Back to bathroom remodel contractors
Adan Flores General Contractor
- Based in
- Richmond
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 3 permits filed
125 permits since 2000: 91 completed, 2 in progress, 15 never finaled, 17 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 7 completed, 3 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2022 | Completed final sign-off May 2022 | 1925 Page St | one bathroom remodeling in kind. remove old bathtub and install new shower 60" x 36". new sink and facets, fan. replace (e) one window, not visible from street.Details
one bathroom remodeling in kind. remove old bathtub and install new shower 60" x 36". new sink and facets, fan. replace (e) one window, not visible from street. | $28,000 |
| Oct 4, 2021 | Completed final sign-off Dec 2021 | 152 Day St | bathroom remodel in kind replace toilet, sink and shower faucet, new drywall and new tile workDetails
bathroom remodel in kind replace toilet, sink and shower faucet, new drywall and new tile work | $21,000 |
| Oct 21, 2020 | Completed final sign-off Jan 2021 | 1927 Page St | bathroom remodel in kind. remove plaster wall and install new drywall. install new shower base 60"x30" install new sink 30" and medicine cabinet.Details
bathroom remodel in kind. remove plaster wall and install new drywall. install new shower base 60"x30" install new sink 30" and medicine cabinet. | $20,000 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 958 Oak St | bathroom remodeling - remove old plaster, old bath tub, sink and toilet install new ones. install new fan. new drywall, bath room remodel in kind.Details
bathroom remodeling - remove old plaster, old bath tub, sink and toilet install new ones. install new fan. new drywall, bath room remodel in kind. | $12,500 |
| Jan 8, 2019 | Expired or cancelled cancelled Nov 2022 | 150 Day St | legalize an (e) unit per ord# 43-14. non-legal unit is a 1-bedroom, 1 bathroom unit. per no. fs-05. 1st flr egress pathway & legalized unit req'd fire sprinkler system. fire-sprinkler wiil be under separate permit. per info sheet g-17#2, a application shall be filed for street tree.Details
legalize an (e) unit per ord# 43-14. non-legal unit is a 1-bedroom, 1 bathroom unit. per no. fs-05. 1st flr egress pathway & legalized unit req'd fire sprinkler system. fire-sprinkler wiil be under separate permit. per info sheet g-17#2, a application shall be filed for street tree. | $25,000 |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 490 Monterey Bl | bathroom remodel. remove and replace all plumbing fixtures, same as existing. install new fand and light. new drywall and re-tiles, wet walls and 1/ bathroom walls.Details
bathroom remodel. remove and replace all plumbing fixtures, same as existing. install new fand and light. new drywall and re-tiles, wet walls and 1/ bathroom walls. | $16,500 |
| May 23, 2014 | Completed final sign-off Oct 2014 | 150 Day St | bathroom remodel to include bathtub/ shower heard relocation, new tile work, toilet fixture replacement; no structural work required. to comply with cec150k) 10Details
bathroom remodel to include bathtub/ shower heard relocation, new tile work, toilet fixture replacement; no structural work required. to comply with cec150k) 10 | $11,000 |
| Feb 6, 2014 | Completed final sign-off Mar 2015 | 56 Seal Rock Dr | construct new full bathroom at ground floorDetails
construct new full bathroom at ground floor | $12,000 |
| Mar 19, 2013 | Expired or cancelled expired Sep 2016 | 74 Carmelita St | revision to appl #2012.03.05.5390-s1 - replace north property line & interior middle footings, new bath @ ground floor. replace post and beams at ground floor with load bearing wall.Details
revision to appl #2012.03.05.5390-s1 - replace north property line & interior middle footings, new bath @ ground floor. replace post and beams at ground floor with load bearing wall. | $10,000 |
| Apr 18, 2007 | Expired or cancelled expired Sep 2009 | 2439 24th St | replace 7 windows at rear replace wall plaster, remodel 1 kich, remodel 1 bathroom, replace central heater. replace electric wiring all at 2nd floor windows visable from street. 5/8" type x gyp bd at walls and ceilingDetails
replace 7 windows at rear replace wall plaster, remodel 1 kich, remodel 1 bathroom, replace central heater. replace electric wiring all at 2nd floor windows visable from street. 5/8" type x gyp bd at walls and ceiling | $25,000 |
| Nov 3, 2006 | Expired or cancelled expired Aug 2007 | 74 Carmelita St | amendment to job card #200606305507. expand scope of remodel to include the removal of wall between kchn and dining room and the addition of a 1/2 bathDetails
amendment to job card #200606305507. expand scope of remodel to include the removal of wall between kchn and dining room and the addition of a 1/2 bath | $10,000 |
| Jan 20, 2006 | Never finaled issued Jan 2006, no final | 2800 34th Av | remodel existing bath in basement area. 1/2 bath, new bathtub, toilet, sink, fan. new shtrk for wetwalls only. flourescent lightingDetails
remodel existing bath in basement area. 1/2 bath, new bathtub, toilet, sink, fan. new shtrk for wetwalls only. flourescent lighting | $20,000 |
| Jun 30, 2004 | Expired or cancelled expired Dec 2006 | 1115 York St | building bathroom final inspection renew pa 200105179474Details
building bathroom final inspection renew pa 200105179474 | |
| May 8, 2003 | Never finaled issued May 2003, no final | 1115 York St | renew appication new bathroom back part of the house to complete work under pa#200105179474Details
renew appication new bathroom back part of the house to complete work under pa#200105179474 | $2,000 |
| Sep 1, 2000 | Completed final sign-off Nov 2000 | 686 03rd Av | bathroom remodeling, replace existing w/ new ones bathtub, toilet,sink, medicine cabinets, tile, neDetails
bathroom remodeling, replace existing w/ new ones bathtub, toilet,sink, medicine cabinets, tile, ne | $8,500 |