Deck contractors in San Francisco
4,317 contractors have filed deck permits in San Francisco since 2000. By permit record, the leaders are: Gil Construction & Assoc Inc. (99 of 107 completed), M & L Construction (70 of 76 completed) and Saarman Construction,Ltd. (68 of 74 completed).
Ranked across every deck permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the deck contractors, the 400 that lead on this sort were read; the rest are not in this list. Show only contractors active in the last 5 years
- 1Gil Construction & Assoc Inc.License 703705 107 permits: 99 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Last filed May 2026. Typically 62 days from permit to final inspection. Never finaled: 2 are over 10 years old.
- 2M & L ConstructionLicense 832092 76 permits: 70 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Last filed Aug 2026. Typically 55 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old, 1 is 5 to 10 years old.
- 3Saarman Construction,Ltd.License 450928 74 permits: 68 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Last filed Apr 2026. Typically 146 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 1 is over 10 years old.
- 4Chl Construction CompanyLicense 960561 19 permits: 17 completed, 2 in progress. Last filed Jun 2026. Typically 227 days from permit to final inspection.
- 5Yao Star ConstructionLicense 969667 18 permits: 17 completed, 1 in progress. Last filed Sep 2025. Typically 269 days from permit to final inspection.
- 6Aaron Gordon Construction IncLicense 856802 41 permits: 38 completed, 1 in progress, 2 expired or cancelled. Last filed Apr 2024. Typically 52 days from permit to final inspection.
- 7Lei's Construction CompanyLicense 593386 16 permits: 16 completed. Last filed Sep 2018. Typically 158 days from permit to final inspection.
- 8Lingruen AssociatesLicense 6705 36 permits: 34 completed, 1 never finaled, 1 expired or cancelled. Last filed Aug 2021. Typically 24 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 9Sure, Inc.License 561658 27 permits: 24 completed, 2 in progress, 1 never finaled. Last filed Jul 2026. Typically 78 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 10Handy Construction Team IncLicense 828102 14 permits: 14 completed. Last filed Oct 2024. Typically 56 days from permit to final inspection.
- 11Mike CahalanLicense 582766 14 permits: 14 completed. Last filed Apr 2019. Typically 42 days from permit to final inspection.
- 12Mulhall Construction Inc.License 916895 14 permits: 14 completed. Last filed Dec 2017. Typically 312 days from permit to final inspection.
- 13Hing Wah Construction IncLicense 662696 34 permits: 32 completed, 1 never finaled, 1 expired or cancelled. Last filed Aug 2019. Typically 375 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 14Blue Mountain Construction Services IncLicense 398668 24 permits: 23 completed, 1 never finaled. Last filed Aug 2017. Typically 536 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 15Bashland Inc. Dba Bashland BuildersLicense 382913 14 permits: 13 completed, 1 in progress. Last filed Jul 2022. Typically 140 days from permit to final inspection.
- 16Merlyn ConstructionLicense 1024274 14 permits: 13 completed, 1 in progress. Last filed Mar 2026. Typically 64 days from permit to final inspection.
- 17Darc Ventures Inc Dba Spl Construction SLicense 938513 13 permits: 13 completed. Last filed Jul 2025. Typically 147 days from permit to final inspection.
- 18Kevin Llorente ConstructionLicense 939133 12 permits: 12 completed. Last filed Apr 2022. Typically 144 days from permit to final inspection.
- 19Traube Construction CompanyLicense 974146 12 permits: 12 completed. Last filed Oct 2024. Typically 239 days from permit to final inspection.
- 20Urban Builder General Contracting IncLicense 869710 23 permits: 20 completed, 2 in progress, 1 never finaled. Last filed Feb 2026. Typically 238 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 21Ravano & Cooney Const Co IncLicense 689239 36 permits: 33 completed, 3 never finaled. Last filed May 2011. Typically 163 days from permit to final inspection. Never finaled: 3 are over 10 years old.
- 22Spryscapes Const Inc.License 776680 36 permits: 33 completed, 3 expired or cancelled. Last filed Aug 2022. Typically 105 days from permit to final inspection.
- 23All Homes And Construction IncLicense 1057641 20 permits: 19 completed, 1 expired or cancelled. Last filed Jun 2026. Typically 297 days from permit to final inspection.
- 24Damar Construction And Remodeling IncLicense 946514 12 permits: 11 completed, 1 in progress. Last filed Mar 2026. Typically 160 days from permit to final inspection.
- 25Bbc Construction Inc.License 800744 11 permits: 11 completed. Last filed Apr 2023. Typically 79 days from permit to final inspection.
