Block 6633, lot 013A
152 Day St
- City’s use
- Multi-Family Residential
- Built
- 1953
- Stories
- 2
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 3,524 sq ft
- Lot
- 3,990 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 152 Day St | Adan Flores General Contractor | kitchen remodel in kind electric and plumbing workDetails
kitchen remodel in kind electric and plumbing work | $26,000 |
| Oct 4, 2021 | Completed final sign-off Dec 2021 | 152 Day St | Adan Flores General Contractor | bathroom remodel in kind replace toilet, sink and shower faucet, new drywall and new tile workDetails
bathroom remodel in kind replace toilet, sink and shower faucet, new drywall and new tile work | $21,000 |
| Jan 8, 2019 | Expired or cancelled cancelled Nov 2022 | 150 Day St | Adan Flores General Contractor | legalize an (e) unit per ord# 43-14. non-legal unit is a 1-bedroom, 1 bathroom unit. per no. fs-05. 1st flr egress pathway & legalized unit req'd fire sprinkler system. fire-sprinkler wiil be under separate permit. per info sheet g-17#2, a application shall be filed for street tree.Details
legalize an (e) unit per ord# 43-14. non-legal unit is a 1-bedroom, 1 bathroom unit. per no. fs-05. 1st flr egress pathway & legalized unit req'd fire sprinkler system. fire-sprinkler wiil be under separate permit. per info sheet g-17#2, a application shall be filed for street tree. | $25,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 150 Day St | street spaceDetails
street space | ||
| Dec 29, 2015 | Completed final sign-off May 2016 | 150 Day St | Rudd Kitchen And Bath | remove walls, ceiling, floors, replace toilet ,vanity,tub. electrical as nedded for design /code. replace showe rvalve, install vent fan if possible. replace (e) window sashes, no change to exterior.Details
remove walls, ceiling, floors, replace toilet ,vanity,tub. electrical as nedded for design /code. replace showe rvalve, install vent fan if possible. replace (e) window sashes, no change to exterior. | $12,000 |
| May 23, 2014 | Completed final sign-off Oct 2014 | 150 Day St | Adan Flores General Contractor | bathroom remodel to include bathtub/ shower heard relocation, new tile work, toilet fixture replacement; no structural work required. to comply with cec150k) 10Details
bathroom remodel to include bathtub/ shower heard relocation, new tile work, toilet fixture replacement; no structural work required. to comply with cec150k) 10 | $11,000 |
| Apr 20, 2009 | Completed final sign-off Jun 2009 | 150 Day St | Hubert Penny | work @ unit# 150 only. remodel kitchen. install new plugs under cabinet lights under new sink.Details
work @ unit# 150 only. remodel kitchen. install new plugs under cabinet lights under new sink. | $9,200 |
| Aug 29, 2000 | Expired or cancelled expired Feb 2001 | 150 Day St | American Roofing Co. | reroofingDetails
reroofing | $12,500 |
| Jun 15, 2000 | Completed final sign-off Jun 2000 | 150 Day St | American Roofing Co. | re roofingDetails
re roofing | $1,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Adan Flores General Contractor (4), American Roofing Co. (2), Hubert Penny, Rudd Kitchen And Bath
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.