Smith Engineering, Inc.
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Smith Engineering Inc.
- Based in
- Berkeley
- On San Francisco permits
- Aug 2009 to Mar 2020
37 permits since 2000 (engineer on 35 permits, architect on 2 permits, authorized agent-others on 1 permit): 29 completed, 3 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 166 Meadowbrook Dr | Velox Construction Inc/Velox Des & Const | remodel (e) 2-story single family residence and develope the rear half of the garage into living space, no alterations to the exterior of the building are proposedDetails
remodel (e) 2-story single family residence and develope the rear half of the garage into living space, no alterations to the exterior of the building are proposed | $130,000 |
| Feb 4, 2019 | Completed final sign-off Apr 2023 | 737 Ashbury St | L H Construction | sfbc ab-094: voluntary soft story seismic strengthening and remodel of garage/storage at ground level.Details
sfbc ab-094: voluntary soft story seismic strengthening and remodel of garage/storage at ground level. | $120,000 |
| Dec 28, 2017 | Completed final sign-off Oct 2018 | 4740 Balboa St | revision to 201606018897, 1st fl remodel, removal of load bearing wall and replace with steel beamDetails
revision to 201606018897, 1st fl remodel, removal of load bearing wall and replace with steel beam | $5,000 | |
| Sep 26, 2017 | Completed final sign-off Jan 2019 | 165 Vasquez Av | Il Nido Designs Llc | excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powderDetails
excavate ground floor to create habitable space to include new bed, 1 bath, laundry rm, family rm, fire separated garage. replace exterior stucco in kind to repair dryrot throughout. upgrade retrofit windows to dual pane. interior renovations throughout (e) residence to include addition of a powder | $225,000 |
| Sep 12, 2017 | Completed final sign-off Sep 2019 | 775 Haight St | revision to app#201512114787 (commercial) & 201512114791(residential). replace sheets s0.1,s1.1-3, & s2.1-4; structural revision tier iv structure per sfebc chapter 4 as amended by ab107, appendix a4. design base shear for 100% cbc atDetails
revision to app#201512114787 (commercial) & 201512114791(residential). replace sheets s0.1,s1.1-3, & s2.1-4; structural revision tier iv structure per sfebc chapter 4 as amended by ab107, appendix a4. design base shear for 100% cbc at | $100,000 | |
| Aug 31, 2017 | Completed final sign-off Jul 2019 | 1656 Leavenworth St | Doherty Restoration, Inc. | soft story retrofit per sfebc chapter 4d: other rational design. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: other rational design. n/a for maher | $75,000 |
| Aug 25, 2017 | Completed final sign-off Sep 2019 | 769 Haight St | Velox Construction | soft story retrofit per sfebc chapter 4d: other rational design.Details
soft story retrofit per sfebc chapter 4d: other rational design. | $100,000 |
| Aug 1, 2017 | Completed final sign-off Aug 2023 | 2154 Taylor St | Yk Mason & Sons Inc | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2020 | 2160 Taylor St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 |
| Aug 1, 2017 | Expired or cancelled cancelled Jul 2024 | 2150 Taylor St | soft story retrofit per sfebc chapter 4d, asce 41-06.Details
soft story retrofit per sfebc chapter 4d, asce 41-06. | $100,000 | |
| Jun 15, 2017 | Completed final sign-off May 2018 | 145 Laurel St | Saarman Construction,Ltd. | revision to 201411191978, 201607071796 for discovered as built conditions and minor shear wall configuration changesDetails
revision to 201411191978, 201607071796 for discovered as built conditions and minor shear wall configuration changes | |
| May 19, 2017 | Never finaled issued May 2017, no final | 390 Bartlett St | Make Ready Maintenance Inc | revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartmentDetails
revision to 201704123805 add new header and support for reocated wall and door for unit 5 apt - convert studio to a one bedroom apartment | $3,000 |
| Apr 7, 2017 | Completed final sign-off Jul 2019 | 90 Nido Av | Wong Construction Inc | ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc)Details
