Mc Gibbon Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Dec 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 27 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 9 completed. Typically 0 days from filing to permit and 36 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2017 | Completed final sign-off Feb 2017 | 271 Eureka St | under 50% repair of an existing rear deck. redwood tread replacement, replace infected joists, new handrails at stairs.Details
under 50% repair of an existing rear deck. redwood tread replacement, replace infected joists, new handrails at stairs. | $5,000 |
| Jul 29, 2015 | Completed final sign-off Jun 2017 | 3978 Cesar Chavez St | proposed reconstgruction of rear stairs & horizontl extension of rear deck.Details
proposed reconstgruction of rear stairs & horizontl extension of rear deck. | $12,000 |
| Oct 23, 2014 | Completed final sign-off Nov 2014 | 3511 16th St | under 50 % stair repair. rear stairs. replace 3 bullnose treads on stairs. 3' platforms 3ft x 6ft with 1/2 treads replacedDetails
under 50 % stair repair. rear stairs. replace 3 bullnose treads on stairs. 3' platforms 3ft x 6ft with 1/2 treads replaced | $800 |
| Apr 15, 2014 | Completed final sign-off May 2014 | 124 Pierce St | replacement of stair stringers & railings horizontal to remove dryrot. replacement in kind. less than 50% repair.Details
replacement of stair stringers & railings horizontal to remove dryrot. replacement in kind. less than 50% repair. | $1,500 |
| Apr 15, 2014 | Completed final sign-off May 2014 | 1129 Church St | 4 6"x6" post replacement. amending stair railings with more pickets & handrail. replacement in kind. less than 50% repair.Details
4 6"x6" post replacement. amending stair railings with more pickets & handrail. replacement in kind. less than 50% repair. | $2,000 |
| Jan 17, 2014 | Completed final sign-off May 2014 | 130 Pierce St | demo existing non code eompliant egress stair. erect new code compliant egress stair in kind.Details
demo existing non code eompliant egress stair. erect new code compliant egress stair in kind. | $5,000 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 1514 Waller St | repiar deck stringer and treads on rear stairs, less than 50% replacement. 18' of 4x6 structural post.Details
repiar deck stringer and treads on rear stairs, less than 50% replacement. 18' of 4x6 structural post. | $4,500 |
| Jun 7, 2013 | Completed final sign-off Aug 2013 | 253 Waller St | repair of existing wood stair- dryrot, less than 50% of structure, locate to rear at side, not visable from street.Details
repair of existing wood stair- dryrot, less than 50% of structure, locate to rear at side, not visable from street. | $5,000 |
| Nov 5, 2012 | Completed final sign-off Nov 2012 | 116 Downey St | replace a stairs form a deck to a midway platform with pressure treated lumber aisd replace a 10th section of guardrail at the bottom right hand side of stairs. guardrail is (e) + is of a 2x4 horizontal construction. less than 50% of total job.Details
replace a stairs form a deck to a midway platform with pressure treated lumber aisd replace a 10th section of guardrail at the bottom right hand side of stairs. guardrail is (e) + is of a 2x4 horizontal construction. less than 50% of total job. | $1,800 |