- 26Goffo Construction IncLicense 595587 11 permits: 11 completed. Last filed Oct 2014. Typically 18 days from permit to final inspection.
- 27Hammerhouse ConstructionLicense 804459 11 permits: 11 completed. Last filed Nov 2022. Typically 303 days from permit to final inspection.
- 28Mascheroni ConstructionLicense 754674 11 permits: 11 completed. Last filed Jun 2022. Typically 362 days from permit to final inspection.
- 29Red Bridge Construction IncLicense 876051 11 permits: 11 completed. Last filed Nov 2019. Typically 60 days from permit to final inspection.
- 30D S Management Inc Dba Metrocon BuildersLicense 978867 11 permits: 10 completed, 1 in progress. Last filed Oct 2025. Typically 332 days from permit to final inspection.
- 31Outerlands Design IncLicense 1026243 11 permits: 10 completed, 1 in progress. Last filed Dec 2025. Typically 390 days from permit to final inspection.
- 32Tao's Construction Inc.License 1044068 11 permits: 10 completed, 1 in progress. Last filed Jul 2025. Typically 265 days from permit to final inspection.
- 33Bespoke ConstructionLicense 867351 10 permits: 10 completed. Last filed May 2015. Typically 138 days from permit to final inspection.
- 34Gech Inc.License 882641 10 permits: 10 completed. Last filed Oct 2023. Typically 51 days from permit to final inspection.
- 35Hearth CorporationLicense 955784 10 permits: 10 completed. Last filed Apr 2025. Typically 320 days from permit to final inspection.
- 36James WhereatLicense 571497 10 permits: 10 completed. Last filed Nov 2014. Typically 102 days from permit to final inspection.
- 37Mc Gibbon ConstructionLicense 968064 10 permits: 10 completed. Last filed Dec 2018. Typically 26 days from permit to final inspection.
- 38Modern Craft ConstructionLicense 984971 10 permits: 10 completed. Last filed Aug 2024. Typically 246 days from permit to final inspection.
- 39O'pro Construction Inc.License 1029997 10 permits: 10 completed. Last filed Jan 2026. Typically 474 days from permit to final inspection.
- 40S F Bay Construction IncLicense 807049 10 permits: 10 completed. Last filed Apr 2017. Typically 140 days from permit to final inspection.
How long deck permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent deck permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 1462 09th Av | install a platform lift in the back, to access the deck.Details
install a platform lift in the back, to access the deck. | $35,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 422 Corbett Av | J R Home Remodeling Inc | revision of the permit#202505156593, composite decking 1/6 and steel cable railing.Details
revision of the permit#202505156593, composite decking 1/6 and steel cable railing. | $6,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 549 Orizaba Av | Todd Felix Costanza | dry rot repair to existing backyard deck @ rear. less than 50% replacementDetails
dry rot repair to existing backyard deck @ rear. less than 50% replacement | $10,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 55 Elizabeth St | Yk Construction Experts | like for like siding replacement from wood siding to fiber cement james hardie 7 inch reveal lap siding. like for like deck landing replacement from wood to trex composite material.Details
like for like siding replacement from wood siding to fiber cement james hardie 7 inch reveal lap siding. like for like deck landing replacement from wood to trex composite material. | $37,296 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 9 Carpenter Ct | reconstruct wood deck and new fire wall @ rear; rear yard varianceDetails
reconstruct wood deck and new fire wall @ rear; rear yard variance | $15,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 646 Duncan St | interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112Details
interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112 | $200,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 49 Conrad St | new third floor with front and rear deck; renovation of existing second floor and extended deck; renovation of existing bonus room; and fully seismic retrofit.Details
new third floor with front and rear deck; renovation of existing second floor and extended deck; renovation of existing bonus room; and fully seismic retrofit. | $100,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 147 04th Av | Blair Burke General Contractors Inc | revision to bpa # 2025-1224-2616 project scope to add 4th story vertical addition, of 702 sf. and deck and staircase at 2/f at rear.Details
revision to bpa # 2025-1224-2616 project scope to add 4th story vertical addition, of 702 sf. and deck and staircase at 2/f at rear. | $250,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1601 Diamond St | Nk Construction & Real Estate Developmen | remodel of existing lower, main and upper levels of 3 story residence with lower level addition and horizontal addition at front and rear. improvments include interior remodel. exterior facelift, doors, windows added, new rear deck, and foundation replacment.Details
remodel of existing lower, main and upper levels of 3 story residence with lower level addition and horizontal addition at front and rear. improvments include interior remodel. exterior facelift, doors, windows added, new rear deck, and foundation replacment. | $450,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 171 Margaret Av | repair and partially replace existing residential decks. addition to decks at rear of structureDetails
repair and partially replace existing residential decks. addition to decks at rear of structure | $60,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit.Details