ab 66 13 tier 3 soft story seismic strengthening. addition of 2 steel moment frames, foundation elements at garage, new plywood at existing walls, new clipping, strapping, epoxied anchor bolts at selected areas. gr fl only iebc appendix a4 (75% cbc) | $60,000 |
| Feb 23, 2017 | Never finaled issued Aug 2017, no final | 1701 Jones St | Doherty Restoration, Inc. | voluntary seismic strengthening similar to soft story requirements of sf ord 66-13 seismic design level is 100% 8Details
voluntary seismic strengthening similar to soft story requirements of sf ord 66-13 seismic design level is 100% 8 | $85,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2020 | 7555 Geary Bl | Strong Builders Construction Inc. | to comply with nov 21672378 - mandatory seismic stregthening for soft story per sfbc ord 66-13 submittal replaces eariler application for voluntary soft stroy program under application 201208298532 design uses full cbc level base shearDetails
to comply with nov 21672378 - mandatory seismic stregthening for soft story per sfbc ord 66-13 submittal replaces eariler application for voluntary soft stroy program under application 201208298532 design uses full cbc level base shear | $120,000 |
| Aug 31, 2016 | Completed final sign-off May 2019 | 3317 Mission St | E.J. Builders | soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story.Details
soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story. | $100,000 |
| Jul 7, 2016 | Completed final sign-off May 2018 | 145 Laurel St | phase ii shear core voluntary seismic strengthening and revisions for as built conditions for 201411191978 phase 1Details
phase ii shear core voluntary seismic strengthening and revisions for as built conditions for 201411191978 phase 1 | $250,000 | |
| Apr 8, 2016 | Completed final sign-off Sep 2019 | 3110 Clay St | Doherty Restoration, Inc. | design revision to pa#201509248028 & 201601207495 to adjust column locations, modify detailing for as built conditions, new foundations where required to improve head height and improve drainage.Details
design revision to pa#201509248028 & 201601207495 to adjust column locations, modify detailing for as built conditions, new foundations where required to improve head height and improve drainage. | $60,000 |
| Jan 14, 2016 | Completed final sign-off Aug 2017 | 575 Pierce St | Saarman Construction,Ltd. | updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maherDetails
updates to s2-s4 r3 do not block door and r3.1 as builts 1/8/16. relative to conditions discovered in field. ref app#2015052772301. n/a for maher | |
| Nov 23, 2015 | Expired or cancelled expired Jun 2017 | 2481 Folsom St | Doherty Restoration, Inc. | voluntary seismic retrofit ab094 design criteria 2013 cbc 3404.5 & sfbc ch34 iebc-a4, 100% cbc. relocate first floor columns to widen parking access.Details
voluntary seismic retrofit ab094 design criteria 2013 cbc 3404.5 & sfbc ch34 iebc-a4, 100% cbc. relocate first floor columns to widen parking access. | $90,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2017 | 792 Bay St | Doherty Restoration, Inc. | voluntary seismic retrofit in accordance with 2013 cbc 3404.5 as per current sfbc. n/a for maher.Details
voluntary seismic retrofit in accordance with 2013 cbc 3404.5 as per current sfbc. n/a for maher. | $100,000 |
| Nov 2, 2015 | Completed final sign-off Mar 2017 | 4740 Balboa St | Bai Construction | soft story retrofit per sfbc chapter 34b. engineering criteria: other rational design 100% cbc.Details
soft story retrofit per sfbc chapter 34b. engineering criteria: other rational design 100% cbc. | $120,000 |
| Sep 30, 2015 | Completed final sign-off Apr 2017 | 470 Frederick St | seismic soft story retrofit per ordinance 66.13. design level, equiv. 100% cbc. other rational design.Details
seismic soft story retrofit per ordinance 66.13. design level, equiv. 100% cbc. other rational design. | $50,000 | |
| Sep 24, 2015 | Completed final sign-off Sep 2019 | 3110 Clay St | Doherty Restoration, Inc. | seismic soft story retrofit per ord 66-13. design level equiv 100% cbcDetails
seismic soft story retrofit per ord 66-13. design level equiv 100% cbc | $95,000 |
| Jun 23, 2015 | Completed final sign-off Mar 2017 | 23 Franklin St | Doherty Restoration, Inc. | mandatory seismic strengthening per sfbc ordinance 66-13 adding new plywood shear walls and new conc foundations at gr flDetails
