David A. King
- Listed as
- authorized agent-others, contractor
- Firm
- Superb Builders Inc **See Notes**
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Mar 2023
127 permits since 2000 (contractor on 125 permits, authorized agent-others on 4 permits): 97 completed, 15 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 127.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 64 Mars St | Superb Builders & Custom Made Cabinetry | remodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location.Details
remodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location. | $35,000 |
| Jun 9, 2021 | Expired or cancelled cancelled Jan 2026 | 618 18th Av | Superb Builders Inc **See Notes** | relocation and remodeling of kitchen, remodeling bathroom.Details
relocation and remodeling of kitchen, remodeling bathroom. | $90,000 |
| Jun 2, 2021 | Completed final sign-off Jan 2022 | 639 17th Av | Superb Builders Inc **See Notes** | one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights.Details
one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights. | $25,000 |
| Mar 29, 2021 | Completed final sign-off Jun 2021 | 672 Alvarado St | Superb Builders Inc **See Notes** | shower repair, new plumbing fixtures, new shower pan in kindDetails
shower repair, new plumbing fixtures, new shower pan in kind | $6,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 7033 Geary Bl | Skylight Tools Inc, Superb Builders Inc **See Notes** | cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switchesDetails
cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches | $42,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 446 20th Av | Skylight Tools Inc, Superb Builders Inc **See Notes** | unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.Details
unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations. | $74,000 |
| Dec 8, 2020 | Completed final sign-off Jan 2021 | 51 Topaz Wy | Superb Builders Inc **See Notes** | shower repair (master) replace shower valve, new shower tile , shower pan, new shower door. no exterior work, no walls to be changed.Details
shower repair (master) replace shower valve, new shower tile , shower pan, new shower door. no exterior work, no walls to be changed. | $12,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 21 Whitney St | Regency Construction & Remodeling, Superb Builders Inc **See Notes** | kitchen remodel like for likeDetails
kitchen remodel like for like | $20,000 |
| Nov 10, 2020 | Completed final sign-off Dec 2020 | 66 Cleary Ct | Superb Builders Inc **See Notes** | #1403: kitchen remodel in kind, new appliances, new gfci outlets, replace subpanel to 80amps, new plumbing fixtures. same location, no walls to be changed or moved.Details
#1403: kitchen remodel in kind, new appliances, new gfci outlets, replace subpanel to 80amps, new plumbing fixtures. same location, no walls to be changed or moved. | $30,000 |
| Nov 6, 2020 | Completed final sign-off Mar 2021 | 1445 Eucalyptus Dr | Superb Builders Inc **See Notes** | one kitchen remodeling in kind upgrade elctrical as needed, new appliances, new cabinets, new plumbing fixtures, new 6" recessed led lights.Details
one kitchen remodeling in kind upgrade elctrical as needed, new appliances, new cabinets, new plumbing fixtures, new 6" recessed led lights. | $25,000 |
| Oct 28, 2020 | Expired or cancelled cancelled Jan 2026 | 368 San Carlos St | Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911.Details
remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911. | |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Oct 7, 2020 | Completed final sign-off May 2023 | 25 Hidalgo Tr | Superb Builders Inc **See Notes** | renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way.Details
renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way. | $185,000 |
| Oct 2, 2020 | Never finaled issued Nov 2020, no final | 1200 Gough St | Superb Builders Inc **See Notes** | unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac systemDetails
unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac system | $45,000 |
| Sep 8, 2020 | Never finaled issued Sep 2020, no final | 12 Roscoe St | Superb Builders Inc **See Notes** | demolition of interior plaster, sheetrock, tile in showers, kitchen cabinets, wood floors to sub ploor to expose studs for structural observatoin and apply for interior remodel in separate applicationDetails
demolition of interior plaster, sheetrock, tile in showers, kitchen cabinets, wood floors to sub ploor to expose studs for structural observatoin and apply for interior remodel in separate application | $36,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 145 Broderick St | Superb Builders Inc **See Notes** | apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan.Details
apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan. | $15,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 727 Foerster St | Superb Builders Inc **See Notes** | remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed.Details
remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed. | $38,000 |
| Aug 20, 2020 | Completed final sign-off Mar 2021 | 1445 Eucalyptus Dr | Superb Builders Inc **See Notes** | remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans.Details
remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans. | $26,000 |
| Aug 14, 2020 | Completed final sign-off Oct 2020 | 2572 Alemany Bl | Superb Builders Inc **See Notes** | one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances,Details
one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances, | $37,000 |
| Aug 11, 2020 | Completed final sign-off Nov 2020 | 265 Avila St | Superb Builders Inc **See Notes** | permeated chemical grouting for 19' along south foundation. due to construction of new adjacent mat slab foundation per previously approved pa #201505136187 for 259 avila street.Details
permeated chemical grouting for 19' along south foundation. due to construction of new adjacent mat slab foundation per previously approved pa #201505136187 for 259 avila street. | $1,500 |
| Aug 6, 2020 | Completed final sign-off Aug 2021 | 266 Curtis St | Superb Builders Inc **See Notes** | revision to permite 201208157387 to convert existing covered patio in to part of the master bedroom at 2nd flr. close exterior walls and install new patio door. install a deck at rear.Details
revision to permite 201208157387 to convert existing covered patio in to part of the master bedroom at 2nd flr. close exterior walls and install new patio door. install a deck at rear. | $15,000 |
| Aug 5, 2020 | Completed final sign-off Oct 2020 | 128 Galewood Cr | Superb Builders Inc **See Notes** | kitchen (85 sqft) remodel in kind. upgrade electrical as needed. new (6) recessed led lights. new plumbing fixtures and appliances. add new subpanel 70 amps. replace 600 square feet of hardwood floors in dining room hallway and living room.Details
kitchen (85 sqft) remodel in kind. upgrade electrical as needed. new (6) recessed led lights. new plumbing fixtures and appliances. add new subpanel 70 amps. replace 600 square feet of hardwood floors in dining room hallway and living room. | $30,000 |
| Jul 31, 2020 | Completed final sign-off Mar 2021 | 1445 Eucalyptus Dr | Superb Builders Inc **See Notes** | to comply with complaint # 202045827 : repair and replace 600 square feet of stucco in the back of the house. not visible from street.Details
to comply with complaint # 202045827 : repair and replace 600 square feet of stucco in the back of the house. not visible from street. | $5,000 |
| May 13, 2020 | Completed final sign-off May 2021 | 251 Avila St | Superb Builders Inc **See Notes** | permeated chemical grouting for 56 feet under and along north foundationDetails
permeated chemical grouting for 56 feet under and along north foundation | $5,775 |
| May 6, 2020 | Completed final sign-off Jun 2020 | 1012 Shotwell St | Superb Builders Inc **See Notes** | unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes.Details
unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes. | $40,000 |
| Mar 12, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | new foundation. repair water damage in laundry and storage room. reconfiguration of storage.Details
new foundation. repair water damage in laundry and storage room. reconfiguration of storage. | $25,000 |
| Mar 11, 2020 | Completed final sign-off May 2020 | 143 Ord St | Superb Builders Inc **See Notes** | kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as needDetails
kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as need | $32,000 |
| Mar 5, 2020 | Never finaled issued Oct 2020, no final | 12 Roscoe St | Superb Builders Inc **See Notes** | remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd flDetails
remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd fl | $150,000 |
| Feb 26, 2020 | Completed final sign-off Jul 2020 | 1100 Monterey Bl | Superb Builders Inc **See Notes** | remodel kitchen in kind. upgrade electrical and plumbing as needed. new subpanel to supply kitchen circuits.Details
remodel kitchen in kind. upgrade electrical and plumbing as needed. new subpanel to supply kitchen circuits. | $23,000 |
| Feb 20, 2020 | Completed final sign-off Feb 2022 | 346 01st St | Skylight Tools Inc, Superb Builders Inc **See Notes** | unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.Details
unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft. | $46,000 |
| Feb 19, 2020 | Completed final sign-off Jul 2020 | 79 Central Av | Superb Builders Inc **See Notes** | revision "2" to existing pa#201909272962, revise the windows and doors at the rear wall at the second floor. remove simpson strong walls and add new shear walls.Details
revision "2" to existing pa#201909272962, revise the windows and doors at the rear wall at the second floor. remove simpson strong walls and add new shear walls. | $10,000 |
| Feb 14, 2020 | Completed final sign-off Nov 2021 | 259 Avila St | Superb Builders Inc **See Notes** | revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plansDetails
revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plans | $9,000 |
| Feb 13, 2020 | Expired or cancelled withdrawn Mar 2023 | 259 Avila St | Superb Builders Inc **See Notes** | revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher**Details
revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher** | $200,000 |
| Jan 31, 2020 | Completed final sign-off Mar 2020 | 2066 Wawona St | Superb Builders Inc **See Notes** | bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed.Details
bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed. | $12,000 |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Jan 15, 2020 | Completed final sign-off Mar 2020 | 856 Fell St | Superb Builders Inc **See Notes** | replace 3 small windows on right side of building repair the wall (siding) below windows due to wter damange to comply with no201997211.Details
replace 3 small windows on right side of building repair the wall (siding) below windows due to wter damange to comply with no201997211. | $18,000 |
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 266 Curtis St | Superb Builders Inc **See Notes** | structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans.Details
structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans. | $30,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2020 | 222 Stonecrest Dr | Superb Builders Inc **See Notes** | remodel one kitchen in kind. no wall alterations, upgrade electrical as needed, new appliances, cabinets, floors, etc.Details
remodel one kitchen in kind. no wall alterations, upgrade electrical as needed, new appliances, cabinets, floors, etc. | $27,000 |
| Dec 16, 2019 | Completed final sign-off Jan 2020 | 30 Esquina Dr | Superb Builders Inc **See Notes** | remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbingDetails
remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbing | $13,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 2066 Wawona St | Superb Builders Inc **See Notes** | kitchen remodel ing like for like, no walls to be modified, new appliance same locatoins. upgrade electrical as needed and add electrical subpanel.Details
kitchen remodel ing like for like, no walls to be modified, new appliance same locatoins. upgrade electrical as needed and add electrical subpanel. | $22,500 |
| Dec 12, 2019 | Completed final sign-off Jan 2020 | 30 Esquina Dr | Superb Builders Inc **See Notes** | kitchen remodel like for like same location no wall to be changed 10x10Details
kitchen remodel like for like same location no wall to be changed 10x10 | $22,500 |
| Dec 12, 2019 | Completed final sign-off Jan 2020 | 35 Ervine St | Superb Builders Inc **See Notes** | to comply with complaint 201814562 upgrade electrical main panel from 100 to 200 amp install garden lights and drywall or sheetrock repairsDetails
to comply with complaint 201814562 upgrade electrical main panel from 100 to 200 amp install garden lights and drywall or sheetrock repairs | $6,000 |
| Nov 20, 2019 | Completed final sign-off Jul 2020 | 79 Central Av | Superb Builders Inc **See Notes** | rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall.Details
rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall. | |
| Nov 1, 2019 | Completed final sign-off Jan 2020 | 2 Malta Dr | Superb Builders Inc **See Notes** | to address enforcement #2019005081. change/paint stain siding on new vertical siding street facing (approx 500 sf)Details
to address enforcement #2019005081. change/paint stain siding on new vertical siding street facing (approx 500 sf) | $2,500 |
| Oct 23, 2019 | Expired or cancelled cancelled Dec 2020 | 486 Duncan St | Superb Builders Inc **See Notes** | new 185 sq. ft. roof deck over existing flat roof.Details
new 185 sq. ft. roof deck over existing flat roof. | $8,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2020 | 79 Central Av | Superb Builders Inc **See Notes** | rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.Details
rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors. | $69,000 |
| Sep 4, 2019 | Completed final sign-off Oct 2019 | 258 Red Rock Wy | Superb Builders Inc **See Notes** | remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work.Details
remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work. | $32,000 |
| Aug 29, 2019 | Never finaled issued Sep 2019, no final | 486 Duncan St | Superb Builders Inc **See Notes** | remodel interior of (e) residence. convert 488sq ft of garage to habitable space. 174sq ft addition underneath (e) sunroom on ground floor. add 203 aq ft of dormors to (e) roof (20% of roof area) convert 19sq ft of attic to habitable area. new plumbing and in residence.Details
remodel interior of (e) residence. convert 488sq ft of garage to habitable space. 174sq ft addition underneath (e) sunroom on ground floor. add 203 aq ft of dormors to (e) roof (20% of roof area) convert 19sq ft of attic to habitable area. new plumbing and in residence. | $150,000 |
