Paul Linden Markoff
- Listed as
- authorized agent-others, contractor
- Firm
- Markoff Structural Pest Control
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to Oct 2026
865 permits since 2000 (contractor on 865 permits, authorized agent-others on 1 permit): 584 completed, 22 in progress, 141 never finaled, 118 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gil Construction & Assoc Inc.
- Architects
- Jessica Boddorff
- Engineers
- Monte Stott (6), Hamid Kaboodanian (2)
Most recent permits
Showing the 100 most recent of 865.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2026 | Completed final sign-off Nov 2026 | 240 Yerba Buena Av | Markoff Structural Pest Control | markoff spcc termite report #26612 item # 1Details
markoff spcc termite report #26612 item # 1 | $14,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 3010 Fulton St | Markoff Structural Pest Control | markoff spcc termite report 26521Details
markoff spcc termite report 26521 | $1,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 2100 Sutter St | Markoff Structural Pest Control | markoff spcc termite report 26594 supp item #1Details
markoff spcc termite report 26594 supp item #1 | $16,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 374 San Benito Wy | Markoff Structural Pest Control | markoff spcc termite report 26367 and supplemental termite report 26367suppDetails
markoff spcc termite report 26367 and supplemental termite report 26367supp | $46,000 |
| Jun 4, 2026 | Completed final sign-off Sep 2026 | 3010 Fulton St | Markoff Structural Pest Control | repair/replace fungus and termite damaged trim/siding and framing at bay window soffits on fulton st and 6th ave sides. all repairs in kind.Details
repair/replace fungus and termite damaged trim/siding and framing at bay window soffits on fulton st and 6th ave sides. all repairs in kind. | $39,000 |
| Apr 30, 2026 | In progress issued Apr 2026 | 45 Wilder St | Markoff Structural Pest Control | termite report 26183supp 4/29/26 item #1. repair and replace fungus and termite framing at rear wall. replace 5 windows per termite report. replace plywood siding. finish paint.Details
termite report 26183supp 4/29/26 item #1. repair and replace fungus and termite framing at rear wall. replace 5 windows per termite report. replace plywood siding. finish paint. | $40,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 263 19th Av | Markoff Structural Pest Control | markoff spc termite report #25623: all items.Details
markoff spc termite report #25623: all items. | $9,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 167 21st Av | Markoff Structural Pest Control, Gil Construction & Assoc Inc. | install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest reportDetails
install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest report | $20,000 |
| Feb 19, 2026 | Completed final sign-off May 2026 | 167 21st Av | Markoff Structural Pest Control | markoff structural pest control termite report #25971 items 1-6. stucco and siding repair in kind. replace termite and fungus damage to studs at left , right and rear corners, restucco area of repair in kindDetails
markoff structural pest control termite report #25971 items 1-6. stucco and siding repair in kind. replace termite and fungus damage to studs at left , right and rear corners, restucco area of repair in kind | $36,000 |
| Jan 12, 2026 | Completed final sign-off Apr 2026 | 4475 23rd St | Markoff Structural Pest Control | termite report 25835- replace fungus damage at decks left side less than 50%. remove stucco at rear replace fungus damage frame. replace stucco in kindDetails
termite report 25835- replace fungus damage at decks left side less than 50%. remove stucco at rear replace fungus damage frame. replace stucco in kind | $40,000 |
| Jan 12, 2026 | Completed final sign-off Feb 2026 | 2395 Pacific Av | Markoff Structural Pest Control | termite report 26012- repair fungus damage at rear stairs less than 50%Details
termite report 26012- repair fungus damage at rear stairs less than 50% | $20,000 |
