R I Best Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2015 to Aug 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 97 Canyon Dr | replace 6 existing windows in front of the house and put new stucco on same wall; aluminum bronze, same operation, same style. 250 sqf apprx, aluminum bronzeDetails
replace 6 existing windows in front of the house and put new stucco on same wall; aluminum bronze, same operation, same style. 250 sqf apprx, aluminum bronze | $8,400 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 233 Grant Av | remodeling to remove and install new sink. install in 5 rooms cable light per plan and on hallway. replace extg light into led per plan.Details
remodeling to remove and install new sink. install in 5 rooms cable light per plan and on hallway. replace extg light into led per plan. | $23,900 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 627 Mangels Av | revision to 201705257675 legalization (e) appr office in to room , replace only decking and railing on 2 (e) decks, in lower level in bathroom make custom shower base. build egress stairs fro front deck to lower unit bedroomDetails
revision to 201705257675 legalization (e) appr office in to room , replace only decking and railing on 2 (e) decks, in lower level in bathroom make custom shower base. build egress stairs fro front deck to lower unit bedroom | |
| May 25, 2017 | Completed final sign-off Apr 2018 | 627 Mangels Av | prepare ground level for legalization - 3 bedrooms, bathroom and utility room. repair (e) stairs and make wider between main floor and lower level. remodel kitchen and bathroom on main floor.Details
prepare ground level for legalization - 3 bedrooms, bathroom and utility room. repair (e) stairs and make wider between main floor and lower level. remodel kitchen and bathroom on main floor. | $59,000 |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 126 Park St | rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/fDetails
rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/f | $21,500 |
| Mar 19, 2015 | Completed final sign-off Sep 2017 | 842 33rd Av | to comply with nov #201470021 - legalize in-law unit st ground floor at rear of garage area per ordinance 43-14. fire sprinkler under separate permit.Details
to comply with nov #201470021 - legalize in-law unit st ground floor at rear of garage area per ordinance 43-14. fire sprinkler under separate permit. | $19,025 |