Block 0864, lot 017
74 Carmelita St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 2,381 sq ft
- Lot
- 2,374 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 74 Carmelita St | Adan Flores General Contractor | to obtain final inspection for work approved under pa#2012-03-05-5390 & 2013-03-19-2521. all work is complete.Details
to obtain final inspection for work approved under pa#2012-03-05-5390 & 2013-03-19-2521. all work is complete. | |
| Jul 23, 2013 | Never finaled issued Jul 2013, no final | 74 Carmelita St | street spaceDetails
street space | ||
| Mar 19, 2013 | Expired or cancelled expired Sep 2016 | 74 Carmelita St | Adan Flores General Contractor | revision to appl #2012.03.05.5390-s1 - replace north property line & interior middle footings, new bath @ ground floor. replace post and beams at ground floor with load bearing wall.Details
revision to appl #2012.03.05.5390-s1 - replace north property line & interior middle footings, new bath @ ground floor. replace post and beams at ground floor with load bearing wall. | $10,000 |
| Mar 5, 2012 | Expired or cancelled expired Sep 2016 | 74 Carmelita St | Adan Flores General Contractor | remodel lower level storage area for new garage, new driveway & garage door.Details
remodel lower level storage area for new garage, new driveway & garage door. | $20,000 |
| Mar 17, 2010 | Completed final sign-off Feb 2011 | 74 Carmelita St | to obtain final inspection for work approved under pa 200804169905; all work is completeDetails
to obtain final inspection for work approved under pa 200804169905; all work is complete | ||
| Oct 31, 2008 | Completed final sign-off Feb 2011 | 74 Carmelita St | Adan Flores General Contractor | build (3) new utility closets on the ground floor area, (1) 10'x14 and (2) 30"x30". kitchen area: build new ceiling soffit to hide the duct pipe elbow.Details
build (3) new utility closets on the ground floor area, (1) 10'x14 and (2) 30"x30". kitchen area: build new ceiling soffit to hide the duct pipe elbow. | $1,500 |
| Apr 16, 2008 | Expired or cancelled expired Mar 2009 | 74 Carmelita St | Adan Flores General Contractor | to renew pa#2006/11/03/6840 amd 2006/06/30/5507 for final insp. only.Details
to renew pa#2006/11/03/6840 amd 2006/06/30/5507 for final insp. only. | |
| Nov 3, 2006 | Expired or cancelled expired Aug 2007 | 74 Carmelita St | Adan Flores General Contractor | amendment to job card #200606305507. expand scope of remodel to include the removal of wall between kchn and dining room and the addition of a 1/2 bathDetails
amendment to job card #200606305507. expand scope of remodel to include the removal of wall between kchn and dining room and the addition of a 1/2 bath | $10,000 |
| Aug 17, 2006 | Completed final sign-off Sep 2006 | 74 Carmelita St | Adan Flores General Contractor | dry rot repair following termite report # 06770 mark off structural. dated 7/11/06 items # 1, 3, 4 only. item 4. 8 inch concrete with #3 at 16 inch o.c. with 7 inch embedment and anchor bolts per 1806.6 of cbc. item 4 remove bottom sill wall plate and reinforce concrete caps as needed. 8 inch heightDetails
dry rot repair following termite report # 06770 mark off structural. dated 7/11/06 items # 1, 3, 4 only. item 4. 8 inch concrete with #3 at 16 inch o.c. with 7 inch embedment and anchor bolts per 1806.6 of cbc. item 4 remove bottom sill wall plate and reinforce concrete caps as needed. 8 inch height | $6,500 |
| Jun 30, 2006 | Expired or cancelled expired Mar 2009 | 74 Carmelita St | remodel (e) kitchen. surfaces (walls, ceiling, floor). remove closetDetails
remodel (e) kitchen. surfaces (walls, ceiling, floor). remove closet | $2,000 | |
| Jun 19, 2006 | Completed final sign-off Aug 2006 | 74 Carmelita St | remoe all existing fixtures and fineshes. relocate toilet, sink,tub pplumbing. replace all finishes. install all fixtures. one bathroom only.Details
remoe all existing fixtures and fineshes. relocate toilet, sink,tub pplumbing. replace all finishes. install all fixtures. one bathroom only. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Adan Flores General Contractor (7)
- Engineers
- Donald David (2)
Find contractors for work like this