Neal Schwartz
- Listed as
- architect, engineer
- Firm
- Schwartz & Architecture
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to May 2026
58 permits since 2000 (architect on 57 permits, engineer on 1 permit): 37 completed, 5 in progress, 14 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2026 | In progress filed May 2026, not yet issued | 28 Day St | Citidev Inc. | revision to permit 202502240915-s1 to remove basement. remove laundry in common area.Details
revision to permit 202502240915-s1 to remove basement. remove laundry in common area. | |
| Apr 24, 2026 | In progress issued Aug 2026 | 1532 Diamond St | North Bay Construction | remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program.Details
remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program. | $500,000 |
| Jul 9, 2025 | In progress issued May 2026 | 1089 Tennessee St | North Bay Construction | demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req.Details
demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req. | $5,000 |
| Mar 6, 2025 | In progress issued Oct 2025 | 28 Day St | Citidev Inc. | alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units.Details
alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units. | $4,750,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 5455 Anza St | Sasso Construction Inc. | revision to 202401294840. demolish (e) wall at level 1 with associated structural work. remove e level 1 kitchen. repair/replace in kind (e) water damaged finishes at east side property line wall. replace in kind damaged entrance stair.Details
revision to 202401294840. demolish (e) wall at level 1 with associated structural work. remove e level 1 kitchen. repair/replace in kind (e) water damaged finishes at east side property line wall. replace in kind damaged entrance stair. | $50,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2023 | 72 Rossi Av | North Bay Construction | new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property lineDetails
new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property line | $45,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2022 | 435 Buena Vista East Av | D K G Construction Inc | reduction of work scope: 201705176840 - cosmetic remodel of ktichen and 2 bathrooms only, in-kind sash replacement of (e) windows.Details
reduction of work scope: 201705176840 - cosmetic remodel of ktichen and 2 bathrooms only, in-kind sash replacement of (e) windows. | |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1524 Masonic Av | interior remodel of kitchen, 3 (e) full bathrooms and 1 powder room. replacement of 2 windows and 2 skylights in kind, 1 new skylight and 1 new window in master batyhroom. no new conditioned fl area.Details
interior remodel of kitchen, 3 (e) full bathrooms and 1 powder room. replacement of 2 windows and 2 skylights in kind, 1 new skylight and 1 new window in master batyhroom. no new conditioned fl area. | $350,000 | |
| Jan 11, 2021 | Completed final sign-off Jan 2022 | 72 Rossi Av | North Bay Construction | revision to pa #2020-0822-2379: updated plans per puc comments & fixture counts. replace existing furnace.Details
revision to pa #2020-0822-2379: updated plans per puc comments & fixture counts. replace existing furnace. | |
| Oct 17, 2020 | Completed final sign-off Feb 2025 | 140 Edgehill Wy | D K G Construction Inc | vertical addition to existing 2-level single-family residence. converting of (e) unconditioned storage/gym area to new one car parking garage. interior remodel with associated mechanical, electrical, plumbing work.Details
vertical addition to existing 2-level single-family residence. converting of (e) unconditioned storage/gym area to new one car parking garage. interior remodel with associated mechanical, electrical, plumbing work. | $750,000 |
| Aug 22, 2020 | Completed final sign-off Apr 2024 | 148 Bocana St | three story horizontal addition to existing sfd residence at the rear of property. third story vertical addition at rear of property. interior remodel with associated mechanical, electrical, plumbing work. new garage door, widen by 11", 8'-6" overall width.Details
three story horizontal addition to existing sfd residence at the rear of property. third story vertical addition at rear of property. interior remodel with associated mechanical, electrical, plumbing work. new garage door, widen by 11", 8'-6" overall width. | $650,000 | |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | North Bay Construction | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Dec 20, 2019 | Completed final sign-off Apr 2022 | 1029 Kansas St | Tredway Made Inc | interior remodel with associated electrical & plumbing work including 2 dormers, 8'-0 @ 3rd level, 1 (n) bath and 1 remodeled bathroom at 3rd level.Details
interior remodel with associated electrical & plumbing work including 2 dormers, 8'-0 @ 3rd level, 1 (n) bath and 1 remodeled bathroom at 3rd level. | $375,000 |
