Philip Rossington
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Rossington Architecture
- Based in
- Sausalito
- On San Francisco permits
- Dec 2004 to Oct 2024
61 permits since 2000 (architect on 59 permits, authorized agent-others on 2 permits, engineer on 1 permit): 39 completed, 2 in progress, 13 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2024 | In progress issued Oct 2024 | 3749 22nd St | Amber - Tru Construction Inc. | laundry room and bath renovation. replace side door in kind. new steps and steel rails/gates at side entry. new planter, platforms, and steel rails at driveway.Details
laundry room and bath renovation. replace side door in kind. new steps and steel rails/gates at side entry. new planter, platforms, and steel rails at driveway. | $75,000 |
| Sep 13, 2024 | In progress issued Sep 2024 | 1524 Guerrero St | Herling Construction | revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count changeDetails
revision to 202302152014: interior stair layout change. bath layout change. kitchen layout change. added door at exit passageway. no exterior work, no plumbing fixture count change | |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 124 Robinhood Dr | revision to pa# 201809079452. swapping out previously approved glass guardrail at back of house to a steel and cable rail system. removing scope of landscape stair on original permit.Details
revision to pa# 201809079452. swapping out previously approved glass guardrail at back of house to a steel and cable rail system. removing scope of landscape stair on original permit. | ||
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 1524 Guerrero St | Herling Construction | interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f.Details
interior remodel of lower 2 floors, including kitchen and baths, new stair connecting 1/f and 2/f. new windows on all 3 levels, new hvac and electrical as required, 2 new skylights at 3/f. | $394,000 |
| Mar 9, 2022 | Completed final sign-off Oct 2024 | 1251 Dolores St | Amber - Tru Construction Inc. | interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area.Details
interior remodel including kitchen and baths, new stairs,removal of portions of existing decks, new windows,new hvac & electrical as required.small extension off back side of house withing buildable area. | $400,000 |
| Aug 27, 2020 | Completed final sign-off Jan 2025 | 3833 21st St | C L O Construction | kitchen remodel and expansion to side of house. powder room relocation. renovate & legalize studio unit on ground floor. new foundations throughout.Details
kitchen remodel and expansion to side of house. powder room relocation. renovate & legalize studio unit on ground floor. new foundations throughout. | $400,000 |
| Mar 27, 2019 | Never finaled issued Jan 2020, no final | 160 27th Av | addition of (n) bathroom @ 3rd floor of (e) light well. work to be done on 3rd floor only/bathroom only.Details
addition of (n) bathroom @ 3rd floor of (e) light well. work to be done on 3rd floor only/bathroom only. | $35,000 | |
| Sep 12, 2018 | Completed final sign-off Feb 2019 | 2236 18th Av | Level 8 Construction Inc | revision to pa 2015-0506-5564. structural details revision to interior stair rail change to glassDetails
revision to pa 2015-0506-5564. structural details revision to interior stair rail change to glass | |
| Sep 7, 2018 | Completed final sign-off Jul 2023 | 124 Robinhood Dr | San Francisco Design & Constr. | interior remodel including kitchen & baths, small addition @ rear under (e) room & rebuild (e) deck. (n) bay & roof @ master bedroom. replacement of all doors & windows.Details
interior remodel including kitchen & baths, small addition @ rear under (e) room & rebuild (e) deck. (n) bay & roof @ master bedroom. replacement of all doors & windows. | $400,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 48 Yukon St | C L O Construction | revision to pa #201410229566 - new bath1 configuration on 1st floor; widen window on 2nd floor norht facade; elimination of shoring on south side.Details
revision to pa #201410229566 - new bath1 configuration on 1st floor; widen window on 2nd floor norht facade; elimination of shoring on south side. | |
| Sep 18, 2017 | Completed final sign-off Aug 2020 | 109 Hoffman Av | Amber - Tru Construction Inc. | converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl.Details
converting existing laundry in basement to bathroom, renovating kitchen and w.c. on first floor and bathrooms on third floor. small addition on 3rd fl. | $85,000 |
| Jun 30, 2017 | Never finaled issued Nov 2017, no final | 160 27th Av | interior renovation of (e) penthouse. no work on first 3 floors. no exterior work. addition of (n) bathroom + closet.Details
