Back to kitchen remodel contractors
Goffo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2020
- Last 24 months
- 0 permits filed
241 permits since 2000: 225 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
62 kitchen remodel permits: 58 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2019 | Completed final sign-off Jun 2019 | 514 Molimo Dr | cosmetic remodel of existing kitchen with new cabinets, counter,and appliances in same location. no structural work. no change in layouts.Details
cosmetic remodel of existing kitchen with new cabinets, counter,and appliances in same location. no structural work. no change in layouts. | $18,000 |
| Oct 29, 2018 | Completed final sign-off May 2019 | 3027 Sacramento St | cosmetic remodel of e kitchen. no structural work to be doneDetails
cosmetic remodel of e kitchen. no structural work to be done | $21,365 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 1618 21st Av | cosmetic remode of (e) kitchen . no wall removal or structural workDetails
cosmetic remode of (e) kitchen . no wall removal or structural work | $18,000 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 1451 18th Av | cosmetic remodel of (e) kitchen (nonstructural work) & (e) (1) bathroom at upper unit (no structural work); everything in same location, no moving of doors or walls.Details
cosmetic remodel of (e) kitchen (nonstructural work) & (e) (1) bathroom at upper unit (no structural work); everything in same location, no moving of doors or walls. | $30,000 |
| Sep 7, 2017 | Completed final sign-off Mar 2018 | 715 Shrader St | cosmetic remodel of kitchen w/ cabinets, counters & tiles. no structural changes.Details
cosmetic remodel of kitchen w/ cabinets, counters & tiles. no structural changes. | $20,000 |
| Jun 6, 2017 | Completed final sign-off Mar 2018 | 1564 36th Av | cosmetic remodel of kitchen & bathroom with new tile & fixtures to same location. no structural wall changes.Details
cosmetic remodel of kitchen & bathroom with new tile & fixtures to same location. no structural wall changes. | $30,000 |
| Apr 26, 2017 | Completed final sign-off Jun 2017 | 1776 Sacramento St | cosmetic remodel of (e) master bath and guest bath with new tile & paint, (n) kitchen counter & sink only, no structural work, same configuration.Details
cosmetic remodel of (e) master bath and guest bath with new tile & paint, (n) kitchen counter & sink only, no structural work, same configuration. | $20,000 |
| Mar 31, 2017 | Completed final sign-off Jun 2017 | 744 Hayes St | cosmetic remodel of (e) kitchen. no wall removal or relocation maher naDetails
cosmetic remodel of (e) kitchen. no wall removal or relocation maher na | $18,000 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 1502 Sanchez St | cosmetic remodel of one (e) kitchen and one (e) bathroom w/ (n) cabinets, counters, tile floors and shower walls.Details
cosmetic remodel of one (e) kitchen and one (e) bathroom w/ (n) cabinets, counters, tile floors and shower walls. | $30,000 |
| Nov 12, 2015 | Completed final sign-off Feb 2016 | 225 Excelsior Av | cosmetic remodel of (e) kitchen w/ (n) cabinets, counters, tile & paint (same house kitchen). lighting & control per cec 150 (k).Details
cosmetic remodel of (e) kitchen w/ (n) cabinets, counters, tile & paint (same house kitchen). lighting & control per cec 150 (k). | $20,000 |
| Oct 2, 2015 | Completed final sign-off Dec 2015 | 554 Bella Vista Wy | cosmetic remodel of (e) kitchen with (n) cabinets, counters & flooring, no walls to be moved and no structural work.Details
