in kind; structural reinforce front bay window with steel beams; construct set-back wall (10' height) at tradesman entrance.Details
replace front stairs in kind; structural reinforce front bay window with steel beams; construct set-back wall (10' height) at tradesman entrance. | $50,000 |
| Sep 12, 2016 | Completed final sign-off May 2018 | 2851 Filbert St | remodel two bathrooms in (e) rear yard cottage. repair dry rot to access stairs to same cottage. not visible from strret - repair in-kind.Details
remodel two bathrooms in (e) rear yard cottage. repair dry rot to access stairs to same cottage. not visible from strret - repair in-kind. | $25,000 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2020 | 1632 Broderick St | convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/fDetails
convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/f | $20,000 |
| Jul 23, 2013 | Completed final sign-off May 2017 | 284 Grand View Av | proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deckDetails
proposed renovation west w/ vertical & horizontal additions, excavation & (n) foundation @ (e)1/f to allow for code compliant ceiling height @ 1/f. conversion of (e) crawl space to garage @ 1/f w/ bedrm, bath & kitchenette; stairs to fl above. int'r remodel of (e) 1/f addition of 2nd fl & roof deck | $300,000 |
| Aug 1, 2011 | Completed final sign-off Oct 2011 | 60 Uranus Tr | partial repair of (e) steps at front entry stairsDetails
partial repair of (e) steps at front entry stairs | $10,000 |
| Feb 15, 2011 | Never finaled issued Feb 2011, no final | 2654 16th Av | relocate laundry rm. reconfigure 1st. flr. entry & stair(enclose 1560sq.ft.)remodel (e) bath#2. install 4(n) ext. doors(not visible to st.)install (n) ext. landing & stair to rearyard. install (n) roof area & skylight @ int. lightwell. relocate closet @ bedrm.#2.Details
relocate laundry rm. reconfigure 1st. flr. entry & stair(enclose 1560sq.ft.)remodel (e) bath#2. install 4(n) ext. doors(not visible to st.)install (n) ext. landing & stair to rearyard. install (n) roof area & skylight @ int. lightwell. relocate closet @ bedrm.#2. | $75,000 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 229 Chenery St | remove rear deck stair. install new gaurdrailDetails
remove rear deck stair. install new gaurdrail | $5,000 |
| Jun 25, 2009 | Completed final sign-off Feb 2012 | 3767 21st St | renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath.Details
renv all fls:replc(e)rear roof w/new roof deck.repc(e)single glazed windws w/new insul.remv storage shed&kiln fr side yd.1/fl int remodel(e)int stair.convery wk studio into media rm w/bath&closet.2/fl:reloc kitn&prov bed,bath&laun.replc(e)int.stair w/ new to 3/fl.infill fl@(e)stair.add m.bed&(ebath. | $360,000 |
| Nov 20, 2008 | Completed final sign-off Dec 2008 | 2672 Union St | repair deck and stairs to rear of building to make safe and bring railing to code. less than 50% demo (treads & risers & handrails)Details
repair deck and stairs to rear of building to make safe and bring railing to code. less than 50% demo (treads & risers & handrails) | $3,000 |
| Aug 21, 2008 | Completed final sign-off Oct 2010 | 363 30th St | new garage door into new garage space w/ new stairs down to basement, change to lower front elevation, no change to rear side.Details
new garage door into new garage space w/ new stairs down to basement, change to lower front elevation, no change to rear side. | $25,000 |
| Nov 27, 2006 | Completed final sign-off Feb 2007 | 253 Collingwood St | remove rotten members from deck, exterior stair and railings and replace with like. less than 50% replaced, if more than 50% drawings & city planning approval may be requierd. all work to rear of building.Details
remove rotten members from deck, exterior stair and railings and replace with like. less than 50% replaced, if more than 50% drawings & city planning approval may be requierd. all work to rear of building. | $10,000 |