| Dec 13, 2019 | Never finaled issued Jan 2020, no final | 727 De Haro St | partial door/window replacement @ rear if house, interior remodel of (e) street level bathroomDetails
partial door/window replacement @ rear if house, interior remodel of (e) street level bathroom | $250,000 | |
| Jul 8, 2019 | Expired or cancelled withdrawn Nov 2019 | 4326 24th St | remodel (e) 2-story residence w/ horizontal addition, raise roof over (e) upper floor, add 355 sq ft mezzanine @ upper floorDetails
remodel (e) 2-story residence w/ horizontal addition, raise roof over (e) upper floor, add 355 sq ft mezzanine @ upper floor | $750,000 | |
| May 1, 2019 | In progress issued Jan 2026 | 2383 California St | North Bay Construction | to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior matDetails
to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior mat | $1,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2018 | 855 Brannan St | Cookline Construction Inc | 1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13Details
1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13 | $550,000 |
| May 17, 2017 | Completed final sign-off Jul 2022 | 435 Buena Vista East Av | remodel of 1 (e) unit (435 burna vista) in an (e) 11 units tic complex. cosmetic remodel of kitchen & 2 bathrooms. in kind replacement of exterior doors & windows. single story infill addition of 125 sq. ft. over (e) 2nd story patio space @ rear of property. new roof deck above (e) 2nd story roof.Details
remodel of 1 (e) unit (435 burna vista) in an (e) 11 units tic complex. cosmetic remodel of kitchen & 2 bathrooms. in kind replacement of exterior doors & windows. single story infill addition of 125 sq. ft. over (e) 2nd story patio space @ rear of property. new roof deck above (e) 2nd story roof. | $250,000 | |
| Mar 23, 2017 | Completed final sign-off Oct 2017 | 433 Buena Vista East Av | D K G Construction Inc | revision to pa #201702280224: add three clerestory windows in living room, add new headers for two new doors, remove (e) skylight. clerestory windows are not visible from the street.Details
revision to pa #201702280224: add three clerestory windows in living room, add new headers for two new doors, remove (e) skylight. clerestory windows are not visible from the street. | $10,000 |
| Feb 17, 2017 | Never finaled issued Nov 2017, no final | 350 Connecticut St | remodel of (e) 2 unit res'd: raising of (e) structure by 1'-6" & addition of garage with 1 parking space on lower level, 2 story rear addition, interior remodel with associated mechanical, electrical & plumbing work.Details
remodel of (e) 2 unit res'd: raising of (e) structure by 1'-6" & addition of garage with 1 parking space on lower level, 2 story rear addition, interior remodel with associated mechanical, electrical & plumbing work. | $475,000 | |
| Dec 6, 2016 | Never finaled issued Dec 2016, no final | 1 Hallidie Pz | R 3 Builders Inc. | revision to pa 2015-0417-4008 remove wall, combine 2 offices into one officeDetails
revision to pa 2015-0417-4008 remove wall, combine 2 offices into one office | $18,000 |
| Mar 29, 2016 | Completed final sign-off Mar 2019 | 49 Van Buren St | A L Martin Construction | horizontal addition at rear of property (300 sq.ft.) new family room, interior remodel of existing single family residence, new siding and in-kind window replacement at front facade, excavation at rear of 12 cubic yards.new family roomDetails
horizontal addition at rear of property (300 sq.ft.) new family room, interior remodel of existing single family residence, new siding and in-kind window replacement at front facade, excavation at rear of 12 cubic yards.new family room | $450,000 |
| Mar 17, 2015 | Never finaled issued Mar 2016, no final | 4630 19th St | erect 1 story, no basement, type 5, garage building.Details
erect 1 story, no basement, type 5, garage building. | $125,000 | |
| Mar 17, 2015 | Never finaled issued Mar 2016, no final | 4630 19th St | demolish 1 story, type 5, garage.Details
demolish 1 story, type 5, garage. | $10,000 | |
| Oct 22, 2014 | Completed final sign-off Oct 2016 | 4020 26th St | Barker-O'donoghue Master Bldrs | horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade.Details
horizontal addition at the rear of (e) three story single family res'd & interior alterion to the(e) bldg. the proposed horizontal addition includes a family room, office, bath, & laundry room. window replacement, a new deck & cosmetic altrations are proposed at the front facade. | $350,000 |
| Jul 16, 2014 | Never finaled issued May 2015, no final | 566 Rhode Island St | Herling Construction | 18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors inDetails
18 sqft, one story infill horizontal addition at rear of property. expanded (e) roof deck at level 2. interior remodel of kitchen & bathroom at level 1 . new stair & interior remodel at basement level. remediation of dry rot at front facade. cosmetic upgrades + replacement of windows and doors in | $200,000 |
| Jul 1, 2014 | Completed final sign-off Jul 2017 | 5322 California St | Narrowback Construction Co. | horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair.Details
horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair. | $200,000 |
| Nov 26, 2013 | Completed final sign-off Jul 2014 | 572 07th St | Novo Construction Inc | tenant improvements office.Details
tenant improvements office. | $750,000 |
| Jan 16, 2013 | Completed final sign-off Jan 2015 | 141 Downey St | Narrowback Construction Co. | new code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel.Details
new code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel. | $135,000 |
| Sep 5, 2012 | Completed final sign-off Mar 2013 | 490 Castenada Av | Gleason & Tankard | revision to 201101188550. reuse (e) foundation wall. revision of beam deletion of postDetails
revision to 201101188550. reuse (e) foundation wall. revision of beam deletion of post | |
| Jan 21, 2011 | Completed final sign-off Apr 2013 | 277 Douglass St | permitting of allowable existing 1st floor rear addition. expansion of ground floor area under existing addition. upgrade to interior stairwell and ground floor remodel.Details
permitting of allowable existing 1st floor rear addition. expansion of ground floor area under existing addition. upgrade to interior stairwell and ground floor remodel. | $85,000 | |
| Jan 18, 2011 | Completed final sign-off Mar 2013 | 490 Castenada Av | Gleason & Tankard | 3rd floor master bedroom addition. remodel (e) kitchen, dining, living & entry areas. replace & expand (e) stairwell. rear yard excavation.Details
3rd floor master bedroom addition. remodel (e) kitchen, dining, living & entry areas. replace & expand (e) stairwell. rear yard excavation. | $225,000 |
| Jul 30, 2010 | Completed final sign-off May 2013 | 262 Rutledge St | Building Lab | revision to pa# 2009-0226-2989-structural & architectural changes to interior only. rear windows move slightly, changes included slab at area north of garage.Details
revision to pa# 2009-0226-2989-structural & architectural changes to interior only. rear windows move slightly, changes included slab at area north of garage. | |
| Sep 23, 2009 | Completed final sign-off Jun 2010 | 201 Upper Tr | New Era Construction Co. ***Check Id**** | interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage.Details
interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage. | $50,000 |
| Feb 26, 2009 | Completed final sign-off Mar 2011 | 262 Rutledge St | Building Lab | remodel (e) 2-story single family residence, including relocation (e) kitchen, new master suite & relocating (e) stairs. project includes infill construction below (e) 2nd floor overhang / extension & construction of new deck & stair at rear yard, requiring variance submitted separately on 2/26/20.Details
remodel (e) 2-story single family residence, including relocation (e) kitchen, new master suite & relocating (e) stairs. project includes infill construction below (e) 2nd floor overhang / extension & construction of new deck & stair at rear yard, requiring variance submitted separately on 2/26/20. | $125,000 |
| Nov 21, 2008 | Never finaled issued Nov 2008, no final | 31 Caselli Av | eliminate built in cooktop appliance from previous construction scope ( 200706063169, 200710296734. owners will use portable hot plate at countertop outlets. 1/f studio.Details
eliminate built in cooktop appliance from previous construction scope ( 200706063169, 200710296734. owners will use portable hot plate at countertop outlets. 1/f studio. | ||
| Oct 7, 2008 | Completed final sign-off Jun 2011 | 1546 19th St | Forsythe General Contractors | horizontal addition to an (e) single family residence which includes the expansion of both levels of the residence. a new roof deck and stairsDetails
horizontal addition to an (e) single family residence which includes the expansion of both levels of the residence. a new roof deck and stairs | $300,000 |
| Jan 14, 2008 | Completed final sign-off Nov 2008 | 210 Locust St | addition of (n) roof deck on (e) roof at rear - 7'-6" x 15'-6" per plan. no other work.Details
addition of (n) roof deck on (e) roof at rear - 7'-6" x 15'-6" per plan. no other work. | $10,000 | |
| Dec 3, 2007 | Completed final sign-off Nov 2008 | 210 Locust St | addition of new rail and windscreen on an existing porch and stair at rear of 2nd floor.Details
addition of new rail and windscreen on an existing porch and stair at rear of 2nd floor. | $10,000 | |
| Nov 9, 2007 | Completed final sign-off Nov 2007 | 201 Potrero Av | no constuction work under thie permit. permit to document building seperation only for lot subdivision.Details
no constuction work under thie permit. permit to document building seperation only for lot subdivision. | ||
| Oct 29, 2007 | Never finaled issued Oct 2007, no final | 31 Caselli Av | unit #31 - permit addendum for planing review of (n) stair configuration in remodel (2) units. revision to appl. #200706063169.Details
unit #31 - permit addendum for planing review of (n) stair configuration in remodel (2) units. revision to appl. #200706063169. | ||