cosmetic remodel of (e) kitchen with (n) cabinets, counters & flooring, no walls to be moved and no structural work. | $17,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2015 | 679 14th Av | cosmetic remodel of (e) kitchen w/ new cabinets, counters, tiletd floor & paint. no change on walls.Details
cosmetic remodel of (e) kitchen w/ new cabinets, counters, tiletd floor & paint. no change on walls. | $17,000 |
| Apr 8, 2015 | Completed final sign-off Jun 2015 | 665 Myra Wy | cosmetic remodel of (e) kitchen w/ (n) cabinets, counters & floor tile. no wall modification. no structural.Details
cosmetic remodel of (e) kitchen w/ (n) cabinets, counters & floor tile. no wall modification. no structural. | $20,000 |
| Jan 28, 2015 | Completed final sign-off Dec 2015 | 149 Henry St | adding in-law unit per weiner legislation, with in 1/4 mile of castro commercial zone. in-law unit to have new kitchen an bathroom.Details
adding in-law unit per weiner legislation, with in 1/4 mile of castro commercial zone. in-law unit to have new kitchen an bathroom. | $48,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 66 Fountain St | cosmetic remodel of (e) kitchen and bathroom with (n) cabinets & tile at upper unit. no change in layout. lighting to comply with cec 150(k)Details
cosmetic remodel of (e) kitchen and bathroom with (n) cabinets & tile at upper unit. no change in layout. lighting to comply with cec 150(k) | $30,000 |
| Apr 3, 2014 | Completed final sign-off Jun 2014 | 3348 Market St | cosmetic remodel of (e) kitchen (n) cabinets counters.Details
cosmetic remodel of (e) kitchen (n) cabinets counters. | $20,000 |
| Mar 13, 2014 | Completed final sign-off May 2014 | 572 47th Av | installation of a new 3'x3' skylight in kitchen area.Details
installation of a new 3'x3' skylight in kitchen area. | $1,500 |
| Jan 10, 2014 | Completed final sign-off May 2014 | 572 47th Av | cosmetic remodel of existing kitchen with new cabinets, counters & lights. lighting shall comply with t-24Details
cosmetic remodel of existing kitchen with new cabinets, counters & lights. lighting shall comply with t-24 | $18,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 725 Detroit St | cosmetic kitchen remodel with new cabinets, counters & lights. lighting shall comply with t-24Details
cosmetic kitchen remodel with new cabinets, counters & lights. lighting shall comply with t-24 | $18,000 |
| Oct 7, 2013 | Completed final sign-off Nov 2013 | 1800 Turk St | cosmetic remodel of extg kitchen in unit #402. new cabinets, counters, and tiled floor(approx 80 sq ft)Details
cosmetic remodel of extg kitchen in unit #402. new cabinets, counters, and tiled floor(approx 80 sq ft) | $20,000 |
| Aug 12, 2013 | Completed final sign-off Oct 2013 | 485 Ulloa St | cosmetic remodel of extg kitchen with new cabinets and countertops.Details
cosmetic remodel of extg kitchen with new cabinets and countertops. | $20,000 |
| Jun 17, 2013 | Completed final sign-off Aug 2013 | 731 Douglass St | cosmetic kitchen remodel with new cabinets, counters and tileDetails
cosmetic kitchen remodel with new cabinets, counters and tile | $20,000 |
| Nov 29, 2012 | Completed final sign-off Apr 2013 | 227 Chattanooga St | expand living room into front bedroom. develope new bath in remainder of front bed room. develope new kitchen/dining in extg kitchen/laundry/bath.Details
expand living room into front bedroom. develope new bath in remainder of front bed room. develope new kitchen/dining in extg kitchen/laundry/bath. | $150,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2012 | 760 03rd Av | cosmetic kitchen remodel with new cabinets, counters and tiled floor. reconnect appliances to same locations.Details
