Alex R Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 11 permits filed
128 permits since 2000: 103 completed, 3 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 11 completed, 1 never finaled. Typically 2 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | Completed final sign-off Sep 2026 | 319 Mullen Av | revision to pa# 2026-0821-7066: complaint #202660545 remove deckDetails
revision to pa# 2026-0821-7066: complaint #202660545 remove deck | |
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 319 Mullen Av | to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize.Details
to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize. | $10,000 |
| May 11, 2023 | Completed final sign-off Oct 2023 | 2147 40th Av | contruct new deck at rear of house (approx. size 18.5' x 6' x 9.5'h).Details
contruct new deck at rear of house (approx. size 18.5' x 6' x 9.5'h). | $13,000 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 808 22nd St | replace railings at back stairs and deck and reinstall two siding boards at rear. repair in kind.Details
replace railings at back stairs and deck and reinstall two siding boards at rear. repair in kind. | $19,500 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 408 12th Av | repair back balcony or small decks less than 50% & comply nov #201963931Details
repair back balcony or small decks less than 50% & comply nov #201963931 | $22,000 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 1256 Francisco St | revision to app#201804105893. as built deck (roof) drawings, replacing glass railing to wood railing only.Details
revision to app#201804105893. as built deck (roof) drawings, replacing glass railing to wood railing only. | |
| Dec 13, 2018 | Completed final sign-off Aug 2019 | 1256 Francisco St | revision to 201804105893, add reoof deck side of 4th fl family room, replace w alum windows at family room with pair of wood french doorsDetails
revision to 201804105893, add reoof deck side of 4th fl family room, replace w alum windows at family room with pair of wood french doors | $30,000 |
| Mar 14, 2018 | Completed final sign-off Mar 2018 | 107 Germania St | repair back deck less than 50%Details
repair back deck less than 50% | $4,500 |
| Nov 2, 2017 | Completed final sign-off Dec 2017 | 2739 Broderick St | repair deck, less than 50%, 2"x6" joist sisers & 2"x6" decking, not visible from streetDetails
repair deck, less than 50%, 2"x6" joist sisers & 2"x6" decking, not visible from street | $3,600 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 207 Bartlett St | repair back stair & deck, less than 50%. to comply with nov #201782881Details
repair back stair & deck, less than 50%. to comply with nov #201782881 | $2,500 |
| Nov 4, 2016 | Completed final sign-off Dec 2016 | 3867 17th St | repair less 50% of back deck.Details
repair less 50% of back deck. | $8,500 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 100 Putnam St | rebuild wood deck & guard rail over existing roof of 1 story attached garage, new exterior lights & outlets to replace existing.Details
rebuild wood deck & guard rail over existing roof of 1 story attached garage, new exterior lights & outlets to replace existing. | $10,000 |