| Oct 24, 2025 | Completed final sign-off Dec 2025 | 132 Evelyn Wy | Markoff Structural Pest Control | termite report #25841 items #1, 4, 5, replace/repair fungus damage. re-stucco in kind.Details
termite report #25841 items #1, 4, 5, replace/repair fungus damage. re-stucco in kind. | $19,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 1775 Sanchez St | Markoff Structural Pest Control | termite damage repair report #25696 items 1 and 2. repair is not street facing.Details
termite damage repair report #25696 items 1 and 2. repair is not street facing. | $19,000 |
| Sep 23, 2025 | Completed final sign-off Oct 2025 | 84 Fortuna Av | Markoff Structural Pest Control | termite report 25563 items 1, 2, 3, 4. no work visable from street. repair replace fungus and beetle damage at rear deck less than 50%.Details
termite report 25563 items 1, 2, 3, 4. no work visable from street. repair replace fungus and beetle damage at rear deck less than 50%. | $18,400 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 2160 Leavenworth St | Markoff Structural Pest Control | to comply with nov 202533961. proposed maintaince platform replacement. reference termite report 25203 item 1.Details
to comply with nov 202533961. proposed maintaince platform replacement. reference termite report 25203 item 1. | $10,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 575 Bella Vista Wy | Markoff Structural Pest Control | #1 repair termite damage at sheeting. restucco in kind. markoff structual pest control termite report #25581supp. not street visible, back of property.Details
#1 repair termite damage at sheeting. restucco in kind. markoff structual pest control termite report #25581supp. not street visible, back of property. | $25,000 |
| Aug 14, 2025 | Completed final sign-off Oct 2025 | 124 Baltimore Wy | Markoff Structural Pest Control | markoff structural pest control report #25440 items 1-5 #1 2" cap foundation #2 restucco in kind #3 restucco in kindDetails
markoff structural pest control report #25440 items 1-5 #1 2" cap foundation #2 restucco in kind #3 restucco in kind | $21,000 |
| Jul 21, 2025 | Completed final sign-off Dec 2025 | 230 Duncan St | Markoff Structural Pest Control | markoff spcc termite report #25552 item#1. remove & replace termite/fungus damaged siding as needed, in king at front elevation.Details
markoff spcc termite report #25552 item#1. remove & replace termite/fungus damaged siding as needed, in king at front elevation. | $30,000 |
| Jul 3, 2025 | In progress issued Jul 2025 | 25 Miraloma Dr | Markoff Structural Pest Control | markoff structural pest control report #25227 item #1Details
markoff structural pest control report #25227 item #1 | $5,400 |
| May 27, 2025 | In progress issued Jun 2025 | 173 Evelyn Wy | Markoff Structural Pest Control | front porch and stair replacement in kind. termite report# 24507Details
front porch and stair replacement in kind. termite report# 24507 | $30,000 |
| May 21, 2025 | In progress issued May 2025 | 173 Evelyn Wy | Markoff Structural Pest Control | termite report #24507 06/19/2024 item 1,3,4. remove stucco, repair fungus and termite damage, restucco (not visible) in kind to match. remove fungus and termite damaged silpiate, install 12'' capover concrete.Details
termite report #24507 06/19/2024 item 1,3,4. remove stucco, repair fungus and termite damage, restucco (not visible) in kind to match. remove fungus and termite damaged silpiate, install 12'' capover concrete. | $41,000 |
| Mar 20, 2025 | Completed final sign-off May 2025 | 1915 15th Av | Markoff Structural Pest Control | revision to the existing permit#202310037952. reduce scope of work, eliminate one post and footing, and change to beam dimensions.Details
revision to the existing permit#202310037952. reduce scope of work, eliminate one post and footing, and change to beam dimensions. | |
| Mar 7, 2025 | In progress issued Mar 2025 | 109 Cornwall St | Markoff Structural Pest Control | markoff structural pest control termite report #25141 items #1-10. #1 18" sonatube 6 x 6 concrete bracket. existing rebarDetails
