Goffo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2020
- Last 24 months
- 0 permits filed
241 permits since 2000: 225 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 11 completed. Typically 1 days from filing to permit and 18 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2014 | Completed final sign-off Oct 2014 | 133 Saturn St | minor dry rot rear (e) deck/stair repair (less than 50%), repair in kind.Details
minor dry rot rear (e) deck/stair repair (less than 50%), repair in kind. | $4,000 |
| Oct 23, 2014 | Completed final sign-off Oct 2014 | 145 Kensington Wy | revision to 201404022266. rear deck as built conditionDetails
revision to 201404022266. rear deck as built condition | $1,000 |
| Aug 25, 2014 | Completed final sign-off Sep 2014 | 182 Stillings Av | repair of extg deck and stairs (50 % less than repair work scope) at rear of house.Details
repair of extg deck and stairs (50 % less than repair work scope) at rear of house. | $8,500 |
| Apr 2, 2014 | Completed final sign-off Oct 2014 | 145 Kensington Wy | interior framing alterations and foundation design to bottom storage base level. basem level lateral strengthening. rear deck replacement (less than 30" from grade)Details
interior framing alterations and foundation design to bottom storage base level. basem level lateral strengthening. rear deck replacement (less than 30" from grade) | $40,000 |
| Jan 5, 2012 | Completed final sign-off Jan 2012 | 231 Precita Av | minimal dry rot repair work to (e) rear deck posts, joists and deck boards, all work to be less than 50% of deck.Details
minimal dry rot repair work to (e) rear deck posts, joists and deck boards, all work to be less than 50% of deck. | $3,000 |
| Dec 2, 2011 | Completed final sign-off Jun 2012 | 228 Roosevelt Wy | enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window.Details
enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window. | $40,000 |
| Sep 16, 2009 | Completed final sign-off Dec 2009 | 74 Idora Av | install deck at rear of house & add door to deck.Details
install deck at rear of house & add door to deck. | $10,000 |
| Mar 31, 2008 | Completed final sign-off Sep 2008 | 4024 25th St | replace rear porch, deck, and stairs in like kind (less than 10' off the ground)Details
replace rear porch, deck, and stairs in like kind (less than 10' off the ground) | $10,000 |
| Jan 6, 2006 | Completed final sign-off Jan 2006 | 333 Mississippi St | repair (e) deck with (n) 4 by 12 beam & 2 piers & two 4 by 4 postin/simpson connectors, also replace rafted 2 by 8 joists as needed, all work to be within 50 percent of entire deck (work to be done on unit 333 mississippi street - upper floor)Details
repair (e) deck with (n) 4 by 12 beam & 2 piers & two 4 by 4 postin/simpson connectors, also replace rafted 2 by 8 joists as needed, all work to be within 50 percent of entire deck (work to be done on unit 333 mississippi street - upper floor) | $5,000 |
| Mar 25, 2002 | Completed final sign-off Apr 2002 | 2169 Green St | repair deck joists, deck boards & rotted stairsDetails
repair deck joists, deck boards & rotted stairs | $2,000 |
| Sep 6, 2001 | Completed final sign-off Feb 2002 | 1293 06th Av | new deck (223sf) at rear yard, 2nd story w/ (n) stairs.Details
new deck (223sf) at rear yard, 2nd story w/ (n) stairs. | $30,000 |