mandatory seismic strengthening per sfbc ordinance 66-13 adding new plywood shear walls and new conc foundations at gr fl | $50,000 |
| May 20, 2015 | Completed final sign-off Aug 2018 | 420 14th St | Glenn James Perrin | soft storey retrofit program mandatory seismic strengthening per ord. 66-13Details
soft storey retrofit program mandatory seismic strengthening per ord. 66-13 | $90,000 |
| Sep 17, 2014 | Expired or cancelled expired Feb 2017 | 388 Arlington St | J Reilly Construction | replace in kind retaining wall and stairs, seismic strengthen of front of house.Details
replace in kind retaining wall and stairs, seismic strengthen of front of house. | $90,000 |
| Jun 4, 2014 | Completed final sign-off Sep 2015 | 990 Bay St | Saarman Construction,Ltd. | voluntary seismic strengthening of concrete and steel-framed. structural to correct vertical offset discontinuity and strengthen shearwalls at front with new concrete shearwalls.Details
voluntary seismic strengthening of concrete and steel-framed. structural to correct vertical offset discontinuity and strengthen shearwalls at front with new concrete shearwalls. | $90,000 |
| Oct 31, 2013 | Completed final sign-off Jul 2020 | 767 Valencia St | construction of (3) (n) residential units on a (n) 3rd fl including (1) kitchen & (1) bathroom per residence.Details
construction of (3) (n) residential units on a (n) 3rd fl including (1) kitchen & (1) bathroom per residence. | $50,000 | |
| Sep 19, 2012 | Completed final sign-off Feb 2013 | 1886 18th Av | H Y Construction Inc. | construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain.Details
construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain. | $60,000 |
| Aug 29, 2012 | Expired or cancelled withdrawn Oct 2016 | 7555 Geary Bl | voluntary seismic strengthening, provide accurate scope of work and matching scope on plans. maintain access and egress to the occupied residential building. provide safe portal, fire escape work comply with ab 0.19 sec 2.3.Details
voluntary seismic strengthening, provide accurate scope of work and matching scope on plans. maintain access and egress to the occupied residential building. provide safe portal, fire escape work comply with ab 0.19 sec 2.3. | $95,000 | |
| Aug 21, 2012 | Completed final sign-off Feb 2013 | 3055 Pacific Av | Diamond Home Restoration | voluntary seismic strengthening with moment frame interior of garage door; 1 interior braced frame cripple wall strengthening with plywood, anchor bolts below 2nd floor.Details
voluntary seismic strengthening with moment frame interior of garage door; 1 interior braced frame cripple wall strengthening with plywood, anchor bolts below 2nd floor. | $176,000 |
| Aug 14, 2012 | Expired or cancelled cancelled Jan 2026 | 242 30th Av | addition of new deck to single family residence.Details
addition of new deck to single family residence. | $10,000 | |
| May 31, 2012 | Completed final sign-off Jul 2013 | 777 Valencia St | revision to pa# 2010/12/29/7585. work include minor floor plan layout modifications. relocate stair, new brace frame for voluntary seismic upgrade. new 2nd floor office/changing room, bathroom in (e) attic space.Details
revision to pa# 2010/12/29/7585. work include minor floor plan layout modifications. relocate stair, new brace frame for voluntary seismic upgrade. new 2nd floor office/changing room, bathroom in (e) attic space. | $30,000 | |
| Feb 28, 2012 | Never finaled issued Aug 2012, no final | 50 Palo Alto Av | Nicholas Spencer Firth Gen Contr | demolish existing deck, construct new enlarged deck.Details
demolish existing deck, construct new enlarged deck. | $30,000 |
| Dec 29, 2010 | Completed final sign-off Jul 2013 | 777 Valencia St | tenant improvement for restaurant, bar establishment, jazz club includes kitchen, bathrooms, mezzanine on 1st floor.Details
tenant improvement for restaurant, bar establishment, jazz club includes kitchen, bathrooms, mezzanine on 1st floor. | $600,000 | |
| Aug 5, 2009 | Completed final sign-off Dec 2009 | 44 Levant St | R B C General Contractors Inc. | remodel kitchen, open wall, transfer shear wall to exterior wallDetails
remodel kitchen, open wall, transfer shear wall to exterior wall | $25,000 |