Robert Fukuda
- Listed as
- architect
- Firm
- Robert Fukuda Architect
- Based in
- Oakland
- On San Francisco permits
- Jul 2006 to Dec 2022
18 permits since 2000 (architect on 18 permits): 13 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 1527 Baker St | to comply with accessible business entrance program per ordinance 51-16. abe#202207051585. requesting technical infeasibility but making improvements to the extent possible. enlarge entry clearance for (e) 32" w/door, make ramp threshold transitions, lever hardwareDetails
to comply with accessible business entrance program per ordinance 51-16. abe#202207051585. requesting technical infeasibility but making improvements to the extent possible. enlarge entry clearance for (e) 32" w/door, make ramp threshold transitions, lever hardware | $25,000 | |
| Dec 28, 2021 | Completed final sign-off Jul 2022 | 944 York St | M D Construction | kitchen remodel includes new kitchen exhaust, replace (e) 3-rear windows, one light-well window in kind new mill work and finishes througout.Details
kitchen remodel includes new kitchen exhaust, replace (e) 3-rear windows, one light-well window in kind new mill work and finishes througout. | $95,000 |
| Apr 29, 2021 | Completed final sign-off Jul 2021 | 394 Fair Oaks St | Burton Builders Llc | unit #1: new foundation drainage at low property point.Details
unit #1: new foundation drainage at low property point. | $15,000 |
| Jul 14, 2020 | Completed final sign-off Jan 2021 | 3987 19th St | Aviv Construction Inc | partially interior remodel (no additoinal square footage) including new bedroom & bathroom, new skylights, new air conditioning serving 3rd fl only, new washer/dryer in existing bathroom, mew interior door to gorund floor bonus room.Details
partially interior remodel (no additoinal square footage) including new bedroom & bathroom, new skylights, new air conditioning serving 3rd fl only, new washer/dryer in existing bathroom, mew interior door to gorund floor bonus room. | $190,000 |
| Jun 6, 2019 | Expired or cancelled cancelled Dec 2020 | 4450 24th St | alter site permit to revision to permit: remove garage and driveway from scope #201606240778Details
alter site permit to revision to permit: remove garage and driveway from scope #201606240778 | ||
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 850 Powell St | Larkspur Builders Inc. | unit 106; kitchen relocation & remodel, reconfigure existing non structural partition, interiror onlyDetails
unit 106; kitchen relocation & remodel, reconfigure existing non structural partition, interiror only | $75,000 |
| Feb 8, 2018 | Completed final sign-off Aug 2018 | 393 Hayes St | Bridges Mr Llc | g/f -partial ti of (e) restaurant. interior work only, new pizza oven, new service counter, minor plm/ele/lighting, (e) sprinkler. (sprinkler under sep permit) maher naDetails
g/f -partial ti of (e) restaurant. interior work only, new pizza oven, new service counter, minor plm/ele/lighting, (e) sprinkler. (sprinkler under sep permit) maher na | $58,000 |
| Apr 21, 2017 | Completed final sign-off Jun 2017 | 115 Sansome St | Gci, Inc | historic door & door swing to remain. no additional work. revision to #2016-1223-5796.Details
historic door & door swing to remain. no additional work. revision to #2016-1223-5796. | |
| Dec 23, 2016 | Completed final sign-off Jun 2017 | 115 Sansome St | Gci, Inc | 1 st flr: restaurant ti - plumbing, electrical lighting mechanical and new finishes. convert (e) retail to restaurantDetails
1 st flr: restaurant ti - plumbing, electrical lighting mechanical and new finishes. convert (e) retail to restaurant | $350,000 |
| Jul 26, 2016 | Completed final sign-off Apr 2017 | 3719 Scott St | 2nd floor - kitchen and bathroom remodel. electrical upgrades, window replacement. maher naDetails
2nd floor - kitchen and bathroom remodel. electrical upgrades, window replacement. maher na | $25,000 | |
| Jun 24, 2016 | Expired or cancelled cancelled Dec 2020 | 4450 24th St | garage addition & basement remodel. new exterior finishes, reversal of previous front addition. new exterior stair & landing in (e) locations. interior bath & kitchen renovations. 2 new bathrooms.Details
