Block 2607, lot 261
228 Roosevelt Way
- City’s use
- Single Family Residential
- Built
- 1989
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,840 sq ft
- Lot
- 1,542 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2012 | Completed final sign-off Apr 2012 | 228 Roosevelt Wy | Goffo Construction Inc | cosmetic remodel of (e) bathroom with (n) fixtures + tile in same location. hight efficacy lighting or occupancy sensor.Details
cosmetic remodel of (e) bathroom with (n) fixtures + tile in same location. hight efficacy lighting or occupancy sensor. | $15,000 |
| Dec 2, 2011 | Completed final sign-off Jun 2012 | 228 Roosevelt Wy | Goffo Construction Inc | enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window.Details
enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window. | $40,000 |
| Feb 11, 2008 | Completed final sign-off Mar 2008 | 228 Roosevelt Wy | Merchant Construction | replace in like kind approx 1000 sq ft (east elevation). siding and trim with new 1x7 redwood siding.Details
replace in like kind approx 1000 sq ft (east elevation). siding and trim with new 1x7 redwood siding. | $10,000 |
| Dec 4, 2006 | Completed final sign-off Jan 2007 | 228 Roosevelt Wy | Safeway Roofing & Siding Co. | reroofing.Details
reroofing. | $15,700 |
| Nov 9, 2005 | Completed final sign-off Jun 2006 | 228 Roosevelt Wy | Merchant Construction | remodel kitchdn, nfew kitchden cabinets appliances remove appros three feet of mid wall non bearing installing new header. add new stud at end ofcounter top demolish powder room tile floorDetails
remodel kitchdn, nfew kitchden cabinets appliances remove appros three feet of mid wall non bearing installing new header. add new stud at end ofcounter top demolish powder room tile floor | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.