Msa
- Listed as
- architect, authorized agent-others, engineer
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Aug 2011
37 permits since 2000 (architect on 35 permits, engineer on 2 permits, authorized agent-others on 1 permit): 23 completed, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2011 | Completed final sign-off Sep 2012 | 333 Baker St | project consists of verizon wireless outdoor equipment cabinets mounted on raised platform on concrete slab at basement level within chain link fance enclosure. install 6 panel antennas on penthouse behind screens. install stand-by generator mounted on concrete slab @ grade within. cmu enclosure.Details
project consists of verizon wireless outdoor equipment cabinets mounted on raised platform on concrete slab at basement level within chain link fance enclosure. install 6 panel antennas on penthouse behind screens. install stand-by generator mounted on concrete slab @ grade within. cmu enclosure. | $180,000 | |
| Feb 22, 2011 | Completed final sign-off Sep 2013 | 1950 Kearny St | Metropolitan Electrical Construction | verizon wireless equipment cabinets mounted on an (e) concrete floor at ground level & the installation of 4 panel antennas on the penthouse roof with a new rfp antenna concealment structure paint a dark grey colorDetails
verizon wireless equipment cabinets mounted on an (e) concrete floor at ground level & the installation of 4 panel antennas on the penthouse roof with a new rfp antenna concealment structure paint a dark grey color | $130,000 |
| Jan 31, 2011 | Completed final sign-off Aug 2011 | 1740 Sloat Bl | Sac Wireless Of Ca Lp | instalation of an unmanned wireless telecommunication facility consising of (7) panel antennas for at & t within an (e) church steeple and (5) equipment cabinets located on ground.Details
instalation of an unmanned wireless telecommunication facility consising of (7) panel antennas for at & t within an (e) church steeple and (5) equipment cabinets located on ground. | $130,000 |
| Sep 9, 2008 | Completed final sign-off Jan 2009 | 865 Market St | Buchanan General Contracting Co | installing equipment cabinets to distributed antenna systemDetails
installing equipment cabinets to distributed antenna system | $70,000 |
| Aug 20, 2008 | Completed final sign-off Jul 2009 | 720 La Playa | L.D. Strobel Co Ltd | rvision to pa #200704259599, per correction notice from inspector, changes on structural plans.Details
rvision to pa #200704259599, per correction notice from inspector, changes on structural plans. | $2,500 |
| May 2, 2008 | Completed final sign-off Sep 2008 | 4150 17th St | unit 18 - comply w/complaint #200710450: legalize bldg upgrade (interior finishes) within a (e) storage area. refer to pa# 8702683/66 dated 12-13-91. construction date 8/05 (e) new installation without permit; 1 vanity, 1 shower, 1 toilet, 4 light fixtures, 1 bath light/fan, 7 receptacles.Details
unit 18 - comply w/complaint #200710450: legalize bldg upgrade (interior finishes) within a (e) storage area. refer to pa# 8702683/66 dated 12-13-91. construction date 8/05 (e) new installation without permit; 1 vanity, 1 shower, 1 toilet, 4 light fixtures, 1 bath light/fan, 7 receptacles. | $10,600 | |
| Jan 31, 2008 | Completed final sign-off Oct 2008 | 1515 19th Av | Roebbelen Contracting Inc | installation of equipment cabinets on (n) steel platform at roof. installation of panel antennas on (e) building with coax cables from new equipment to panel antennas. telephone and electrical services from existing sources.Details
installation of equipment cabinets on (n) steel platform at roof. installation of panel antennas on (e) building with coax cables from new equipment to panel antennas. telephone and electrical services from existing sources. | $225,000 |
| Jan 18, 2008 | Completed final sign-off May 2009 | 680 Sanchez St | partial removal of existing non-bearing wall, replacing (e) single pane windows w/ thermal windows, partition wall at rear to be reconfigured to allow construction of laundry closet and closet, repair & rebuild. (e) kitchen porch section w/ (n) foundation and framing as required.Details
partial removal of existing non-bearing wall, replacing (e) single pane windows w/ thermal windows, partition wall at rear to be reconfigured to allow construction of laundry closet and closet, repair & rebuild. (e) kitchen porch section w/ (n) foundation and framing as required. | $8,000 | |
| Apr 25, 2007 | Completed final sign-off Jul 2009 | 720 La Playa | L.D. Strobel Co Ltd | install unmanned wireless telecommunication facility on roof top.Details
install unmanned wireless telecommunication facility on roof top. | $45,000 |
| Apr 16, 2007 | Expired or cancelled withdrawn Apr 2007 | 2601 Mission St | modification to pa# 2006/08/30/0943. relocate rpopsed equipment cabinet location from the basement to the 8th floor.Details
modification to pa# 2006/08/30/0943. relocate rpopsed equipment cabinet location from the basement to the 8th floor. | ||
