Block 5720, lot 040
126 Park St
- City’s use
- Single Family Residential
- Built
- 1940
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,887 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2024 | Completed final sign-off May 2025 | 126 Park St | Gadi Construction Inc | convert wood fire place into gas line fire place. 1 outlet, (1 gasline).Details
convert wood fire place into gas line fire place. 1 outlet, (1 gasline). | $8,000 |
| Nov 22, 2023 | In progress filed Nov 2023, not yet issued | 126 Park St | convert (e) wood-burning fireplace in living room (on main flr, upstairs) to gas fireplace. work includes: removing the back wall in (e) fireplace firebox to fit the new fireplace gas insert unit (regency g29), running a new gas line from the gas pipe from the water heater to the fireplace,..Details
convert (e) wood-burning fireplace in living room (on main flr, upstairs) to gas fireplace. work includes: removing the back wall in (e) fireplace firebox to fit the new fireplace gas insert unit (regency g29), running a new gas line from the gas pipe from the water heater to the fireplace,.. | $3,550 | |
| Jun 1, 2023 | Completed final sign-off Dec 2023 | 126 Park St | Central Roofing Co. | reroofing.Details
reroofing. | $12,080 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 126 Park St | Dcs Plumbing Llc | remove wall between kitchen and living room, add structural beam, install new hardwood floors, install new lighting in kitchen and living room, and paint interior.Details
remove wall between kitchen and living room, add structural beam, install new hardwood floors, install new lighting in kitchen and living room, and paint interior. | $30,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2017 | 126 Park St | K & J Construction Co. | to obtain final inspection for work approved under pa#2016-04-25-5594 & 2015-12-01-3819. all work is completeDetails
to obtain final inspection for work approved under pa#2016-04-25-5594 & 2015-12-01-3819. all work is complete | |
| Jan 20, 2017 | Completed final sign-off Dec 2017 | 126 Park St | K & J Construction Co. | remodel kitchen, no structural work.Details
remodel kitchen, no structural work. | $8,000 |
| Jul 19, 2016 | Expired or cancelled withdrawn Jun 2017 | 126 Park St | make revision to permit 201604255594; revise size and layout of bathroom, add a bar and sink to family room.Details
make revision to permit 201604255594; revise size and layout of bathroom, add a bar and sink to family room. | $1,500 | |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 126 Park St | R I Best Construction | rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/fDetails
rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/f | $21,500 |
| Dec 1, 2015 | Completed final sign-off Jun 2017 | 126 Park St | add bedroom, family room & full bathroom on ground floor.Details
add bedroom, family room & full bathroom on ground floor. | $50,000 | |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 126 Park St | Watts N Water | toilet installation in garage.Details
toilet installation in garage. | $1,000 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 126 Park St | Rooney Construction | installation of stairway & deck (metal at rear.Details
installation of stairway & deck (metal at rear. | $7,500 |
| May 8, 2009 | Completed final sign-off Dec 2009 | 126 Park St | Rooney Construction | replace rear siding, replace rear windows, enlarge one window & relocate rear door at 1st fl; one rear window replace with sliding door at 2nd fl.Details
replace rear siding, replace rear windows, enlarge one window & relocate rear door at 1st fl; one rear window replace with sliding door at 2nd fl. | $17,000 |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 126 Park St | street space & sidewalkDetails
street space & sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K & J Construction Co. (2), Rooney Construction (2), Central Roofing Co., Dcs Plumbing Llc, Gadi Construction Inc, R I Best Construction, Watts N Water
- Architects
- Philip Rossington
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.