Alex R Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 11 permits filed
128 permits since 2000: 103 completed, 3 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
30 stairs permits: 27 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 23 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 319 Mullen Av | to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize.Details
to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize. | $10,000 |
| May 14, 2026 | Completed final sign-off May 2026 | 201 Capra Wy | stair repair: in kind, less than 50% repair, back stairs.Details
stair repair: in kind, less than 50% repair, back stairs. | $10,000 |
| Apr 17, 2023 | Expired or cancelled expired Mar 2026 | 915 Burnett Av | repair back stairs landing in-kind; 50% or less of rear stairs.Details
repair back stairs landing in-kind; 50% or less of rear stairs. | $4,500 |
| Sep 8, 2022 | Never finaled issued Sep 2022, no final | 1120 Church St | repair less 50% front stairs both unitsDetails
repair less 50% front stairs both units | $6,500 |
| Jul 8, 2022 | Completed final sign-off Aug 2022 | 3538 24th St | repair back stairs less than 50%Details
repair back stairs less than 50% | $9,800 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 808 22nd St | replace railings at back stairs and deck and reinstall two siding boards at rear. repair in kind.Details
replace railings at back stairs and deck and reinstall two siding boards at rear. repair in kind. | $19,500 |
| Apr 22, 2022 | Completed final sign-off May 2022 | 68 San Jose Av | repair back stairs less than 50%. repair in kind.Details
repair back stairs less than 50%. repair in kind. | $7,800 |
| May 13, 2020 | Completed final sign-off May 2020 | 84 Saturn St | to comply w/nov 202026136 - repair front stairs under 50% in-kind. re-install section of handrail and guard rail, replace damaged steps.Details
to comply w/nov 202026136 - repair front stairs under 50% in-kind. re-install section of handrail and guard rail, replace damaged steps. | $200 |
| Oct 4, 2019 | Completed final sign-off Dec 2019 | 2077 Taylor St | repair back stairs in kind. less than 50%.Details
repair back stairs in kind. less than 50%. | $8,000 |
| May 2, 2018 | Completed final sign-off May 2018 | 68 Lynch St | repair stair on the the back landing, less than 50%. rear of house, all repair in kind. maher naDetails
repair stair on the the back landing, less than 50%. rear of house, all repair in kind. maher na | $2,800 |
| Apr 11, 2018 | Completed final sign-off Apr 2018 | 1321 20th Av | repair back stair less than 50% in-kind, not visible from street, two post. back stair is serving for the residential floor only.Details
repair back stair less than 50% in-kind, not visible from street, two post. back stair is serving for the residential floor only. | $8,000 |
| Apr 10, 2018 | Completed final sign-off Aug 2019 | 1256 Francisco St | remodel: 1st flr - 2 street entries, garage w/1/2 bath, fam rm w/bath, new int stairs.2md flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 3rd flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 4th flr - fam rm, convert 1/2 bath to full bath, new roof deck.Details
remodel: 1st flr - 2 street entries, garage w/1/2 bath, fam rm w/bath, new int stairs.2md flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 3rd flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 4th flr - fam rm, convert 1/2 bath to full bath, new roof deck. | $450,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 207 Bartlett St | repair back stair & deck, less than 50%. to comply with nov #201782881Details
repair back stair & deck, less than 50%. to comply with nov #201782881 | $2,500 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 59 Gaviota Wy | repair back stairs, less than 50%. replace 3 back windows.Details
repair back stairs, less than 50%. replace 3 back windows. | $4,500 |
| Aug 11, 2016 | Completed final sign-off Nov 2016 | 1120 Church St | repair front stairs, less 50%. repair in kind.Details
repair front stairs, less 50%. repair in kind. | $2,000 |