| Jun 6, 2007 | Completed final sign-off Dec 2008 | 31 Caselli Av | repair roof & deck @ garage, replace front ext. stair, reconfigure doors & windows, remodel kitchen, remodel bathrooms, general int alterations, new interior stair.Details
repair roof & deck @ garage, replace front ext. stair, reconfigure doors & windows, remodel kitchen, remodel bathrooms, general int alterations, new interior stair. | $125,000 | |
| May 4, 2007 | Completed final sign-off Dec 2007 | 790 Tennessee St | accessible bathroom facilities, first level. new electrical closet, janitor closet, exiting upgrades and a new kitchen.Details
accessible bathroom facilities, first level. new electrical closet, janitor closet, exiting upgrades and a new kitchen. | $40,000 | |
| Mar 23, 2007 | Completed final sign-off Oct 2007 | 208 Utah St | tenant improvements (partition walls) to the 4th floor of an existing office bldg.Details
tenant improvements (partition walls) to the 4th floor of an existing office bldg. | $160,000 | |
| Mar 23, 2007 | Completed final sign-off Oct 2007 | 208 Utah St | tenant improvements (partition walls) to the 3rd floor of an existing office bldg. note: mechanical & electrical work udner seperate permit.Details
tenant improvements (partition walls) to the 3rd floor of an existing office bldg. note: mechanical & electrical work udner seperate permit. | $27,500 | |
| Nov 17, 2006 | Never finaled issued Dec 2006, no final | 212 Utah St | this permit files as built drawings for the general building upgrades app #9923720(s)Details
this permit files as built drawings for the general building upgrades app #9923720(s) | ||
| Nov 17, 2006 | Never finaled issued Dec 2006, no final | 212 Utah St | lot separation permit revision #200003184751 r-1;for disabled work only triggered by lot split work.Details
lot separation permit revision #200003184751 r-1;for disabled work only triggered by lot split work. | ||
| Sep 18, 2006 | Never finaled issued Apr 2007, no final | 26 Broderick St | addition to existing 4th floor of single family residence including additional habitable space and a second means of egress. alteration to existing 2nd floor deck to make smaller.Details
addition to existing 4th floor of single family residence including additional habitable space and a second means of egress. alteration to existing 2nd floor deck to make smaller. | $175,000 | |
| Aug 3, 2006 | Never finaled issued Nov 2006, no final | 26 Broderick St | Mike Breen Construction | interior remodel of an existing 4 story, single family residence. work includes remodel 1/f kitchen, bath, stair, some partitions & (n) windows.Details
interior remodel of an existing 4 story, single family residence. work includes remodel 1/f kitchen, bath, stair, some partitions & (n) windows. | $120,000 |
| May 24, 2006 | Completed final sign-off Nov 2007 | 50 Buena Vista Tr | Gillispie Construction | kchn and bathroom remodel at 1st floor/bathroom remodels at 2nd flr/associated door & window replacementDetails
kchn and bathroom remodel at 1st floor/bathroom remodels at 2nd flr/associated door & window replacement | $85,000 |
| Apr 26, 2006 | Completed final sign-off Nov 2006 | 48 Linda St | revised detail for appl#200604038120 at request of site inspector. to clarify height of 7'6".Details
revised detail for appl#200604038120 at request of site inspector. to clarify height of 7'6". | ||
| Dec 9, 2005 | Completed final sign-off Nov 2006 | 48 Linda St | interior remodel of extg residence minor structural upgrades at 2nd floor onlyDetails
interior remodel of extg residence minor structural upgrades at 2nd floor only | $65,000 | |
| Aug 23, 2005 | Completed final sign-off Sep 2005 | 730 Dolores St | Matarozzi/Pelsinger Builders Inc. | renew 20412151457, 200409174510 and 200504069306 for final inspection only,no work under this permitDetails
renew 20412151457, 200409174510 and 200504069306 for final inspection only,no work under this permit | |
| Mar 23, 2005 | Completed final sign-off Sep 2005 | 730 Dolores St | Matarozzi/Pelsinger Builders Inc. | renew app#200401274910 to complete work.interior work only.Details
renew app#200401274910 to complete work.interior work only. | $10,000 |
| Feb 4, 2005 | Never finaled issued Feb 2005, no final | 147 Saturn St | demolish bath fixrures and finished, install new fixtures and finishes. enclose (e) bathroom.Details
demolish bath fixrures and finished, install new fixtures and finishes. enclose (e) bathroom. | $6,500 | |
| Dec 15, 2004 | Never finaled issued Dec 2004, no final | 730 Dolores St | Lunt Marymor Co Inc. | additional 1st floor sprinkler work to cover entire 1st floor.Details
additional 1st floor sprinkler work to cover entire 1st floor. | $3,000 |
| Oct 29, 2004 | Completed final sign-off Mar 2005 | 27 Alpine Tr | kitchen remodel of top floor unit.Details
kitchen remodel of top floor unit. | $15,000 | |
| Oct 20, 2004 | Completed final sign-off Aug 2005 | 664 Wisconsin St | structural, as built rev. to appl#200311240920 no exterior changesDetails
structural, as built rev. to appl#200311240920 no exterior changes |