1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 286 25th Av | Integrity Design And Build Group | repair deck in-kind less than 50%. replace 17 total windows, including 7 front windows to be in-kind with vinyl, visible to street.Details
repair deck in-kind less than 50%. replace 17 total windows, including 7 front windows to be in-kind with vinyl, visible to street. | $5,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodelDetails
demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 36 Rivoli St | Golden State Builders Group Inc | structural enhancement to construct a new roof and deck.Details
structural enhancement to construct a new roof and deck. | $20,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 243 Rey St | Freestone Reconstruction Inc | like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage.Details
like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage. | $65,000 |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 889 44th Av | revision to pa #202605221784. revise plans describing deck construction.Details
revision to pa #202605221784. revise plans describing deck construction. | ||
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 606 Clarendon Av | r/r damaged decking, joists, beams, post and guardrails.Details
r/r damaged decking, joists, beams, post and guardrails. | $12,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 662 Clarendon Av | r/r damaged decking, joists, beams, post and guardrails.Details
r/r damaged decking, joists, beams, post and guardrails. | $12,000 | |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 2555 Sacramento St | address/abate notice of violation 202543968 for rear yard deck extension less than 3 feet above grade.Details
address/abate notice of violation 202543968 for rear yard deck extension less than 3 feet above grade. | $7,500 | |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 1838 11th Av | add new wood-framed first and 2nd floor decks in the rear. no firewall construction. change family room to closet on the ground floor.Details
add new wood-framed first and 2nd floor decks in the rear. no firewall construction. change family room to closet on the ground floor. | $35,000 | |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 67 Everson St | A L Martin Construction | renovate (e) 2 story house. provide veritcal addition above (e) residence. convert part of (e) basement into new adu. new windows & finishes throughout. new deck at rear yard. new open fence at front yard. seismic upgrade & new fire sprinkler system throughout.Details
renovate (e) 2 story house. provide veritcal addition above (e) residence. convert part of (e) basement into new adu. new windows & finishes throughout. new deck at rear yard. new open fence at front yard. seismic upgrade & new fire sprinkler system throughout. | $1,194,404 |
| Sep 28, 2026 | In progress issued Sep 2026 | 270 Parker Av | D3 Construction | remove non-compliant ballaster and add 2x2 ballasters no greater than 4" apart at rear deck/stairs. (2x4 horizontal). not visible from the street.Details
remove non-compliant ballaster and add 2x2 ballasters no greater than 4" apart at rear deck/stairs. (2x4 horizontal). not visible from the street. | $3,500 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 130 Caine Av | relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater.Details
relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater. | $100,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 17 Alpha St | remove & replace (e) deck exterior.Details
remove & replace (e) deck exterior. | $9,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 564 Alvarado St | interior renovation at 1st, 2nd, 3rd, floors including new conditioned space at 1st floor, kitchen renovation, new bathroom at third floor, and new finishes throughout, new windows and foors at rear, new roof, and new deck material at covered porch.Details
interior renovation at 1st, 2nd, 3rd, floors including new conditioned space at 1st floor, kitchen renovation, new bathroom at third floor, and new finishes throughout, new windows and foors at rear, new roof, and new deck material at covered porch. | $495,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 655 Noe St | front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths.Details
front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths. | $500,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 61 Pearl St | to comply wiht nov 202654861; metal stair case approx 20' in height and located in the rear commiting the ground floor for the second story deck.Details
to comply wiht nov 202654861; metal stair case approx 20' in height and located in the rear commiting the ground floor for the second story deck. | $500 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 2665 Laguna St | Ping Hong Liang | deck column repair, to remove 3 (e) posts dryrot & replace w/ 8" x 8" structure #1-3 posts in kindDetails
deck column repair, to remove 3 (e) posts dryrot & replace w/ 8" x 8" structure #1-3 posts in kind | $18,000 |
| Sep 25, 2026 | In progress issued Sep 2026 | 812 Lyon St | Perez Rough Frame Specialists | revision to pa#202609107885: in addition to 202609107885, replace stringers with pressure treated lumber, replace decking with trex, replace dry-rotte railing posts. no structural changes. all work in kind and less than 50%. not visible from street.Details
revision to pa#202609107885: in addition to 202609107885, replace stringers with pressure treated lumber, replace decking with trex, replace dry-rotte railing posts. no structural changes. all work in kind and less than 50%. not visible from street. | $6,000 |