Block 1665, lot 023

793 22nd Ave

The city’s assessor roll has no record for this parcel.

Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

12 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 11, 2017Completed
final sign-off Sep 2017
793 22nd AvDeluxe Windows And Doors2 windows revision to permit no 201701308211 - total of 5 windows replace front windows within existing openings from vinyl to aluminum-clad wood
Details
Permit
201709117619
Permit issued
Sep 11, 2017
Final sign-off
Sep 14, 2017

2 windows revision to permit no 201701308211 - total of 5 windows replace front windows within existing openings from vinyl to aluminum-clad wood

Open the permit page

Jan 30, 2017Completed
final sign-off Jun 2017
791 22nd AvDeluxe Windows And Doors, Christopher Gate Construction Incwindows visible from street. 3 windows change from vinyl to aluminum-clad/wood.
Details
Permit
201701308211
Permit issued
Jan 30, 2017
Final sign-off
Jun 15, 2017

windows visible from street. 3 windows change from vinyl to aluminum-clad/wood.

Open the permit page

$2,000
Jan 27, 2017Completed
final sign-off Jun 2017
791 22nd AvDeluxe Windows And Doors, Christopher Gate Construction Inccomply with physical inspection report cc 8127 item 2 and 3
Details
Permit
201701278133
Permit issued
Jan 27, 2017
Final sign-off
Jun 15, 2017

comply with physical inspection report cc 8127 item 2 and 3

Open the permit page

$1,500
May 1, 2014Completed
final sign-off Aug 2014
791 22nd AvChristopher Gate Construction Increvision to appl #2012.0228.4979 - reframe joists at second floor ceiling to run perpendicular to lot not parallel.
Details
Permit
201405014655
Permit issued
May 15, 2014
Final sign-off
Aug 11, 2014

revision to appl #2012.0228.4979 - reframe joists at second floor ceiling to run perpendicular to lot not parallel.

Open the permit page

Jan 30, 2014Never finaled
issued Jan 2014, no final
791 22nd Avstreet space
Details
Permit
M460607
Permit issued
Jan 30, 2014

street space

Open the permit page

Dec 10, 2013Completed
final sign-off May 2014
791 22nd Avrevision to pa# 201202284979. add window, 2nd floor north & west elevation. relocate wst door at 2nd floor. indicated on structural plans already.
Details
Permit
201312103838
Permit issued
Dec 17, 2013
Final sign-off
May 2, 2014

revision to pa# 201202284979. add window, 2nd floor north & west elevation. relocate wst door at 2nd floor. indicated on structural plans already.

Open the permit page

$500
Oct 17, 2013Completed
final sign-off Apr 2014
793 22nd AvAmber - Tru Construction Inc.remodel of kitchen & bathroom on top floor unit .
Details
Permit
201310179568
Permit issued
Oct 17, 2013
Final sign-off
Apr 10, 2014

remodel of kitchen & bathroom on top floor unit .

Open the permit page

$15,000
Sep 20, 2013Completed
final sign-off May 2014
791 22nd Avto comply with nov# 201318001, revision to pa# 2012-0228-4979-revise foundation detail at south elevation so that adjacent building will not require underpinning.
Details
Permit
201309207344
Permit issued
Sep 25, 2013
Final sign-off
May 2, 2014

to comply with nov# 201318001, revision to pa# 2012-0228-4979-revise foundation detail at south elevation so that adjacent building will not require underpinning.

Open the permit page

Jul 23, 2013Never finaled
issued Jul 2013, no final
791 22nd Avstreet space permit
Details
Permit
M410327
Permit issued
Jul 23, 2013

street space permit

Open the permit page

Dec 10, 2012Completed
final sign-off Aug 2014
791 22nd Avper board of appeal decision #11-119. conditions the subject permit to require as decision.
Details
Permit
201212105794
Permit issued
Dec 11, 2012
Final sign-off
Aug 11, 2014

per board of appeal decision #11-119. conditions the subject permit to require as decision.

Open the permit page

Feb 28, 2012Completed
final sign-off Aug 2014
791 22nd Avrevision to 2011-02-03-9574/s. relocate 2nd floor addition , 3 ft to north. 2nd fl addition to be 10'-3 1/2" from existing building. 1st floor addition to be 14'-0" from existing building.
Details
Permit
201202284979
Permit issued
Jul 12, 2012
Final sign-off
Aug 11, 2014

revision to 2011-02-03-9574/s. relocate 2nd floor addition , 3 ft to north. 2nd fl addition to be 10'-3 1/2" from existing building. 1st floor addition to be 14'-0" from existing building.

Open the permit page

Feb 3, 2011Completed
final sign-off Aug 2014
791 22nd Av2 story rear yard addition with roof deck. legalize space @ 1st floor. provide 2 bedrooms & bath. new bedroom & relocate bath @ 2nd floor.
Details
Permit
201102039574
Permit issued
Oct 7, 2011
Final sign-off
Aug 11, 2014

2 story rear yard addition with roof deck. legalize space @ 1st floor. provide 2 bedrooms & bath. new bedroom & relocate bath @ 2nd floor.

Open the permit page

$95,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Christopher Gate Construction Inc (3), Deluxe Windows And Doors (3), Amber - Tru Construction Inc.
Architects
William Pashelinsky (4)
Engineers
Vladimir Zelenko, William Pashelinsky

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.