Block 3027A, lot 094
316 Melrose Ave
- City’s use
- Single Family Residential
- Built
- 1960
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,201 sq ft
- Lot
- 4,120 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2017 | Never finaled issued Sep 2017, no final | 316 Melrose Av | street space permitDetails
street space permit | ||
| Nov 4, 2016 | Completed final sign-off Dec 2016 | 316 Melrose Av | Grove Construction | repair joist & decking & handrail in-kind, work less than 50%, (e) 6'x16' deck is located at rear of home.Details
repair joist & decking & handrail in-kind, work less than 50%, (e) 6'x16' deck is located at rear of home. | $8,500 |
| Nov 7, 2012 | Completed final sign-off Dec 2012 | 316 Melrose Av | Mr. Roofing, Inc. | reroofingDetails
reroofing | $13,000 |
| Nov 15, 2010 | Expired or cancelled cancelled Jan 2026 | 316 Melrose Av | Upcycle Builders Inc. | crawlspace storage/shelving upgrade, reroute some plumbing & hvac to improve head clearance. provide new floor framing & sheathing to replace the (e) floor framing & sheathing. provide new stairs & wood shelfing to replace the existing.Details
crawlspace storage/shelving upgrade, reroute some plumbing & hvac to improve head clearance. provide new floor framing & sheathing to replace the (e) floor framing & sheathing. provide new stairs & wood shelfing to replace the existing. | $10,000 |
| Dec 9, 2009 | Completed final sign-off Dec 2009 | 316 Melrose Av | Upcycle Builders | voluntary seismic partial strenthening. fnd. bolting, installation of fnd. clips where necessary, shearwall in garage & basement. bolts are 5/8" dia., 6-1/4" embement w/3" sq. washer plate. nailing 4" edge, 12" field w/ 8p nails. also install l70 clips in ea. bay, north & south sides w/tico nails.Details
voluntary seismic partial strenthening. fnd. bolting, installation of fnd. clips where necessary, shearwall in garage & basement. bolts are 5/8" dia., 6-1/4" embement w/3" sq. washer plate. nailing 4" edge, 12" field w/ 8p nails. also install l70 clips in ea. bay, north & south sides w/tico nails. | $9,000 |
| Nov 4, 2002 | Completed final sign-off Mar 2003 | 316 Melrose Av | V And Company, Incorporated | revision to permit 200201247665 addition of rear deckDetails
revision to permit 200201247665 addition of rear deck | $20,000 |
| Jan 24, 2002 | Completed final sign-off Dec 2002 | 316 Melrose Av | add bath at lower level;remodel (e)bedrm @lower level;repl windowsDetails
add bath at lower level;remodel (e)bedrm @lower level;repl windows | $60,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.