interior renovation of (e) penthouse. no work on first 3 floors. no exterior work. addition of (n) bathroom + closet. | $60,000 | |
| Jun 2, 2017 | Completed final sign-off Nov 2017 | 1448 Valencia St | Spiteri Builders Corp. | revision to pa#201503050039, revision to concrete landing and stairs at left elevation. n/a ordinance #155-13Details
revision to pa#201503050039, revision to concrete landing and stairs at left elevation. n/a ordinance #155-13 | |
| Mar 3, 2017 | Never finaled issued Nov 2017, no final | 160 27th Av | replacement of windows and additoin of roof deck at 3rd fl roof. no expansion of roof line, no work visible from street.Details
replacement of windows and additoin of roof deck at 3rd fl roof. no expansion of roof line, no work visible from street. | $25,000 | |
| Sep 29, 2016 | Never finaled issued Dec 2016, no final | 1448 Valencia St | Control Fire Inc. | installation of overhead fire protection sprinklers.Details
installation of overhead fire protection sprinklers. | $10,000 |
| Sep 26, 2016 | Completed final sign-off Oct 2017 | 4 Jakey Ct | C L O Construction | revision to pa #201405296948s - new windows at rear elevation (per approved permit) to be vinyl, rear bay material changed to stucco.Details
revision to pa #201405296948s - new windows at rear elevation (per approved permit) to be vinyl, rear bay material changed to stucco. | |
| Jan 7, 2016 | Completed final sign-off Nov 2017 | 1448 Valencia St | Spiteri Builders Corp. | revision to pa# 201503050039. framing alteration, 2nd floor bedroom. relocate side door at corridor. compliance with maher ordinance no 155-13 not required.Details
revision to pa# 201503050039. framing alteration, 2nd floor bedroom. relocate side door at corridor. compliance with maher ordinance no 155-13 not required. | |
| Aug 3, 2015 | Completed final sign-off Nov 2017 | 1448 Valencia St | Spiteri Builders Corp. | 3rd floor vertcial addition onto (e) 2 story building under separate pa# 201503050039. ** maher: compliance with ordinance no# 155-13 not required **Details
3rd floor vertcial addition onto (e) 2 story building under separate pa# 201503050039. ** maher: compliance with ordinance no# 155-13 not required ** | $65,000 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | Amber - Tru Construction Inc., Ace Drilling & Excavation | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| May 6, 2015 | Completed final sign-off Jan 2019 | 2236 18th Av | Level 8 Construction Inc | vertical addition consisting of a master suite and sunroom over a single family house, new family room shell at ground level.Details
vertical addition consisting of a master suite and sunroom over a single family house, new family room shell at ground level. | $200,000 |
| Apr 2, 2015 | Expired or cancelled withdrawn Sep 2016 | 109 Stratford Dr | add partial 2nd level consisting of master suite. expand kitchen toward rear yard. interior remodel including baths, kitchen, & new windows.Details
add partial 2nd level consisting of master suite. expand kitchen toward rear yard. interior remodel including baths, kitchen, & new windows. | $200,000 | |
| Mar 5, 2015 | Completed final sign-off Nov 2017 | 1448 Valencia St | Spiteri Builders Corp. | comply with bid nov #201334051, dated 10/28/2013 - rebuild (e) two -unit fire damaged bldg in kind; configuration of rooms on both levels; new staircase from garage to 2/f; new window changes on side & rear elevations, remove stair to basement in front. n/a maher ordinanceDetails
comply with bid nov #201334051, dated 10/28/2013 - rebuild (e) two -unit fire damaged bldg in kind; configuration of rooms on both levels; new staircase from garage to 2/f; new window changes on side & rear elevations, remove stair to basement in front. n/a maher ordinance | $50,000 |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 1448 Valencia St | comply with nov #201334051 - exploratory demo permit to determine non-salvageable fire damaged portions of existing building. engineer of record to provide shoring details as required. non-structural permit.Details
comply with nov #201334051 - exploratory demo permit to determine non-salvageable fire damaged portions of existing building. engineer of record to provide shoring details as required. non-structural permit. | $10,000 | |
| Feb 11, 2015 | Never finaled issued Mar 2016, no final | 42 Hotaling Pl | Van Acker Const Assoc Inc | replace all (e) wood & steel windows "in kind" on 3rd floor.Details
replace all (e) wood & steel windows "in kind" on 3rd floor. | $50,000 |
| Oct 22, 2014 | Never finaled issued Sep 2016, no final | 48 Yukon St | C L O Construction | renovation, consiting of remodeled kitchen & baths, remodeled bedrooms & living areas. new windows & siding. adding a roof deck at (e) lower roof. horizontal new entry at front of house & legalization of ground floor rooms.Details