garage addition & basement remodel. new exterior finishes, reversal of previous front addition. new exterior stair & landing in (e) locations. interior bath & kitchen renovations. 2 new bathrooms. | $300,000 | |
| May 31, 2016 | Completed final sign-off Nov 2018 | 1546 Underwood Av | convert (e) garage & storage space into living space. extend ground floor toward rear with the addition of one bedroom. build deck in back yard, access from kitchen, above new rear bedroom, also add another new bedroom, & bathroom & relocate laundry.Details
convert (e) garage & storage space into living space. extend ground floor toward rear with the addition of one bedroom. build deck in back yard, access from kitchen, above new rear bedroom, also add another new bedroom, & bathroom & relocate laundry. | $50,000 | |
| Jan 30, 2014 | Completed final sign-off Dec 2018 | 1117 Howard St | Reliable Construction Inc | change of use. comply w/ nov 201279657, demo interior, construct 2 bedrooms, 1-1/2 baths, media room, kitchen, new front door entry off of howard st. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use. comply w/ nov 201279657, demo interior, construct 2 bedrooms, 1-1/2 baths, media room, kitchen, new front door entry off of howard st. ** maher: compliance with ordinance no# 155-13 not required ** | $400,000 |
| May 31, 2012 | Never finaled issued Jul 2012, no final | 3059 Fillmore St | tenant space improvements from vacant comm to wellness center w/yoga & massage room including demo of non-structural elements, new finishes, new ada upgrades. medical use for planning code. all therapists will have advanced state massage license. fire sprinkler head layout under separate permit.Details
tenant space improvements from vacant comm to wellness center w/yoga & massage room including demo of non-structural elements, new finishes, new ada upgrades. medical use for planning code. all therapists will have advanced state massage license. fire sprinkler head layout under separate permit. | $75,000 | |
| Jan 21, 2011 | Completed final sign-off Sep 2012 | 37 Miguel St | revision to 200712281490. relocate kitchen from 3rd to 2nd floor in unit c. add shear wall as required and relocate interior stairs.newe proprty line protection per ab 009Details
revision to 200712281490. relocate kitchen from 3rd to 2nd floor in unit c. add shear wall as required and relocate interior stairs.newe proprty line protection per ab 009 | $20,000 | |
| Nov 15, 2010 | Expired or cancelled cancelled Jan 2026 | 316 Melrose Av | Upcycle Builders Inc. | crawlspace storage/shelving upgrade, reroute some plumbing & hvac to improve head clearance. provide new floor framing & sheathing to replace the (e) floor framing & sheathing. provide new stairs & wood shelfing to replace the existing.Details
crawlspace storage/shelving upgrade, reroute some plumbing & hvac to improve head clearance. provide new floor framing & sheathing to replace the (e) floor framing & sheathing. provide new stairs & wood shelfing to replace the existing. | $10,000 |
| Feb 9, 2010 | Completed final sign-off Apr 2010 | 217 Divisadero St | Har Bro Of No. California | remove & replace (e) drywall ceiling with new non-sound conductive ceiling in unit #217Details
remove & replace (e) drywall ceiling with new non-sound conductive ceiling in unit #217 | $35,000 |
| Jul 21, 2006 | Completed final sign-off Nov 2006 | 1045 Mission St | remodel of existing building lobby scope of remodeled items occurs within the existinb building envelope. remodel includis: the demo of existin case work and reelocation of existing mailboxes that are currently mounted in the casework, installation of new reception/security, storage desk within***Details
remodel of existing building lobby scope of remodeled items occurs within the existinb building envelope. remodel includis: the demo of existin case work and reelocation of existing mailboxes that are currently mounted in the casework, installation of new reception/security, storage desk within*** | $36,272 |