cosmetic kitchen remodel with new cabinets, counters and tiled floor. reconnect appliances to same locations. | $15,000 |
| Jun 13, 2012 | Completed final sign-off Aug 2012 | 2125 24th St | cosmetic kitchen remodel with new cabinets, counters & lights.Details
cosmetic kitchen remodel with new cabinets, counters & lights. | $15,000 |
| Mar 6, 2012 | Completed final sign-off Apr 2012 | 4250 23rd St | cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same locationDetails
cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same location | $16,000 |
| Aug 26, 2011 | Completed final sign-off Oct 2011 | 424 Clipper St | cosmetic kitchen remodel with new cabinets, countertops + paint. all appliances in same location. 50% lighting in kitchen, high efficacyDetails
cosmetic kitchen remodel with new cabinets, countertops + paint. all appliances in same location. 50% lighting in kitchen, high efficacy | $15,000 |
| Jun 17, 2011 | Completed final sign-off Jul 2011 | 121 Lincoln Wy | cosmetic kitchen remodel with new cabinets, counters, tiled floor, replace water damaged drywall 7 paint. no structural work and no wall relocation, new lighting comply with cec 150(k)Details
cosmetic kitchen remodel with new cabinets, counters, tiled floor, replace water damaged drywall 7 paint. no structural work and no wall relocation, new lighting comply with cec 150(k) | $23,000 |
| Nov 19, 2010 | Completed final sign-off Dec 2010 | 1445 11th Av | minor drywall patching after opening small kitchen area & wet bar for plumbing and electrical inspectors to see work in reference to nov 201076866 (plumbing & nov 201076867 electrical; no other workDetails
minor drywall patching after opening small kitchen area & wet bar for plumbing and electrical inspectors to see work in reference to nov 201076866 (plumbing & nov 201076867 electrical; no other work | $3,000 |
| Sep 24, 2009 | Completed final sign-off Nov 2009 | 1367 20th Av | cosmetic ritchen remodel with (n) cabinets countertops and floor appliances remain in same location not moving or adding any walls 12x12'6" kitchen areaDetails
cosmetic ritchen remodel with (n) cabinets countertops and floor appliances remain in same location not moving or adding any walls 12x12'6" kitchen area | $17,000 |
| Mar 11, 2009 | Completed final sign-off May 2009 | 42 Richland Av | opening in middle bearing wall on 2nd floor @ existing kitchen.Details
opening in middle bearing wall on 2nd floor @ existing kitchen. | $3,500 |
| Feb 25, 2009 | Completed final sign-off May 2009 | 42 Richland Av | work @ unit# 42 only. cosmetic kitchen remodel. new cabinets & counters. painting. no structural work. minimum 50% of the kitchen light watts be in fluorescent.Details
work @ unit# 42 only. cosmetic kitchen remodel. new cabinets & counters. painting. no structural work. minimum 50% of the kitchen light watts be in fluorescent. | $15,000 |
| Jan 28, 2009 | Completed final sign-off Oct 2009 | 3230 16th St | work @ units# a, b, c & f only. remodel of 4 kitchen, replace cabinet 7'-0" long (only), new cabinets & counters. total 4 kitchens remodel, the size of kitchen is 11'x10. kitchen lighting: min 50% of wattage shall be of fluorescent.Details
work @ units# a, b, c & f only. remodel of 4 kitchen, replace cabinet 7'-0" long (only), new cabinets & counters. total 4 kitchens remodel, the size of kitchen is 11'x10. kitchen lighting: min 50% of wattage shall be of fluorescent. | $70,800 |
