Back to kitchen remodel contractors
Alex R Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 11 permits filed
128 permits since 2000: 103 completed, 3 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 17 completed, 2 in progress, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 319 Mullen Av | to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize.Details
to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize. | $10,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 1120 Church St | remodel (e) kitchen remodel in kind at lower level unit. no change to (e) floor layout. no change to (e) wall layout. no structural work. maintain all (e) fire rating and separation.Details
remodel (e) kitchen remodel in kind at lower level unit. no change to (e) floor layout. no change to (e) wall layout. no structural work. maintain all (e) fire rating and separation. | $18,900 |
| Jul 18, 2025 | In progress filed Jul 2025, not yet issued | 1800 20th Av | units 1-6; replace old electrical panels. unit 2: replace kitchen faucet and toilet.Details
units 1-6; replace old electrical panels. unit 2: replace kitchen faucet and toilet. | $49,000 |
| Jun 25, 2024 | Completed final sign-off Feb 2025 | 2081 Taylor St | replace kitchen cabinet and countertop, replace plumbing in laundry room.Details
replace kitchen cabinet and countertop, replace plumbing in laundry room. | $19,000 |
| Apr 26, 2024 | Completed final sign-off Dec 2024 | 2279 42nd Av | remodel bathroom and kitchen in kind - no change to wall layout and floor layout. no structural work. replace 2 front windows and 2 rear windows in kind - aluminum sliders. same size and location and operation. no structural work. maintain eero per cbc 1031. u-factor 0.30 maxDetails
remodel bathroom and kitchen in kind - no change to wall layout and floor layout. no structural work. replace 2 front windows and 2 rear windows in kind - aluminum sliders. same size and location and operation. no structural work. maintain eero per cbc 1031. u-factor 0.30 max | $24,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2023 | 571 Moscow St | repair window trim side house and install gfci; kitchen, replace kitchen faucet.Details
repair window trim side house and install gfci; kitchen, replace kitchen faucet. | $3,500 |
| May 1, 2023 | Completed final sign-off Oct 2023 | 2147 40th Av | enlarge (e) bedroom. construct 1 full bathroom & wet bar at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f.Details
enlarge (e) bedroom. construct 1 full bathroom & wet bar at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f. | $120,000 |
| Apr 17, 2023 | Completed final sign-off Oct 2023 | 100 Putnam St | repair dry rot back wall facing yard. replace toilet and install light in kitchen 3 watt switch in-kind. replace window in kind. all repair is in kind.Details
repair dry rot back wall facing yard. replace toilet and install light in kitchen 3 watt switch in-kind. replace window in kind. all repair is in kind. | $4,500 |
| Apr 17, 2023 | Completed final sign-off Jul 2023 | 5 Fella Pl | unit 301: replace kitchen cabinets, counter tops. rewire apartment. bathroom retile, replace cabinet, faucet. maintain fire separation with 5/8" type x sheetrock.Details
unit 301: replace kitchen cabinets, counter tops. rewire apartment. bathroom retile, replace cabinet, faucet. maintain fire separation with 5/8" type x sheetrock. | $61,000 |
| Apr 22, 2022 | Completed final sign-off Aug 2022 | 32 Pixley St | remodel (1) bathroom and kitchen in kind.Details
remodel (1) bathroom and kitchen in kind. | $34,000 |
| Mar 6, 2017 | Completed final sign-off Nov 2017 | 66 Cleary Ct | remodel kitchen & replace 2 vanities & 2 lights in the bathrooms.Details
remodel kitchen & replace 2 vanities & 2 lights in the bathrooms. | $21,500 |
| Dec 29, 2016 | Expired or cancelled cancelled Feb 2022 | 8 Cuvier St | replace bathroom fan, one window bathroom and two kitchen windows not visible from street.Details
replace bathroom fan, one window bathroom and two kitchen windows not visible from street. | $2,175 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 591 Dolores St | remodel kitchen, bathroom & rewire unit #a.Details
remodel kitchen, bathroom & rewire unit #a. | $50,000 |
| Aug 11, 2016 | Expired or cancelled cancelled Oct 2016 | 1465 Laguna | unit #4: kitchen - replace cabinets and counter top. bathroom - repalace tubs, sink, toilet and tile.Details
unit #4: kitchen - replace cabinets and counter top. bathroom - repalace tubs, sink, toilet and tile. | $18,000 |
| May 6, 2013 | Never finaled issued May 2013, no final | 4024 25th St | remodel bathroom in master bedroom, remove plaster walls in master room & 3 walls on #2 bedroom, install electrical plug in the rooms & kitchen & also laundry room. replace windows, upgrade the electrical system.Details
remodel bathroom in master bedroom, remove plaster walls in master room & 3 walls on #2 bedroom, install electrical plug in the rooms & kitchen & also laundry room. replace windows, upgrade the electrical system. | $22,399 |
| Oct 29, 2012 | Completed final sign-off Dec 2012 | 35 Mallorca Wy | remodel kitchen, new cabinets.Details
remodel kitchen, new cabinets. | $12,800 |
| Feb 23, 2012 | Completed final sign-off May 2012 | 310 Stanyan St | install 1 wall and 2 doors at kitchen and move and install electrical plug. change toilet and sink in bathDetails
install 1 wall and 2 doors at kitchen and move and install electrical plug. change toilet and sink in bath | $1,500 |
| Nov 14, 2011 | Completed final sign-off Jan 2013 | 46 Wanda St | upgrade electrical, new lighting comply with cec150(k), kitchen install cabinets, bathroom retile & new fixtures, no structural work.Details
upgrade electrical, new lighting comply with cec150(k), kitchen install cabinets, bathroom retile & new fixtures, no structural work. | $10,000 |
| Feb 9, 2011 | Completed final sign-off Dec 2011 | 880 Portola Dr | remodel kitchen & two bathrooms & rewired.Details
remodel kitchen & two bathrooms & rewired. | $20,000 |
| Dec 8, 2010 | Completed final sign-off Jul 2011 | 174 Stanyan St | remodel 2 kitchens and 5 baths. lighting to comply with cfc 150 k. no change to walls or windowsDetails
remodel 2 kitchens and 5 baths. lighting to comply with cfc 150 k. no change to walls or windows | $59,000 |
| Mar 9, 2010 | Expired or cancelled cancelled Jan 2026 | 1563 38th Av | kitchen cabinets, and electrical serviceDetails
kitchen cabinets, and electrical service | $6,100 |
| Mar 9, 2010 | Completed final sign-off Apr 2010 | 1563 38th Av | kitchen cabinets upgrade. electrical service to 200 amp.Details
kitchen cabinets upgrade. electrical service to 200 amp. | $6,100 |
| Dec 10, 2007 | Completed final sign-off Jan 2008 | 25 Castenada Av | replace kitchen cabinets & counter tops.Details
replace kitchen cabinets & counter tops. | $5,000 |