| Dec 11, 2006 | Expired or cancelled cancelled May 2008 | 781 Beach St | installation of 2 mcro panel antennas mounted on existin uilding wall painted to match with the associated equipment cabinet sorrounded on convete wall at roof level.Details
installation of 2 mcro panel antennas mounted on existin uilding wall painted to match with the associated equipment cabinet sorrounded on convete wall at roof level. | $65,000 | |
| Nov 21, 2006 | Expired or cancelled expired May 2010 | 555 De Haro St | Net-Com Services Inc | revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs.Details
revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs. | $2,500 |
| Nov 13, 2006 | Completed final sign-off Nov 2007 | 1111 Junipero Serra Bl | Net-Com Services Inc | install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound.Details
install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound. | $80,000 |
| Nov 6, 2006 | Completed final sign-off Feb 2007 | 706 28th Av | Transceive Communications Inc. | revision to approved pa# 2006/05/12/1502. change 3/4" galv through bolt to 3/4" galv lag bolt.Details
revision to approved pa# 2006/05/12/1502. change 3/4" galv through bolt to 3/4" galv lag bolt. | |
| Aug 30, 2006 | Expired or cancelled expired Apr 2012 | 2601 Mission St | Alta Communication Construction | four antennas @ roof. equipment cabinets at 8th floor.Details
four antennas @ roof. equipment cabinets at 8th floor. | $70,000 |
| Aug 30, 2006 | Expired or cancelled withdrawn Feb 2007 | 650 Gilman Av | 3 antennas mounted on 2 new light standard. four outdoor equipment cabinets adjacent to antenna locations.Details
3 antennas mounted on 2 new light standard. four outdoor equipment cabinets adjacent to antenna locations. | $70,000 | |
| Aug 30, 2006 | Expired or cancelled cancelled Jan 2008 | 627 Cortland Av | installation of two micro antennas inside one frp concealment chimney on facade with the associated equipment cabinet located on new deck extension within rear proch. no batteries.Details
installation of two micro antennas inside one frp concealment chimney on facade with the associated equipment cabinet located on new deck extension within rear proch. no batteries. | $60,000 | |
| Jul 21, 2006 | Completed final sign-off Apr 2010 | 1453 Mission St | Jfc Construction Inc. | flush mounted 3 antennas on face of building. equipment cabinets on roof ( 4 cabinets). antennas will be stealth mounted. @ batteries-mech.Details
flush mounted 3 antennas on face of building. equipment cabinets on roof ( 4 cabinets). antennas will be stealth mounted. @ batteries-mech. | $70,000 |
| May 26, 2006 | Expired or cancelled cancelled Sep 2007 | 2395 29th Av | insallation of 2 microcell antennas with the associated equipment cabinet at grade level.Details
insallation of 2 microcell antennas with the associated equipment cabinet at grade level. | $45,000 | |
| May 12, 2006 | Completed final sign-off Feb 2007 | 706 28th Av | Transceive Communications Inc. | install t-mobile wireless facility network - proposed 1 micro panel antenna consealed inside of vent cylinder and associates equipment cabinets. 2- all installed on roof of existing bldg.Details
install t-mobile wireless facility network - proposed 1 micro panel antenna consealed inside of vent cylinder and associates equipment cabinets. 2- all installed on roof of existing bldg. | $25,000 |
| Apr 25, 2006 | Expired or cancelled expired Sep 2009 | 87 06th St | installation of telecommunications facility including equipment cabinets, antennas. coax cable runs from cabinets to antennas. electrical & telephone service to equipment from (e) source.Details
installation of telecommunications facility including equipment cabinets, antennas. coax cable runs from cabinets to antennas. electrical & telephone service to equipment from (e) source. | $80,000 | |
| Mar 31, 2006 | Expired or cancelled cancelled Mar 2007 | 220 Tunnel Av | wireless telecommunications facility/3 antennas in radome mounted on tower structure & four equipment cabinets at grade.Details
wireless telecommunications facility/3 antennas in radome mounted on tower structure & four equipment cabinets at grade. | $70,000 | |
| Mar 27, 2006 | Expired or cancelled withdrawn May 2006 | 1480 Sutter St | installation of a new microcell panel antenna enclosed within a new false vent. install associated equipment cabinets, cable trays and cabling.Details
installation of a new microcell panel antenna enclosed within a new false vent. install associated equipment cabinets, cable trays and cabling. | $25,000 | |
| Mar 24, 2006 | Expired or cancelled withdrawn Apr 2006 | 1685 Haight St | installation of a new microcell panel antenna enclosed within a new false vent. installation of associated equipment cables & cable tray.Details
installation of a new microcell panel antenna enclosed within a new false vent. installation of associated equipment cables & cable tray. | $25,000 | |