markoff structural pest control termite report #25141 items #1-10. #1 18" sonatube 6 x 6 concrete bracket. existing rebar | $40,175 |
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 2927 Sacramento St | Markoff Structural Pest Control | markoff structural pest control termite report 18130 item#3. repair rear stairs less than 50%Details
markoff structural pest control termite report 18130 item#3. repair rear stairs less than 50% | $29,000 |
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 1279 41st Av | Markoff Structural Pest Control | termite repair report #25044 #1. repair in kind; not visible from street.Details
termite repair report #25044 #1. repair in kind; not visible from street. | $39,000 |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 78 Stanton St | Markoff Structural Pest Control | markoff spcc termite report # 24731.Details
markoff spcc termite report # 24731. | $14,800 |
| Nov 5, 2024 | In progress issued Nov 2024 | 222 28th Av | Markoff Structural Pest Control | markoff report #24901 item 1, 2, & 3Details
markoff report #24901 item 1, 2, & 3 | $14,000 |
| Nov 5, 2024 | Completed final sign-off Aug 2025 | 415 Buchanan St | Markoff Structural Pest Control | markoff spc limited report #24754 item #1 - #6Details
markoff spc limited report #24754 item #1 - #6 | $49,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 199 Graystone Tr | Markoff Structural Pest Control | markoff spc limited report #22884lim, items #1,2Details
markoff spc limited report #22884lim, items #1,2 | $18,000 |
| Oct 25, 2024 | Completed final sign-off Apr 2025 | 1064 Dolores St | Markoff Structural Pest Control | markoff spc termite report # 23839 items #1 and #2Details
markoff spc termite report # 23839 items #1 and #2 | $19,000 |
| Oct 11, 2024 | Completed final sign-off Nov 2024 | 75 Gaviota Wy | Markoff Structural Pest Control | markoff spc termite report 24718 item 1Details
markoff spc termite report 24718 item 1 | $12,000 |
| Oct 11, 2024 | In progress issued Oct 2024 | 4912 03rd St | Markoff Structural Pest Control | termite report #2 11/7/23 repair/replace fungus and termite damage at bay windows 3 restucco in kindDetails
termite report #2 11/7/23 repair/replace fungus and termite damage at bay windows 3 restucco in kind | $22,000 |
| Oct 4, 2024 | Completed final sign-off Dec 2024 | 852 Treat Av | Markoff Structural Pest Control | markoff limited structural pest report # 24550 item #1. all structural repairs to be made in kindDetails
markoff limited structural pest report # 24550 item #1. all structural repairs to be made in kind | $4,500 |
| Sep 24, 2024 | Completed final sign-off Nov 2024 | 1915 15th Av | Markoff Structural Pest Control | markoff spc limited report #24528 lim items# 1 and 2Details
markoff spc limited report #24528 lim items# 1 and 2 | $95,000 |
| Aug 22, 2024 | In progress issued Aug 2024 | 18 Bitting Av | Markoff Structural Pest Control | termite report 24657 supp#1 repair fungus damage restucco in kindDetails
termite report 24657 supp#1 repair fungus damage restucco in kind | $8,000 |
| Aug 21, 2024 | Completed final sign-off Sep 2024 | 260 Clinton Pk | Markoff Structural Pest Control | termite report #24584 item 4. repair fungas and termite damage at rear porch and stairs less than 50% nov 202303752 #9.Details
termite report #24584 item 4. repair fungas and termite damage at rear porch and stairs less than 50% nov 202303752 #9. | $19,000 |
| Jul 3, 2024 | In progress issued Jul 2024 | 1423 Plymouth Av | Markoff Structural Pest Control | markoff structural pest control termite report # 24258, item #1-3 in kind repair of termite damage per report.Details
markoff structural pest control termite report # 24258, item #1-3 in kind repair of termite damage per report. | $30,000 |
| Jul 3, 2024 | Completed final sign-off Nov 2024 | 1915 15th Av | Markoff Structural Pest Control | markoff structural pest control termite report # 24258, item #1 res-stucco in kin no visable from street, termite repair.Details