| Aug 28, 2019 | Completed final sign-off Sep 2019 | 424 Judson Av | Superb Builders Inc **See Notes** | kitchen remodel, like for like. no walls to be altered, same locations, no exterior walls to be changed, (n) appliances and cabinets, (n) 70 amp subpanel to feed kitchenDetails
kitchen remodel, like for like. no walls to be altered, same locations, no exterior walls to be changed, (n) appliances and cabinets, (n) 70 amp subpanel to feed kitchen | $23,000 |
| Aug 1, 2019 | Completed final sign-off Dec 2020 | 486 Duncan St | Superb Builders Inc **See Notes** | to comply w/ n.o.v 201962631. demo only permit. demo all interior plaster or sheetrock, tile, cabinets, floors through all 3 floors and garage.construction of new interior will be under separate permit.Details
to comply w/ n.o.v 201962631. demo only permit. demo all interior plaster or sheetrock, tile, cabinets, floors through all 3 floors and garage.construction of new interior will be under separate permit. | $7,500 |
| Jul 31, 2019 | Completed final sign-off Jun 2020 | 79 Central Av | Superb Builders Inc **See Notes** | demo and clean away sheet rock and plaster from interior walls on the middle levelDetails
demo and clean away sheet rock and plaster from interior walls on the middle level | $5,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 79 Central Av | Superb Builders Inc **See Notes** | kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3Details
kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3 | $37,000 |
| Jun 17, 2019 | Completed final sign-off Dec 2020 | 486 Duncan St | Superb Builders Inc **See Notes** | 2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures.Details
2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures. | $32,000 |
| Jun 6, 2019 | Completed final sign-off Oct 2019 | 46 Malta Dr | Superb Builders Inc **See Notes** | remodel kitchen like for like: no exterior or wall to be changed. replace cabinets, appliances, plumbing fixtures, led recessed lights, and gfci outlets. no walls removed.Details
remodel kitchen like for like: no exterior or wall to be changed. replace cabinets, appliances, plumbing fixtures, led recessed lights, and gfci outlets. no walls removed. | $25,000 |
| Jun 3, 2019 | Completed final sign-off Jul 2019 | 300 Saint Charles Av | Superb Builders Inc **See Notes** | kitchen remodeling like for like no changes on locations or structural changesDetails
kitchen remodeling like for like no changes on locations or structural changes | $25,000 |
| May 13, 2019 | Completed final sign-off Jul 2019 | 1870 Jackson St | Superb Builders Inc **See Notes** | master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories.Details
master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories. | $18,000 |
| Apr 30, 2019 | Completed final sign-off Aug 2021 | 266 Curtis St | J W Construction *See Notes*, Superb Builders Inc **See Notes** | commencement of work not started under perviously approved permit. applicationpa#201505045326.Details
commencement of work not started under perviously approved permit. applicationpa#201505045326. | $1,000 |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 291 28th Av | Superb Builders Inc **See Notes** | bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets.Details
bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets. | $13,000 |
| Apr 3, 2019 | Completed final sign-off Jul 2019 | 291 28th Av | Superb Builders Inc **See Notes** | kitchen remodeling like for like. no wall to be alterated or removed, new appliances, cabinets, counter top. new gfci outlets 6" led recessed lighting.Details
kitchen remodeling like for like. no wall to be alterated or removed, new appliances, cabinets, counter top. new gfci outlets 6" led recessed lighting. | $23,000 |
| Mar 28, 2019 | Completed final sign-off May 2019 | 1653 Greenwich St | Superb Builders Inc **See Notes** | kitchen remodeling no walls to be changed or framing modifications. new cabinets, appliances, floor tile, sink new led lights, new gfci outlets, remodel. compy w/ 150.01 (k) 3Details
kitchen remodeling no walls to be changed or framing modifications. new cabinets, appliances, floor tile, sink new led lights, new gfci outlets, remodel. compy w/ 150.01 (k) 3 | $7,000 |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 2107 34th Av | Nation Remodeling Corp | remodel bathroom: no walls modifications, siwtch from tub to standing shower. add new exhaust fan, recessed led lights, upgrade gfci outlets. all in the same locations.Details
remodel bathroom: no walls modifications, siwtch from tub to standing shower. add new exhaust fan, recessed led lights, upgrade gfci outlets. all in the same locations. | $15,000 |
| Mar 18, 2019 | Expired or cancelled expired Jan 2023 | 275 Valdez Av | Superb Builders Inc **See Notes** | add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural workDetails
add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural work | $180,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 3075 26th St | Lee Construction, Superb Builders Inc **See Notes** | remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.Details
remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room. | $30,000 |
| Mar 5, 2019 | Completed final sign-off Apr 2019 | 2 Malta Dr | Superb Builders Inc **See Notes** | replace 3 sides of exterior siding in kind and add 1/2" plywood only on second floor of the house, first level stucco to remain; also replace wood shake in kind above siding.Details
replace 3 sides of exterior siding in kind and add 1/2" plywood only on second floor of the house, first level stucco to remain; also replace wood shake in kind above siding. | $29,000 |
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 2412 Harrison St | Superb Builders Inc **See Notes** | two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixturesDetails
two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixtures | $26,000 |
| Jan 15, 2019 | Completed final sign-off Jan 2019 | 574 18th Av | Superb Builders Inc **See Notes** | renew permit application 2016-0415-4930Details
renew permit application 2016-0415-4930 | |
| Jan 7, 2019 | Never finaled issued Feb 2019, no final | 166 Geary St | Superb Builders Inc **See Notes** | 8 fl. title 24 for pa 2018-0118-8954Details
8 fl. title 24 for pa 2018-0118-8954 | |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 2274 39th Av | Superb Builders Inc **See Notes** | interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyerDetails
interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyer | $150,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 727 46th Av | Superb Builders Inc **See Notes** | remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan.Details
remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan. | $45,000 |
| Nov 26, 2018 | Expired or cancelled expired Jan 2023 | 275 Valdez Av | Superb Builders Inc **See Notes** | (2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locationsDetails
(2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locations | $50,000 |
| Nov 15, 2018 | Completed final sign-off Jan 2019 | 1455 Union St | Superb Builders Inc **See Notes** | remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2.Details
remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2. | $50,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 2 Malta Dr | Superb Builders Inc **See Notes** | 3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances.Details
3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances. | $55,000 |
| Oct 25, 2018 | Completed final sign-off Jan 2019 | 3336 25th St | Superb Builders Inc **See Notes** | kitchen and bathroom remodel. maher n/aDetails
kitchen and bathroom remodel. maher n/a | $15,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 2647 23rd Av | Superb Builders Inc **See Notes** | remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck.Details
remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck. | $150,000 |
| Sep 18, 2018 | Completed final sign-off Oct 2018 | 1 Pinehurst Wy | Superb Builders Inc **See Notes** | kitchen remodel. no walls removed,everything int he same location. new cabinets, new appliances, new 6 led recessed lights.Details
kitchen remodel. no walls removed,everything int he same location. new cabinets, new appliances, new 6 led recessed lights. | $18,000 |
| Aug 27, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | Superb Builders Inc **See Notes** | unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lightsDetails
unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lights | $38,000 |
| Aug 10, 2018 | Completed final sign-off Feb 2019 | 33 Scotia Av | Superb Builders Inc **See Notes** | kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed.Details
kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed. | $30,000 |
| Jul 26, 2018 | Completed final sign-off Oct 2018 | 439 Oxford St | Superb Builders Inc **See Notes** | remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall.Details
remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall. | $10,000 |
| Jul 12, 2018 | Completed final sign-off Aug 2018 | 60 Robblee Av | Superb Builders Inc **See Notes** | bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural workDetails
bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural work | $10,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 999 Wisconsin St | Superb Builders Inc **See Notes** | kitchen and 2 bathroom remodel. no walls moved no structuralDetails
kitchen and 2 bathroom remodel. no walls moved no structural | $25,000 |
| May 30, 2018 | Completed final sign-off Jul 2019 | 266 Country Club Dr | Superb Builders Inc **See Notes** | remove wall between kitchen & living room. remodel of kitchenDetails
remove wall between kitchen & living room. remodel of kitchen | $20,000 |
| May 30, 2018 | Completed final sign-off May 2018 | 3756 Jackson St | Superb Builders Inc **See Notes** | administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closetDetails
administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closet | |
