Back to bathroom remodel contractors
Alex R Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 11 permits filed
128 permits since 2000: 103 completed, 3 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 24 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 319 Mullen Av | to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize.Details
to comply with nov#202660545 item #2: repair back deck, stairs & handrails less than 50%, like for like. item #7: kitchen and bath repair wood rot item #8: repair lights. item #9: repair hand sink. note: this permit will not legalize rear deck, plans required to legalize. | $10,000 |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 111 Joost Av | remove damage drywall on walls + insulate. re install drywall. at lower (1) bathroom.Details
remove damage drywall on walls + insulate. re install drywall. at lower (1) bathroom. | $3,800 |
| Apr 26, 2024 | Completed final sign-off Dec 2024 | 2279 42nd Av | remodel bathroom and kitchen in kind - no change to wall layout and floor layout. no structural work. replace 2 front windows and 2 rear windows in kind - aluminum sliders. same size and location and operation. no structural work. maintain eero per cbc 1031. u-factor 0.30 maxDetails
remodel bathroom and kitchen in kind - no change to wall layout and floor layout. no structural work. replace 2 front windows and 2 rear windows in kind - aluminum sliders. same size and location and operation. no structural work. maintain eero per cbc 1031. u-factor 0.30 max | $24,000 |
| May 1, 2023 | Completed final sign-off Oct 2023 | 2147 40th Av | enlarge (e) bedroom. construct 1 full bathroom & wet bar at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f.Details
enlarge (e) bedroom. construct 1 full bathroom & wet bar at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2/f. | $120,000 |
| Apr 17, 2023 | Completed final sign-off Jul 2023 | 5 Fella Pl | unit 301: replace kitchen cabinets, counter tops. rewire apartment. bathroom retile, replace cabinet, faucet. maintain fire separation with 5/8" type x sheetrock.Details
unit 301: replace kitchen cabinets, counter tops. rewire apartment. bathroom retile, replace cabinet, faucet. maintain fire separation with 5/8" type x sheetrock. | $61,000 |
| Apr 22, 2022 | Completed final sign-off Aug 2022 | 32 Pixley St | remodel (1) bathroom and kitchen in kind.Details
remodel (1) bathroom and kitchen in kind. | $34,000 |
| May 14, 2021 | Completed final sign-off Apr 2022 | 2 Museum Wy | alteration to 1st of e residential building. new bath at e space, new media rm at e excavated space. n window at rear. no change in facadeDetails
alteration to 1st of e residential building. new bath at e space, new media rm at e excavated space. n window at rear. no change in facade | $20,000 |
| Feb 26, 2021 | Completed final sign-off Apr 2021 | 20 Powers Av | repair bathtub, sink, and toilet/ bathroom (no moving walls)Details
repair bathtub, sink, and toilet/ bathroom (no moving walls) | $10,000 |
| Apr 10, 2018 | Completed final sign-off Aug 2019 | 1256 Francisco St | remodel: 1st flr - 2 street entries, garage w/1/2 bath, fam rm w/bath, new int stairs.2md flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 3rd flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 4th flr - fam rm, convert 1/2 bath to full bath, new roof deck.Details
remodel: 1st flr - 2 street entries, garage w/1/2 bath, fam rm w/bath, new int stairs.2md flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 3rd flr - liv rm, din rm, kit 3 bed, 2 baths, ldry rm. 4th flr - fam rm, convert 1/2 bath to full bath, new roof deck. | $450,000 |
| Mar 6, 2017 | Completed final sign-off Nov 2017 | 66 Cleary Ct | remodel kitchen & replace 2 vanities & 2 lights in the bathrooms.Details
remodel kitchen & replace 2 vanities & 2 lights in the bathrooms. | $21,500 |
| Dec 29, 2016 | Expired or cancelled cancelled Feb 2022 | 8 Cuvier St | replace bathroom fan, one window bathroom and two kitchen windows not visible from street.Details
replace bathroom fan, one window bathroom and two kitchen windows not visible from street. | $2,175 |
| Dec 29, 2016 | Completed final sign-off May 2017 | 1 Daniel Burnham Ct | remodel kithen and bathroom in-kind. no changes to wall locations.Details
remodel kithen and bathroom in-kind. no changes to wall locations. | $28,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 591 Dolores St | remodel kitchen, bathroom & rewire unit #a.Details
remodel kitchen, bathroom & rewire unit #a. | $50,000 |
| Aug 11, 2016 | Expired or cancelled cancelled Oct 2016 | 1465 Laguna | unit #4: kitchen - replace cabinets and counter top. bathroom - repalace tubs, sink, toilet and tile.Details
