R I Best Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2015 to Aug 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 12 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 627 Mangels Av | revision to 201705257675 legalization (e) appr office in to room , replace only decking and railing on 2 (e) decks, in lower level in bathroom make custom shower base. build egress stairs fro front deck to lower unit bedroomDetails
revision to 201705257675 legalization (e) appr office in to room , replace only decking and railing on 2 (e) decks, in lower level in bathroom make custom shower base. build egress stairs fro front deck to lower unit bedroom | |
| May 25, 2017 | Completed final sign-off Apr 2018 | 627 Mangels Av | prepare ground level for legalization - 3 bedrooms, bathroom and utility room. repair (e) stairs and make wider between main floor and lower level. remodel kitchen and bathroom on main floor.Details
prepare ground level for legalization - 3 bedrooms, bathroom and utility room. repair (e) stairs and make wider between main floor and lower level. remodel kitchen and bathroom on main floor. | $59,000 |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 126 Park St | rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/fDetails
rev. to pa#201512013819. add one fitness room with bathroom on ground floor, replace (e) electrical panel, install one tub light over (e) stairs, remodel (e) bathroom on 2/f | $21,500 |