| Feb 14, 2018 | Completed final sign-off May 2018 | 8200 Oceanview Tr | Superb Builders Inc **See Notes** | demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/aDetails
demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/a | $35,000 |
| Feb 6, 2018 | Completed final sign-off May 2018 | 798 Great Hy | Superb Builders Inc **See Notes** | unit # 2, kitchen remodel no change locations new cabinets new 6 led recessed lights, new appliances new paint couter tops new backsplash tile, replace canister to 30 new led 6" recessed lights, througout the living room, kitchen& dining rmDetails
unit # 2, kitchen remodel no change locations new cabinets new 6 led recessed lights, new appliances new paint couter tops new backsplash tile, replace canister to 30 new led 6" recessed lights, througout the living room, kitchen& dining rm | $30,000 |
| Jan 18, 2018 | Completed final sign-off Feb 2019 | 166 Geary St | Superb Builders Inc **See Notes** | 8th - remodel interior. create new partition wall, install new kitchen cabinets, new electrical outlet for office equipment and install new high efficiency lightsDetails
8th - remodel interior. create new partition wall, install new kitchen cabinets, new electrical outlet for office equipment and install new high efficiency lights | $40,000 |
| Jan 4, 2018 | Completed final sign-off Jul 2019 | 266 Country Club Dr | Superb Builders Inc **See Notes** | (2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroomDetails
(2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom | $8,000 |
| Jan 4, 2018 | Completed final sign-off May 2018 | 1449 Innes Av | Superb Builders Inc **See Notes** | kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like.Details
kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like. | $15,000 |
| Nov 29, 2017 | Never finaled issued Feb 2018, no final | 3756 Jackson St | Superb Builders Inc **See Notes** | replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites.Details
replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites. | $50,000 |
| Nov 27, 2017 | Completed final sign-off Jul 2019 | 266 Country Club Dr | Superb Builders Inc **See Notes** | ser. panel upgrade to 200 amp & rewire kitchne remodel in kindDetails
ser. panel upgrade to 200 amp & rewire kitchne remodel in kind | $18,000 |
| Nov 27, 2017 | Expired or cancelled cancelled Nov 2018 | 35 Ervine St | Superb Builders Inc **See Notes** | kitchen remdel in kind, same locationDetails
kitchen remdel in kind, same location | $12,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 3055 22nd Av | Superb Builders Inc **See Notes** | remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet.Details
remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet. | $35,000 |
| Nov 2, 2017 | Completed final sign-off Mar 2018 | 1731 43rd Av | Superb Builders Inc **See Notes** | bathroom expansion on (e) ground floor bath. maher n/a.Details
bathroom expansion on (e) ground floor bath. maher n/a. | $8,000 |
| Oct 27, 2017 | Completed final sign-off Jan 2018 | 2875 21st St | Superb Builders Inc **See Notes** | unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls.Details
unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls. | $10,000 |
| Oct 10, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | Superb Builders Inc **See Notes** | revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n)Details
revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n) | |
| Aug 30, 2017 | Expired or cancelled cancelled Apr 2018 | 3756 Jackson St | Superb Builders Inc **See Notes** | 1/f: remodel bathroom. no change in walls and layouts and openings.Details
1/f: remodel bathroom. no change in walls and layouts and openings. | $12,000 |
| Aug 10, 2017 | Expired or cancelled expired Jul 2023 | 2815 Pine St | Superb Builders Inc **See Notes** | lower unit - install 12 nos 4" led recessed lights in living room; and connec woodfireplace in gs insert & instlal new 1/2 gas line.Details
lower unit - install 12 nos 4" led recessed lights in living room; and connec woodfireplace in gs insert & instlal new 1/2 gas line. | $5,500 |
| Jul 25, 2017 | Completed final sign-off Oct 2017 | 1731 43rd Av | Superb Builders Inc **See Notes** | kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changesDetails
kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changes | $32,000 |
| Jun 27, 2017 | Completed final sign-off Nov 2018 | 145 Richardson Av | Superb Builders Inc **See Notes** | kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floorDetails
kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floor | $48,000 |
| Jun 22, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | Superb Builders Inc **See Notes** | demo and replace 80sf of tile & waterproof in a balcony in front of the house.Details
demo and replace 80sf of tile & waterproof in a balcony in front of the house. | $7,800 |
| Jun 15, 2017 | Completed final sign-off Dec 2018 | 2312 Castro St | Superb Builders Inc **See Notes** | revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof.Details
revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof. |