markoff structural pest control termite report # 24258, item #1 res-stucco in kin no visable from street, termite repair. | $15,000 |
| Jun 25, 2024 | In progress issued Jun 2024 | 120 Taraval St | Markoff Structural Pest Control | markoff structural pest control termite report # 24404 supp item #1: replace fungus and termite damage at bay window soffit. re-stucco in kind.Details
markoff structural pest control termite report # 24404 supp item #1: replace fungus and termite damage at bay window soffit. re-stucco in kind. | $9,000 |
| Jun 25, 2024 | Completed final sign-off Aug 2024 | 2750 Scott St | Markoff Structural Pest Control | markoff structural pest control termite report# 24319 items # 1-4: replace fungus and termite damage at bay window soffit. re-stucco in kind. replace fungus damage to siding at right side middle.Details
markoff structural pest control termite report# 24319 items # 1-4: replace fungus and termite damage at bay window soffit. re-stucco in kind. replace fungus damage to siding at right side middle. | $14,000 |
| May 20, 2024 | In progress issued Jun 2025 | 475 Chestnut St | Markoff Structural Pest Control | replace existing rear roof deck in kindDetails
replace existing rear roof deck in kind | $30,000 |
| May 3, 2024 | Completed final sign-off May 2024 | 34 Porter St | Markoff Structural Pest Control | termite report #24116 item 1,2,3,4,5. repair fungus damage in kind.Details
termite report #24116 item 1,2,3,4,5. repair fungus damage in kind. | $27,000 |
| Apr 24, 2024 | In progress issued Apr 2024 | 20 Van Buren St | Markoff Structural Pest Control | termite report # 24106 02/15/24 items #1-5 all. repair fungus damage in kind, replace stucco in kind. work not visible from street.Details
termite report # 24106 02/15/24 items #1-5 all. repair fungus damage in kind, replace stucco in kind. work not visible from street. | $20,000 |
| Apr 24, 2024 | Completed final sign-off Jun 2024 | 500 Myra Wy | Markoff Structural Pest Control | replace two story deck and stairs "in kind" slightly narrower - termite and dryrot.Details
replace two story deck and stairs "in kind" slightly narrower - termite and dryrot. | $60,000 |
| Apr 2, 2024 | In progress issued Apr 2024 | 1914 Webster St | Markoff Structural Pest Control | termite report#24122 02/21/2024 items #1-#9 all repair termite and fungus damage at all areas in kind. inspection report stamped received.Details
termite report#24122 02/21/2024 items #1-#9 all repair termite and fungus damage at all areas in kind. inspection report stamped received. | $31,000 |
| Mar 29, 2024 | Completed final sign-off Apr 2024 | 1541 Filbert St | Markoff Structural Pest Control | markoff structural pest control termite report #22772, item #1. repair termite & fungus damage at rear, repair in-kind, not visible from street. scope includes: no more than 3 studs repair & replace; no more than 50 sf of dry rot shtg. replacement; no more than 250 sf of stucco repair & replacement.Details
markoff structural pest control termite report #22772, item #1. repair termite & fungus damage at rear, repair in-kind, not visible from street. scope includes: no more than 3 studs repair & replace; no more than 50 sf of dry rot shtg. replacement; no more than 250 sf of stucco repair & replacement. | $22,000 |
| Mar 18, 2024 | In progress issued Mar 2024 | 1831 16th Av | Markoff Structural Pest Control | termite report # 23591 dated 8/3/23, items 1,2,3,4 all. all work to be done repaired/replaced in kind.Details
termite report # 23591 dated 8/3/23, items 1,2,3,4 all. all work to be done repaired/replaced in kind. | $24,400 |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 4914 03rd St | Markoff Structural Pest Control | markoff structural pest control termite report # 23847 items # 8, 10 and supplemental items #1 and 2.Details
markoff structural pest control termite report # 23847 items # 8, 10 and supplemental items #1 and 2. | $35,000 |
| Jan 30, 2024 | In progress issued Jan 2024 | 2081 Mission St | Markoff Structural Pest Control | markoff structural pest control report # 23826 items #1. no exterior workDetails