| Apr 29, 2016 | Completed final sign-off Jun 2016 | 72 St Marys Av | repair front stairs less than 50%Details
repair front stairs less than 50% | $4,800 |
| Oct 5, 2015 | Completed final sign-off Oct 2015 | 62 San Jose Av | repair back stairs less than 50%.Details
repair back stairs less than 50%. | $3,400 |
| Oct 5, 2015 | Completed final sign-off Oct 2015 | 162 09th Av | repair front stair stringer in kind & comply with physical inspection report #cc-8000. less than 50% of stair.Details
repair front stair stringer in kind & comply with physical inspection report #cc-8000. less than 50% of stair. | $1,500 |
| Sep 11, 2015 | Completed final sign-off Oct 2015 | 100 Putnam St | revision to work under app#2014-08-27-4883. repair framing and covering of wall between bicycle storage and adjacent storage room. perform electrical and plumbing upgrades. provide 1 hour fire rated ceiling and wall in bicyle storage under exterior stair.Details
revision to work under app#2014-08-27-4883. repair framing and covering of wall between bicycle storage and adjacent storage room. perform electrical and plumbing upgrades. provide 1 hour fire rated ceiling and wall in bicyle storage under exterior stair. | $10,000 |
| Jul 14, 2015 | Completed final sign-off Jul 2015 | 2312 32nd Av | repair side stairs, less 50%. in kindDetails
repair side stairs, less 50%. in kind | $2,800 |
| Mar 4, 2015 | Completed final sign-off Jun 2016 | 1122 Church St | to comply with building report (phycical inspection report) # cc 7825, item #4 (exterior spiral stair). legalize rear spiral stair sering unit #1122 only.Details
to comply with building report (phycical inspection report) # cc 7825, item #4 (exterior spiral stair). legalize rear spiral stair sering unit #1122 only. | $5,000 |
| Oct 20, 2014 | Completed final sign-off Nov 2014 | 261 Ellsworth St | remove existing metal security gate and reails. construct wood guardrails and stair hand rail with 2"x2" balusters between top and bottom rails. space between porch and bottom rail. less than 50% total repair.Details
remove existing metal security gate and reails. construct wood guardrails and stair hand rail with 2"x2" balusters between top and bottom rails. space between porch and bottom rail. less than 50% total repair. | $3,100 |
| Sep 18, 2014 | Completed final sign-off Nov 2014 | 563 Head St | repair front stair less than 50% in kindDetails
repair front stair less than 50% in kind | $7,400 |
| Aug 7, 2012 | Completed final sign-off Sep 2012 | 655 41st Av | repair side stair less than 50%.Details
repair side stair less than 50%. | $2,400 |
| May 24, 2012 | Completed final sign-off Jun 2012 | 126 18th Av | repair back stairs, less than 50%Details
repair back stairs, less than 50% | $1,850 |
| Mar 26, 2012 | Completed final sign-off Jul 2012 | 1548 35th Av | repair dry rot front of house by stair wall & front corner wall. no structural work.Details
repair dry rot front of house by stair wall & front corner wall. no structural work. | $5,000 |
| Oct 24, 2011 | Completed final sign-off Nov 2011 | 1344 09th Av | rear bldg - comply with nov 201162349. repair stairs at front of structure on back building.Details
rear bldg - comply with nov 201162349. repair stairs at front of structure on back building. | $8,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2011 | 1120 Church St | front bldg unit #1120 - interior alterations in basement of unit #1 - add bathroom, master bedroom with walk-in closet, spiral stair.Details
front bldg unit #1120 - interior alterations in basement of unit #1 - add bathroom, master bedroom with walk-in closet, spiral stair. | $50,000 |
| May 2, 2008 | Completed final sign-off May 2008 | 3944 18th St | fix rear stairs less than 50%. repair in kind. work beyond 50% will require plans.Details
fix rear stairs less than 50%. repair in kind. work beyond 50% will require plans. | $2,500 |
| Nov 20, 2007 | Completed final sign-off Nov 2007 | 3826 Folsom St | fixed stairs front of the house- same size & location. less than 50%Details
fixed stairs front of the house- same size & location. less than 50% | $650 |