| Mar 21, 2006 | Expired or cancelled withdrawn Apr 2006 | 191 05th Av | installation of new microcell antenna on rear of bldg/installation of associated equipment, cabling and cabletraysDetails
installation of new microcell antenna on rear of bldg/installation of associated equipment, cabling and cabletrays | $25,000 | |
| Mar 21, 2006 | Completed final sign-off Oct 2006 | 2550 Sloat Bl | Transceive Communications Inc. | accessory use wireless telecommunications facility one micro panel antenna and 2 cabinets/panel antenna in faux vent on roof. cabinets at ground floor in garageDetails
accessory use wireless telecommunications facility one micro panel antenna and 2 cabinets/panel antenna in faux vent on roof. cabinets at ground floor in garage | $25,000 |
| Dec 30, 2005 | Expired or cancelled expired Jan 2009 | 2000 Van Ness Av | installation of (n) cingular wireless telecommunications facility including (6) panel antennas and related equipment on the roof top.Details
installation of (n) cingular wireless telecommunications facility including (6) panel antennas and related equipment on the roof top. | $80,000 | |
| Dec 13, 2005 | Completed final sign-off Dec 2006 | 1094 Revere Av | Net-Com Services Inc | wireless telecommunications facility. 6 antennas & 4 equipemnt cabinets on roof.Details
wireless telecommunications facility. 6 antennas & 4 equipemnt cabinets on roof. | $70,000 |
| Dec 13, 2005 | Completed final sign-off Sep 2006 | 5000 Geary Bl | Alta Communication Construction | accessory use. wireless communications facility. 2 micro antennas & 2 equipemnt cabinets.Details
accessory use. wireless communications facility. 2 micro antennas & 2 equipemnt cabinets. | $25,000 |
| Nov 3, 2005 | Completed final sign-off Feb 2007 | 1800 Union St | Alta Communication Construction | install new microcell cellular antenna on (e) stair penthouse with necessary equipment in basement. cabling to be installed from new equipment to antennas via (e) lightwell.Details
install new microcell cellular antenna on (e) stair penthouse with necessary equipment in basement. cabling to be installed from new equipment to antennas via (e) lightwell. | $25,000 |
| Oct 20, 2005 | Completed final sign-off Jan 2007 | 3595 Taraval St | accessory use - micro wireless telecommunications facility. consists of 1 omni antenna and 2 equipment cabinets.Details
accessory use - micro wireless telecommunications facility. consists of 1 omni antenna and 2 equipment cabinets. | $25,000 | |
| Sep 30, 2005 | Completed final sign-off Nov 2006 | 1399 43rd Av | Net-Com Services Inc | installation of (n) micro cellular antenae on southside, top of (e) chimney, which will be concealed by a (n) transparent box.repaint entire chinney and (n) screening box to match whit bldg. installation of (2) microcell equipment cabinets on north facing wall behind chinney. (1) power ppc cabinietDetails
installation of (n) micro cellular antenae on southside, top of (e) chimney, which will be concealed by a (n) transparent box.repaint entire chinney and (n) screening box to match whit bldg. installation of (2) microcell equipment cabinets on north facing wall behind chinney. (1) power ppc cabiniet | $25,000 |
| Jun 29, 2005 | Expired or cancelled expired Jan 2009 | 950 Mason St | Metropolitan Electrical Construction | installation of (n) cingular wireless telecommunications facility, 2 micro cell antennas to be located within (e) sign. equipment to be located in arcade room.Details
installation of (n) cingular wireless telecommunications facility, 2 micro cell antennas to be located within (e) sign. equipment to be located in arcade room. | $40,000 |
| Mar 15, 2005 | Completed final sign-off May 2005 | 1201 Green St | Buchanan General Contracting Co | field change to original pa# 2004/06/01/5235. chicklet atenna to be remove from facade of 1st floorDetails
field change to original pa# 2004/06/01/5235. chicklet atenna to be remove from facade of 1st floor | $10,000 |
| Nov 22, 2004 | Completed final sign-off Mar 2006 | 1747 Church St | Metropolitan Electrical Construction | install generator of antennas & associated equipment for aws network.antennas consist of 1 pair ofDetails
install generator of antennas & associated equipment for aws network.antennas consist of 1 pair of | $70,000 |
| Nov 22, 2004 | Completed final sign-off May 2005 | 101 West Portal Av | Metropolitan Electrical Construction | install/operate of antennas & associated equipment for aws network.antennas consist of 1 pair ofDetails
install/operate of antennas & associated equipment for aws network.antennas consist of 1 pair of | $70,000 |
| Nov 17, 2004 | Completed final sign-off Aug 2006 | 1135 Evans Av | Alcoa Wireless Network Services Inc. | slab on grade pour and tel co to slab with radio cabinets antennas to mount on existing pge poleDetails
slab on grade pour and tel co to slab with radio cabinets antennas to mount on existing pge pole | $75,000 |