Adan Flores General Contractor
- Based in
- Richmond
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 3 permits filed
125 permits since 2000: 91 completed, 2 in progress, 15 never finaled, 17 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2014 | Completed final sign-off Jun 2014 | 32 Knollview Wy | dry rot repair item #2 only report #14305 on deck (less than 50% deck)Details
dry rot repair item #2 only report #14305 on deck (less than 50% deck) | $3,300 |
| Nov 9, 2012 | Completed final sign-off Nov 2012 | 70 Wilder St | dryrot repair only, item #1 from report# 12866 deck area from markoff structural pest control.Details
dryrot repair only, item #1 from report# 12866 deck area from markoff structural pest control. | $2,500 |
| Jun 4, 2009 | Completed final sign-off Sep 2009 | 309 Baden St | replace the existing rotted deck layer board, 2"x10'x12', install new p.t. same size as the existing only (less than 50% of deck)Details
replace the existing rotted deck layer board, 2"x10'x12', install new p.t. same size as the existing only (less than 50% of deck) | $1,200 |
| Feb 21, 2007 | Completed final sign-off Feb 2008 | 2674 22nd St | a deck is to be built in the rear of the house and the (e) exterior stair replace.Details
a deck is to be built in the rear of the house and the (e) exterior stair replace. | $12,000 |