| Feb 5, 2007 | Completed final sign-off Apr 2007 | 3250 Broderick St | cosmetic kitchen remodel with (n) cabinets, countertops, all appliances to remain at (e) locations. work in #3250 . no structural changes. any new lighting to be 50% flourescent.Details
cosmetic kitchen remodel with (n) cabinets, countertops, all appliances to remain at (e) locations. work in #3250 . no structural changes. any new lighting to be 50% flourescent. | $20,000 |
| Aug 21, 2006 | Completed final sign-off Nov 2006 | 2235 Beach St | cosmetic 1 kitchen remodel w/new cbinets, counters + floorDetails
cosmetic 1 kitchen remodel w/new cbinets, counters + floor | $15,000 |
| Aug 14, 2006 | Completed final sign-off Jan 2007 | 1325 Church St | cosmetic remodel of kitchen + bath in each of the units. 2 bath & 2 kitchen non structural work.Details
cosmetic remodel of kitchen + bath in each of the units. 2 bath & 2 kitchen non structural work. | $40,000 |
| Nov 21, 2005 | Completed final sign-off Jan 2006 | 4002 22nd St | remove/replace tub,tile,vanity,toilet (same location) in bathroom.remove/replace 12' kitchen cabinets & counters. all work on unit 4002 onlyDetails
remove/replace tub,tile,vanity,toilet (same location) in bathroom.remove/replace 12' kitchen cabinets & counters. all work on unit 4002 only | $18,000 |
| Jul 21, 2005 | Completed final sign-off Aug 2005 | 264 28th St | remove existing between kitchen & dining room on 2nd flDetails
remove existing between kitchen & dining room on 2nd fl | $1,200 |
| May 10, 2005 | Completed final sign-off Jun 2005 | 782 14th St | revision for permit 200504250796 to create opening at midspan wall between kitchen & dining rm, apprDetails
revision for permit 200504250796 to create opening at midspan wall between kitchen & dining rm, appr | $10,000 |
| Apr 25, 2005 | Completed final sign-off Jun 2005 | 782 14th St | cosmetic remodel of kitchen w/new cabinet & counters 782-14th stDetails
cosmetic remodel of kitchen w/new cabinet & counters 782-14th st | $18,000 |
| Mar 7, 2005 | Completed final sign-off Jun 2005 | 133 Henry St | cosmetic remodel of (e)kitchen & minor plaster,repair of dining roomDetails
cosmetic remodel of (e)kitchen & minor plaster,repair of dining room | $15,000 |
| Sep 1, 2004 | Completed final sign-off Dec 2004 | 675 Cambridge St | cosmetic kitchen remodel with new cabinets and countersDetails
cosmetic kitchen remodel with new cabinets and counters | $15,000 |
| May 12, 2004 | Expired or cancelled expired Feb 2006 | 500 Divisadero St | renew appl#200207121348 to remodel (e)bathroom on top fl +middle fl.cosmetic bath,replace (e)kitchenDetails
renew appl#200207121348 to remodel (e)bathroom on top fl +middle fl.cosmetic bath,replace (e)kitchen | $8,000 |
| Mar 29, 2004 | Completed final sign-off Jul 2004 | 647 Alvarado St | cosmetic kitchen,remodel & sunporch (e) w/new window & door casing on 2nd level.no structural changeDetails
cosmetic kitchen,remodel & sunporch (e) w/new window & door casing on 2nd level.no structural change | $11,000 |
| Dec 2, 2003 | Completed final sign-off Dec 2003 | 76 Vicksburg St | remove between kitchen and family room, add header/posts, add steel "c" channel in basementDetails
remove between kitchen and family room, add header/posts, add steel "c" channel in basement | $3,500 |
| Sep 11, 2003 | Completed final sign-off Nov 2003 | 2329 Castro St | cosmetic remodel of kitchen w/ new cabinets,counters,floor & paint.Details
cosmetic remodel of kitchen w/ new cabinets,counters,floor & paint. | $10,000 |
| Sep 11, 2003 | Never finaled issued Sep 2003, no final | 1205 04th Av | cosmetic kitchen remodel of unit d w/ new cabinets & counter tops & paint.Details
cosmetic kitchen remodel of unit d w/ new cabinets & counter tops & paint. | $8,500 |