markoff structural pest control report # 23826 items #1. no exterior work | $35,000 |
| Dec 11, 2023 | In progress issued Dec 2023 | 3925 Washington St | Markoff Structural Pest Control | markoff structural pest control termite report #23831 items# 1-7Details
markoff structural pest control termite report #23831 items# 1-7 | $23,100 |
| Dec 1, 2023 | Completed final sign-off Feb 2024 | 15 Bradford St | Markoff Structural Pest Control | markoff structural pest control termite report #22570 items #2, 3Details
markoff structural pest control termite report #22570 items #2, 3 | $8,400 |
| Dec 1, 2023 | In progress issued Dec 2023 | 155 Bartlett St | Markoff Structural Pest Control | fungus and termite damage to stairs exterior. repair as necessary less than 50%Details
fungus and termite damage to stairs exterior. repair as necessary less than 50% | $40,000 |
| Oct 11, 2023 | Completed final sign-off Oct 2023 | 700 23rd Av | Markoff Structural Pest Control | markoff structural pest control termite report #23538 items #2,3,5Details
markoff structural pest control termite report #23538 items #2,3,5 | $18,000 |
| Oct 3, 2023 | Completed final sign-off May 2025 | 1915 15th Av | Markoff Structural Pest Control | extension of (e) second floor deck at the rear of (e) single family dwelling, replace (e) window at rear with new doorDetails
extension of (e) second floor deck at the rear of (e) single family dwelling, replace (e) window at rear with new door | $20,000 |
| Sep 18, 2023 | Completed final sign-off Oct 2023 | 2056 16th Av | Markoff Structural Pest Control | markoff structural pest control report #23548 items 1,2,3. repair fungus damage and termite damage. restucco in kind.Details
markoff structural pest control report #23548 items 1,2,3. repair fungus damage and termite damage. restucco in kind. | $12,000 |
| Sep 5, 2023 | Never finaled issued Sep 2023, no final | 240 09th Av | Markoff Structural Pest Control | markoff structural pest control termite report# 23315, 23315supp2Details
markoff structural pest control termite report# 23315, 23315supp2 | $37,000 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 3052 Sacramento St | Markoff Structural Pest Control | markoff structural pest control termite report #23502 items 1-5 onlyDetails
markoff structural pest control termite report #23502 items 1-5 only | $23,400 |
| Aug 9, 2023 | Completed final sign-off May 2024 | 190 Arguello Bl | Markoff Structural Pest Control | termite report #23403 5/19/23 items #4 and #5. repair rear stairs more than 50%. replace in kind per plans.Details
termite report #23403 5/19/23 items #4 and #5. repair rear stairs more than 50%. replace in kind per plans. | $59,000 |
| Aug 9, 2023 | Completed final sign-off Sep 2023 | 1169 Green St | Markoff Structural Pest Control | termite report #22798lim 1/25/23 item #1Details
termite report #22798lim 1/25/23 item #1 | $9,000 |
| Jun 12, 2023 | Completed final sign-off Jun 2023 | 11 Dolores St | Markoff Structural Pest Control | termite report #13730, repair termite & fungus @ middle stairs, less than 50%. complaint #202308173, 604 affidavitDetails
termite report #13730, repair termite & fungus @ middle stairs, less than 50%. complaint #202308173, 604 affidavit | $4,000 |
| Jun 12, 2023 | Completed final sign-off Jun 2023 | 3783 20th St | Markoff Structural Pest Control | termite report #21363, repair back porch & steps, termite & fungus, less than 50%. complaint #202307319, 604 affidavitDetails
termite report #21363, repair back porch & steps, termite & fungus, less than 50%. complaint #202307319, 604 affidavit | $13,400 |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 159 09th Av | Markoff Structural Pest Control | units 159 & 161: termite report #23338, items 1-9, repair termite & fungus damageDetails
units 159 & 161: termite report #23338, items 1-9, repair termite & fungus damage | $20,000 |
