Back to kitchen remodel contractors
Adan Flores General Contractor
- Based in
- Richmond
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 3 permits filed
125 permits since 2000: 91 completed, 2 in progress, 15 never finaled, 17 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 never finaled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 152 Day St | kitchen remodel in kind electric and plumbing workDetails
kitchen remodel in kind electric and plumbing work | $26,000 |
| Aug 4, 2021 | Completed final sign-off Oct 2021 | 956 Potrero Av | kitchen remodel in kind, remove old cabinets and install new cabinets new sink, remove and replace 5 kitchen windows. replacement windows max. u-factor = 0.40Details
kitchen remodel in kind, remove old cabinets and install new cabinets new sink, remove and replace 5 kitchen windows. replacement windows max. u-factor = 0.40 | $23,000 |
| Jan 6, 2021 | Completed final sign-off Apr 2021 | 1927 Page St | kitchen remodel in kind. remove plaster wals. new sheetrock. relocate ghs line. remove 600 sqft of old plaster walls and replace with new sheetrock.Details
kitchen remodel in kind. remove plaster wals. new sheetrock. relocate ghs line. remove 600 sqft of old plaster walls and replace with new sheetrock. | $28,500 |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 958 Oak St | kitchen remodel - remove old cabinets - sink and hood. install 4 new dedicated eletrical plugs install new cabinets, new sink, new range hood. layout stays the same.Details
kitchen remodel - remove old cabinets - sink and hood. install 4 new dedicated eletrical plugs install new cabinets, new sink, new range hood. layout stays the same. | $15,000 |
| Aug 6, 2018 | Completed final sign-off Oct 2020 | 237 Onondaga Av | remove and replace old kitchen cabinets and sink. install new gas heating units and ducting insulation. update the old electric panel, install 125 amp. remove and replace 3 front windows in-kind with wood double hung windows.Details
remove and replace old kitchen cabinets and sink. install new gas heating units and ducting insulation. update the old electric panel, install 125 amp. remove and replace 3 front windows in-kind with wood double hung windows. | $28,000 |
| Feb 7, 2018 | Completed final sign-off May 2018 | 26 Eugenia Av | to comply with nov# 201725231, kitchen remodel & main electrical panel upgradeDetails
to comply with nov# 201725231, kitchen remodel & main electrical panel upgrade | $12,500 |
| Jul 28, 2014 | Never finaled issued Jul 2014, no final | 164 Sadowa St | kitchen remodel - remove all existing cabinets and install new cabinets, update all kitchen electrical plugs and install new range hood, stove and sink. new flooring and paint. no new wall and no existing wall relocation. all lighting in kitchen remodel shall comply with cec 150.0(k)3.Details
kitchen remodel - remove all existing cabinets and install new cabinets, update all kitchen electrical plugs and install new range hood, stove and sink. new flooring and paint. no new wall and no existing wall relocation. all lighting in kitchen remodel shall comply with cec 150.0(k)3. | $16,500 |
| Oct 31, 2008 | Completed final sign-off Feb 2011 | 74 Carmelita St | build (3) new utility closets on the ground floor area, (1) 10'x14 and (2) 30"x30". kitchen area: build new ceiling soffit to hide the duct pipe elbow.Details
build (3) new utility closets on the ground floor area, (1) 10'x14 and (2) 30"x30". kitchen area: build new ceiling soffit to hide the duct pipe elbow. | $1,500 |
| Jan 3, 2006 | Completed final sign-off Sep 2006 | 2800 34th Av | remodel the (e) kitchen following the set of approved plans design.Details
remodel the (e) kitchen following the set of approved plans design. | $29,000 |
| Sep 1, 2000 | Completed final sign-off Nov 2000 | 686 03rd Av | kitchen remodel, remove exisitng wall & base cabinets.etcDetails
kitchen remodel, remove exisitng wall & base cabinets.etc | $24,000 |