| Aug 6, 2003 | Completed final sign-off Jan 2004 | 1205 04th Av | cosmetic remodel of existing kitchen / painting & flooringDetails
cosmetic remodel of existing kitchen / painting & flooring | $9,500 |
| Jun 4, 2003 | Completed final sign-off Jan 2004 | 1205 04th Av | cosmetic kitchen remodel w/ new cabinets,counters,flooring & paint.Details
cosmetic kitchen remodel w/ new cabinets,counters,flooring & paint. | $10,000 |
| May 8, 2003 | Completed final sign-off Oct 2003 | 1205 04th Av | cosmetic kitchen remodel w/cabinets, tops & linoleumDetails
cosmetic kitchen remodel w/cabinets, tops & linoleum | $8,500 |
| Apr 28, 2003 | Completed final sign-off Aug 2003 | 307 Scott St | cosmetic kitchen remodel w/cabinets, countertop & floor, no structural workDetails
cosmetic kitchen remodel w/cabinets, countertop & floor, no structural work | $10,000 |
| Mar 19, 2003 | Completed final sign-off May 2003 | 695 Castro St | cosmetic kitchen remodel w/ cabinets,counters,floor & paint. no structural work.Details
cosmetic kitchen remodel w/ cabinets,counters,floor & paint. no structural work. | $8,000 |
| Oct 31, 2002 | Never finaled issued Oct 2002, no final | 1070 Green St | cosmetic kitchen + bath remodel w/new cabinets, countertops + floorsDetails
cosmetic kitchen + bath remodel w/new cabinets, countertops + floors | $20,000 |
| Oct 30, 2002 | Completed final sign-off Jan 2003 | 734 Central Av | cosmetic kitchen remodel w/ new cabinets,counters,floor & paint. no change to floor plan.Details
cosmetic kitchen remodel w/ new cabinets,counters,floor & paint. no change to floor plan. | $10,000 |
| Aug 1, 2002 | Completed final sign-off Oct 2002 | 1633 Waller St | cosmetic remodel of 2 kitchen new cabinets, counters and floorsDetails
cosmetic remodel of 2 kitchen new cabinets, counters and floors | $16,000 |
| Jun 18, 2002 | Completed final sign-off Oct 2002 | 1164 Shotwell St | cosmetic kitchen remodel w/ replacement of dry rotted rear door & window frames & units. 2windows inDetails
cosmetic kitchen remodel w/ replacement of dry rotted rear door & window frames & units. 2windows in | $8,500 |
| May 16, 2002 | Completed final sign-off Aug 2002 | 1071 Prague St | cosmetic kitchen remodel w/new cabinets+counter (no floor) no change to wallsDetails
cosmetic kitchen remodel w/new cabinets+counter (no floor) no change to walls | $8,000 |
| Mar 11, 2002 | Completed final sign-off May 2002 | 3982 26th St | cosmetic kitchen remodel of existing kitchen & laundry room/cabinets,counters,flooring.Details
cosmetic kitchen remodel of existing kitchen & laundry room/cabinets,counters,flooring. | $16,000 |
| Mar 12, 2001 | Completed final sign-off Jul 2001 | 3868 24th St | cosmetic remodel of existing kitchen & bathroom w/ kitchen cabinets,new vanity sink.Details
cosmetic remodel of existing kitchen & bathroom w/ kitchen cabinets,new vanity sink. | $20,000 |
| Jan 16, 2001 | Expired or cancelled expired Jul 2001 | 3058 Polk St | cosmetic kitchen remodel(cabinets,counter,flooring) of exstg kitchen no structural workDetails
cosmetic kitchen remodel(cabinets,counter,flooring) of exstg kitchen no structural work | $13,000 |
| Jan 4, 2001 | Completed final sign-off Jul 2001 | 191 Wawona St | cosmetic remodel of master bathroom, cosmetic remodel of kitchen, ist floor bathroom & laundry roomDetails
cosmetic remodel of master bathroom, cosmetic remodel of kitchen, ist floor bathroom & laundry room | $42,000 |
| Apr 12, 2000 | Completed final sign-off Jun 2000 | 350 Santa Ana Av | cosmetic kitchen remodelDetails
cosmetic kitchen remodel | $10,000 |