Mc Gibbon Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Dec 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 27 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 10 completed. Typically 0 days from filing to permit and 26 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2018 | Completed final sign-off Mar 2019 | 805 Marina Bl | under 50% deck repair for dryrot, front deck repair in kindDetails
under 50% deck repair for dryrot, front deck repair in kind | $4,500 |
| Jan 3, 2017 | Completed final sign-off Feb 2017 | 271 Eureka St | under 50% repair of an existing rear deck. redwood tread replacement, replace infected joists, new handrails at stairs.Details
under 50% repair of an existing rear deck. redwood tread replacement, replace infected joists, new handrails at stairs. | $5,000 |
| Jul 29, 2015 | Completed final sign-off Jun 2017 | 3978 Cesar Chavez St | proposed reconstgruction of rear stairs & horizontl extension of rear deck.Details
proposed reconstgruction of rear stairs & horizontl extension of rear deck. | $12,000 |
| May 28, 2015 | Completed final sign-off Aug 2015 | 1667 Fulton St | repair and replace deck in kindDetails
repair and replace deck in kind | $3,000 |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 442 Sanchez St | under 50% deck reapir. replace 4x4 structural post, 10ft, replace 4x6 platform beam 10ft. replace (2) 2x6 treads & 4x4 railing post.Details
under 50% deck reapir. replace 4x4 structural post, 10ft, replace 4x6 platform beam 10ft. replace (2) 2x6 treads & 4x4 railing post. | $1,200 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 1358 Utah St | under 50% deck repair, individual unit deck approx 13x10. replace 1 side of railing surface redwood. no structuralDetails
under 50% deck repair, individual unit deck approx 13x10. replace 1 side of railing surface redwood. no structural | $1,500 |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 1029 Munich St | replacement in-kind of a platform deck 8ft x 3 ft, picket railingDetails
replacement in-kind of a platform deck 8ft x 3 ft, picket railing | $2,350 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 1514 Waller St | repiar deck stringer and treads on rear stairs, less than 50% replacement. 18' of 4x6 structural post.Details
repiar deck stringer and treads on rear stairs, less than 50% replacement. 18' of 4x6 structural post. | $4,500 |
| Jul 11, 2013 | Completed final sign-off Jul 2013 | 2131 Divisadero St | less than 50% deck replacement. replace 8 4ft 2 x 10 joists. replace outer rim joint. replace trim of outer rim joistDetails
less than 50% deck replacement. replace 8 4ft 2 x 10 joists. replace outer rim joint. replace trim of outer rim joist | $2,500 |
| Nov 5, 2012 | Completed final sign-off Nov 2012 | 116 Downey St | replace a stairs form a deck to a midway platform with pressure treated lumber aisd replace a 10th section of guardrail at the bottom right hand side of stairs. guardrail is (e) + is of a 2x4 horizontal construction. less than 50% of total job.Details
replace a stairs form a deck to a midway platform with pressure treated lumber aisd replace a 10th section of guardrail at the bottom right hand side of stairs. guardrail is (e) + is of a 2x4 horizontal construction. less than 50% of total job. | $1,800 |