renovation, consiting of remodeled kitchen & baths, remodeled bedrooms & living areas. new windows & siding. adding a roof deck at (e) lower roof. horizontal new entry at front of house & legalization of ground floor rooms. | $200,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 126 Park St | Watts N Water | toilet installation in garage.Details
toilet installation in garage. | $1,000 |
| Oct 2, 2014 | Completed final sign-off Jan 2016 | 4316 26th St | renovation of existing bathroom on 2nd floor, no added conditioned space.Details
renovation of existing bathroom on 2nd floor, no added conditioned space. | $15,000 | |
| May 29, 2014 | Completed final sign-off Oct 2017 | 4 Jakey Ct | C L O Construction | new bay window at rear with deck above, new elevator at front including new front door & garage door.Details
new bay window at rear with deck above, new elevator at front including new front door & garage door. | $75,000 |
| Feb 5, 2014 | Expired or cancelled cancelled Jan 2026 | 48 Yukon St | enlarge windows @ front of house, (n) open rail @ upper deck.Details
enlarge windows @ front of house, (n) open rail @ upper deck. | $3,000 | |
| Jan 28, 2014 | Completed final sign-off Sep 2014 | 68 Blake St | C L O Construction | update kitchen, add 1/2 bath and expand e bath into lightwell. add 2 skylights. legalize gr fl bath and studyDetails
update kitchen, add 1/2 bath and expand e bath into lightwell. add 2 skylights. legalize gr fl bath and study | $65,000 |
| Oct 7, 2013 | Completed final sign-off May 2014 | 679 Connecticut St | Nelson Contracting | add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair.Details
add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair. | $63,500 |
| Jun 10, 2013 | Completed final sign-off Dec 2014 | 142 Lomita Av | Robison Nieri White Construction | back yard landscaping & deck & retaining walls, repalc e(e) stairs, railings & decking, (e) concrete walls to remain _ be skim-coated, new walls to match.Details
back yard landscaping & deck & retaining walls, repalc e(e) stairs, railings & decking, (e) concrete walls to remain _ be skim-coated, new walls to match. | $150,000 |
| Jun 5, 2013 | Completed final sign-off May 2014 | 100 Galewood Cr | C L O Construction | kitchen & bathroom & wet bar remodel. cut back bearing wall & removing a non bearing wallDetails
kitchen & bathroom & wet bar remodel. cut back bearing wall & removing a non bearing wall | $65,000 |
| Mar 30, 2011 | Completed final sign-off Sep 2011 | 1742 Jones St | legalization of existing decorative cartouches to front/street facade of the buildingDetails
legalization of existing decorative cartouches to front/street facade of the building | $2,500 | |
| Mar 4, 2011 | Completed final sign-off Jan 2012 | 4316 26th St | Quinlan Construction | replace e windows in kind with true divided light wood clad windows. expansion of e master bath at rear of house. replacment of e rails at back of h0useDetails
replace e windows in kind with true divided light wood clad windows. expansion of e master bath at rear of house. replacment of e rails at back of h0use | $75,000 |
| Feb 8, 2011 | Completed final sign-off Jan 2013 | 8 Addison St | addition of approx 116 sq. ft. of living space by the addition of a bay window. the (e) front deck is to be demolished & replace with smaller deck.Details
addition of approx 116 sq. ft. of living space by the addition of a bay window. the (e) front deck is to be demolished & replace with smaller deck. | $90,000 | |
| Aug 31, 2010 | Never finaled issued Dec 2010, no final | 1837 Jefferson St | Bloch Construction Inc | to comply with nov# 201052699 and 200929185. fire damage repair. remodel 3 units, kitchnes and baths and wall removal. new laundry in ea.unit, (n) skylights. replace in-kind front and rear windows. replace light courtstair 1st to 3rd fl.Details
to comply with nov# 201052699 and 200929185. fire damage repair. remodel 3 units, kitchnes and baths and wall removal. new laundry in ea.unit, (n) skylights. replace in-kind front and rear windows. replace light courtstair 1st to 3rd fl. | $600,000 |
| Apr 21, 2010 | Completed final sign-off Sep 2010 | 137 Warren Dr | Golden West Construction | add new skylight in kitchenDetails
add new skylight in kitchen | $2,500 |
| Apr 1, 2010 | Completed final sign-off Feb 2011 | 441 28th St | Basic Modular Facilities Inc | build-out of ground floor rooms; including master bedroom, master bath, office, second bathroom & storage room. includes incorporation of (e) lightwell into stairwell.Details