unit #4: kitchen - replace cabinets and counter top. bathroom - repalace tubs, sink, toilet and tile. | $18,000 |
| Jan 22, 2015 | Completed final sign-off Apr 2015 | 62 Glenview Dr | repair dry rot corner of bedrom floor. rewire house and service panel. replace 3 rear windows and 2 front windows with fiber glass wood clad windows in kind. insulate garage ceiling and drywall bathroom sinkDetails
repair dry rot corner of bedrom floor. rewire house and service panel. replace 3 rear windows and 2 front windows with fiber glass wood clad windows in kind. insulate garage ceiling and drywall bathroom sink | $9,500 |
| Jan 7, 2014 | Completed final sign-off Feb 2014 | 83 Sylvan Dr | comply with nov 201341721. legalize bathroom and family room & laundry room at gr floorDetails
comply with nov 201341721. legalize bathroom and family room & laundry room at gr floor | $46,182 |
| May 6, 2013 | Never finaled issued May 2013, no final | 4024 25th St | remodel bathroom in master bedroom, remove plaster walls in master room & 3 walls on #2 bedroom, install electrical plug in the rooms & kitchen & also laundry room. replace windows, upgrade the electrical system.Details
remodel bathroom in master bedroom, remove plaster walls in master room & 3 walls on #2 bedroom, install electrical plug in the rooms & kitchen & also laundry room. replace windows, upgrade the electrical system. | $22,399 |
| Feb 23, 2012 | Completed final sign-off May 2012 | 310 Stanyan St | install 1 wall and 2 doors at kitchen and move and install electrical plug. change toilet and sink in bathDetails
install 1 wall and 2 doors at kitchen and move and install electrical plug. change toilet and sink in bath | $1,500 |
| Nov 14, 2011 | Completed final sign-off Jan 2013 | 46 Wanda St | upgrade electrical, new lighting comply with cec150(k), kitchen install cabinets, bathroom retile & new fixtures, no structural work.Details
upgrade electrical, new lighting comply with cec150(k), kitchen install cabinets, bathroom retile & new fixtures, no structural work. | $10,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2011 | 1120 Church St | front bldg unit #1120 - interior alterations in basement of unit #1 - add bathroom, master bedroom with walk-in closet, spiral stair.Details
front bldg unit #1120 - interior alterations in basement of unit #1 - add bathroom, master bedroom with walk-in closet, spiral stair. | $50,000 |
| Feb 9, 2011 | Completed final sign-off Jun 2011 | 49 Clayton St | new service panel 200 amp for #49-51 clayton. remodel 1/2 bath & rewired 5 rooms for #51 clayton. provide high efficany lights in unit #51Details
new service panel 200 amp for #49-51 clayton. remodel 1/2 bath & rewired 5 rooms for #51 clayton. provide high efficany lights in unit #51 | $8,500 |
| Feb 9, 2011 | Completed final sign-off Dec 2011 | 880 Portola Dr | remodel kitchen & two bathrooms & rewired.Details
remodel kitchen & two bathrooms & rewired. | $20,000 |
| Dec 30, 2010 | Completed final sign-off Jun 2011 | 49 Clayton St | remodel 1/2 bathroom & new service panel, 200 amp & re-wired 5 rooms. provide high efficacy or manual on occupancy sensor. no other workDetails
remodel 1/2 bathroom & new service panel, 200 amp & re-wired 5 rooms. provide high efficacy or manual on occupancy sensor. no other work | $8,500 |
| Dec 8, 2010 | Completed final sign-off Jul 2011 | 174 Stanyan St | remodel 2 kitchens and 5 baths. lighting to comply with cfc 150 k. no change to walls or windowsDetails
remodel 2 kitchens and 5 baths. lighting to comply with cfc 150 k. no change to walls or windows | $59,000 |
| Dec 10, 2009 | Never finaled issued Jul 2022, no final | 2424 Folsom St | make/build a garage in (e) building (basement level), legalize (e) & full bathroom and storage sprinklers under seperate permitDetails
make/build a garage in (e) building (basement level), legalize (e) & full bathroom and storage sprinklers under seperate permit | $25,000 |
| Jan 17, 2008 | Completed final sign-off May 2008 | 125 Hancock St | bathroom remodel. no structural work. light fixture to be fluorescent or on occupant sensor.Details
bathroom remodel. no structural work. light fixture to be fluorescent or on occupant sensor. | $3,000 |
| Oct 23, 2007 | Completed final sign-off Nov 2007 | 3826 Folsom St | retile walls and floor, remove and replace toilet. remodel bathroomDetails
retile walls and floor, remove and replace toilet. remodel bathroom | $3,500 |
| Jun 5, 2007 | Completed final sign-off Oct 2007 | 60 Nebraska St | create new study room in basement, legalize (e) bathroom in basement. legalize reinforced (e) foundation at groundfloor's north wall.Details
create new study room in basement, legalize (e) bathroom in basement. legalize reinforced (e) foundation at groundfloor's north wall. | $15,000 |