build-out of ground floor rooms; including master bedroom, master bath, office, second bathroom & storage room. includes incorporation of (e) lightwell into stairwell. | $175,000 |
| Jan 13, 2010 | Completed final sign-off Sep 2010 | 137 Warren Dr | Golden West Construction | conversion of storage area at ground floor into habitable space including a family room, laundry room & bathroom. new interior stairs, replacing (e) stairs, remodel (e) kitchen. cosmetic upgrade to (e) bathroomsDetails
conversion of storage area at ground floor into habitable space including a family room, laundry room & bathroom. new interior stairs, replacing (e) stairs, remodel (e) kitchen. cosmetic upgrade to (e) bathrooms | $95,000 |
| Oct 7, 2009 | Completed final sign-off Oct 2010 | 2445 Funston Av | Quinlan Construction | interior reniovation including kitchen & bathrooms-addition of habitable space within (e) footprint at the ground floor. addition of deck at rear of house. replace wood windows at side & back of house in kind.Details
interior reniovation including kitchen & bathrooms-addition of habitable space within (e) footprint at the ground floor. addition of deck at rear of house. replace wood windows at side & back of house in kind. | $185,000 |
| Jun 2, 2009 | Completed final sign-off Sep 2009 | 24 Knollview Wy | Pieretti Construction Co | rebuild (e) deck within building area, less than 10ft above grade. dry rot repair at deck connection to houseDetails
rebuild (e) deck within building area, less than 10ft above grade. dry rot repair at deck connection to house | $10,000 |
| May 28, 2009 | Expired or cancelled expired Nov 2012 | 38 Digby St | Bradford Construction | complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights.Details
complete interior renovation including kitchen and baths. replace all existing windows and doors. seismic retrofit. replace e decks. new windows and skylights. | $400,000 |
| Apr 29, 2009 | Completed final sign-off Sep 2009 | 24 Knollview Wy | Pieretti Construction Co | rebuild bathroom at ground floor; replace all fixtures; move non-load bearing wall; rebuild shower pan; legalize room downstairsDetails
rebuild bathroom at ground floor; replace all fixtures; move non-load bearing wall; rebuild shower pan; legalize room downstairs | $7,500 |
| Jan 14, 2009 | Completed final sign-off Jun 2009 | 1538 25th Av | at ground floor fill in below 3ft cantilevered upper level, interior remodel at ground level, new bathroom, new bedroom, family room,& laundry room, one new skylight at existing stair.Details
at ground floor fill in below 3ft cantilevered upper level, interior remodel at ground level, new bathroom, new bedroom, family room,& laundry room, one new skylight at existing stair. | $90,000 | |
| Oct 2, 2008 | Completed final sign-off Sep 2009 | 1742 Jones St | addition of a roof deck above existing garage, accessed by a new door at the basement level, enclosure of an existing stair at the rear of the bldg, the enclosure includes a new door & skylight.Details
addition of a roof deck above existing garage, accessed by a new door at the basement level, enclosure of an existing stair at the rear of the bldg, the enclosure includes a new door & skylight. | $15,000 | |
| Jul 18, 2008 | Completed final sign-off May 2009 | 2758 Harrison St | new deck off the upper floor of house at rear, w/ stair to rear yard, replace all aluminum windows at upper floor w/ wood sash, double hung units.Details
new deck off the upper floor of house at rear, w/ stair to rear yard, replace all aluminum windows at upper floor w/ wood sash, double hung units. | $15,000 | |
| May 8, 2008 | Completed final sign-off Jan 2012 | 237 Wawona St | rear addition 8'-1" in depth. new bedroom and master bath, new windows & skylights, widen garage door to 10'-0". remodel kitchen & bath.Details
rear addition 8'-1" in depth. new bedroom and master bath, new windows & skylights, widen garage door to 10'-0". remodel kitchen & bath. | $100,000 | |
| Apr 11, 2008 | Completed final sign-off Oct 2008 | 467 Frederick St | all work @ unit# 467 only. (e) roof. interior remodel of existing bathrooms and laundry area. enclosure of existing light shaft for closet and electrical/plumbing chase at both levels. new and replaced windows at 3rd floor, 2 new flat skylights at roof (on curb).Details
all work @ unit# 467 only. (e) roof. interior remodel of existing bathrooms and laundry area. enclosure of existing light shaft for closet and electrical/plumbing chase at both levels. new and replaced windows at 3rd floor, 2 new flat skylights at roof (on curb). | $60,000 | |
| Mar 27, 2008 | Completed final sign-off Jul 2008 | 751 Clayton St | Toni's Construction Inc | interior remodel of kitchen and dining room. remove two walls. all work on the 3rd floor(arch.& structural alteration). (n) wall in living room to create two rooms for bedroom and office.Details
interior remodel of kitchen and dining room. remove two walls. all work on the 3rd floor(arch.& structural alteration). (n) wall in living room to create two rooms for bedroom and office. | $50,000 |
| Mar 18, 2008 | Completed final sign-off Dec 2008 | 1742 Jones St | expansion @ basement level interior only. no change to exterior. expand (e) bathroom include shower to be full bathroom. expand (e) hall. reconfigure (e) stairs next to bathroom.Details
expansion @ basement level interior only. no change to exterior. expand (e) bathroom include shower to be full bathroom. expand (e) hall. reconfigure (e) stairs next to bathroom. | $5,000 | |
| Nov 30, 2007 | Completed final sign-off May 2008 | 60 Pearl St | Basic Modular Facilities Inc | revision to p/a #2005.08.17.0549. altering back bay & doors w/ related strl. details. including original "storage" into habitable space (media nook) with related strl. detail. stair alteration. all revision to ground floor only.Details
revision to p/a #2005.08.17.0549. altering back bay & doors w/ related strl. details. including original "storage" into habitable space (media nook) with related strl. detail. stair alteration. all revision to ground floor only. | $1,000 |
| Oct 4, 2007 | Never finaled issued Aug 2010, no final | 2006 Pierce St | restore original configuration as two units. interior remodel per plansDetails
restore original configuration as two units. interior remodel per plans | $250,000 | |
| Feb 22, 2007 | Completed final sign-off Jul 2007 | 207 Corbett Av | build one level decking and stairs serving unit 211 only. revision to pa#200412141349 to reduce scope of work.Details
build one level decking and stairs serving unit 211 only. revision to pa#200412141349 to reduce scope of work. | ||
| Feb 13, 2007 | Expired or cancelled cancelled Dec 2009 | 525 Jersey St | remodel, including kchn and baths. addition of 2 baths. addition of 2 new dormers. replace wndw and skylights and upper roofDetails
remodel, including kchn and baths. addition of 2 baths. addition of 2 new dormers. replace wndw and skylights and upper roof | $90,000 | |
| Aug 21, 2006 | Expired or cancelled cancelled Jan 2008 | 137 Warren Dr | conversion of storage area at g/f into habitable space, including family room, bathroom & laundry room. rebuild interior stair to g/f, remodel (e) kitchen & (e) baths, new windows & skylight, new deck & stair at rear yard.Details
conversion of storage area at g/f into habitable space, including family room, bathroom & laundry room. rebuild interior stair to g/f, remodel (e) kitchen & (e) baths, new windows & skylight, new deck & stair at rear yard. | $75,000 | |
| Apr 28, 2006 | Expired or cancelled cancelled Mar 2009 | 221 Danvers St | add new stair to new 2nd fl, consisting of 3 bedrooms & 2 baths. remodeled kitchen & bath on 1st flr. new windows, siding, etc. remove (e) shead @ back of lot.Details
add new stair to new 2nd fl, consisting of 3 bedrooms & 2 baths. remodeled kitchen & bath on 1st flr. new windows, siding, etc. remove (e) shead @ back of lot. | $250,000 | |
| Jan 5, 2006 | Completed final sign-off Feb 2007 | 160 Montcalm St | vonverting 1st floor into master suite w/bath and closets. new interior stair to master suite from 2nd flr, new windows/doors ( wood) as shown, remove enclosed porch within req rear yard. n window at 2nd fr front bedroom (incl n skylight) enclose entry recessDetails
vonverting 1st floor into master suite w/bath and closets. new interior stair to master suite from 2nd flr, new windows/doors ( wood) as shown, remove enclosed porch within req rear yard. n window at 2nd fr front bedroom (incl n skylight) enclose entry recess | $75,000 | |
| May 23, 2005 | Never finaled issued May 2005, no final | 109 Hoffman Av | new deck off and 2nd floor with spiral stair to grade new french doors and siding revise includesDetails
new deck off and 2nd floor with spiral stair to grade new french doors and siding revise includes | ||
| May 18, 2005 | Completed final sign-off Dec 2005 | 1961 California St | bathroom remodel, including skylight, replacing door, window in master bedroom at rear of building.Details
bathroom remodel, including skylight, replacing door, window in master bedroom at rear of building. | $10,000 | |
| Dec 14, 2004 | Expired or cancelled cancelled Jul 2007 | 207 Corbett Av | new decks at each level w/stair to grade: at rear yard. scope of work required to decks and windows & doors at rear.Details
new decks at each level w/stair to grade: at rear yard. scope of work required to decks and windows & doors at rear. | $60,000 |