| May 25, 2023 | Never finaled issued May 2023, no final | 312 Arguello Bl | Markoff Structural Pest Control | arkoff structural pest control termite report # 23340: nov complaint 20229694 item#3. repair rear stairs, replace in kind.Details
arkoff structural pest control termite report # 23340: nov complaint 20229694 item#3. repair rear stairs, replace in kind. | $6,000 |
| May 25, 2023 | Completed final sign-off Jun 2023 | 44 Langton St | Markoff Structural Pest Control | to obtain final inspection for work approved under pa# 201907226526: all work is complete.Details
to obtain final inspection for work approved under pa# 201907226526: all work is complete. | |
| May 11, 2023 | Completed final sign-off May 2023 | 1409 Kansas St | Markoff Structural Pest Control | markoff structural pest control termite report #23148 item #1Details
markoff structural pest control termite report #23148 item #1 | $10,400 |
| May 11, 2023 | Completed final sign-off Jun 2023 | 34 06th Av | Markoff Structural Pest Control | termite report #12529 item #7 repair in kindDetails
termite report #12529 item #7 repair in kind | $30,000 |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 7725 Geary Bl | Markoff Structural Pest Control | termite report#22313 04/06/2022 item#1 repair fungus damage at rear deckDetails
termite report#22313 04/06/2022 item#1 repair fungus damage at rear deck | $30,000 |
| Apr 6, 2023 | Completed final sign-off Apr 2023 | 116 Park St | Markoff Structural Pest Control | termite report # 23129 lim 3/21/23 repair base of posts item#1. repair and replace in kind for termite damage.Details
termite report # 23129 lim 3/21/23 repair base of posts item#1. repair and replace in kind for termite damage. | $2,400 |
| Apr 6, 2023 | Completed final sign-off Apr 2023 | 23 Magellan Av | Markoff Structural Pest Control | termite report# 221028 11/7/22 items#1-5 termite and dryrot fungus repair. repair and replace in kind for termite damage.Details
termite report# 221028 11/7/22 items#1-5 termite and dryrot fungus repair. repair and replace in kind for termite damage. | $14,000 |
| Mar 10, 2023 | Completed final sign-off Jun 2023 | 77 Capp St | Markoff Structural Pest Control | termite report# 23019 date 1/11/2023 items #1 through #8 all. fungus, dryrot, termite repairs. interior garage, lightwells, rear stairs.Details
termite report# 23019 date 1/11/2023 items #1 through #8 all. fungus, dryrot, termite repairs. interior garage, lightwells, rear stairs. | $49,000 |
| Jan 24, 2023 | Never finaled issued Jan 2023, no final | 115 28th Av | Markoff Structural Pest Control | termite report #221101 dated 12/14/23, item #1. repair termite and fungus damage. restucco in kind.Details
termite report #221101 dated 12/14/23, item #1. repair termite and fungus damage. restucco in kind. | $19,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2023 | 418 Corbett Av | Markoff Structural Pest Control | repair fungus and termite damage behind stucco above garage, restucco in kind repair sil plate in garageDetails
repair fungus and termite damage behind stucco above garage, restucco in kind repair sil plate in garage | $20,000 |
| Dec 15, 2022 | Expired or cancelled cancelled Jan 2026 | 329 San Jose Av | Markoff Structural Pest Control | relace 1 x 8 siding at several locations damaged by drywood termites in knd paint to match rear of buildingDetails
relace 1 x 8 siding at several locations damaged by drywood termites in knd paint to match rear of building | $15,000 |
| Nov 28, 2022 | Never finaled issued Nov 2022, no final | 223 Prague St | Markoff Structural Pest Control | termite report 22496 5/19/22 repair fungus damage to framing restucco in kindDetails
termite report 22496 5/19/22 repair fungus damage to framing restucco in kind | $12,000 |
| Nov 17, 2022 | Completed final sign-off Jun 2023 | 1440 Jones St | Markoff Structural Pest Control | replace (e) 3 story deck in kind.Details
replace (e) 3 story deck in kind. | $30,000 |
| Oct 24, 2022 | Never finaled issued Oct 2022, no final | 537 Monterey Bl | Markoff Structural Pest Control | 537-539 monterey blvd: termite report #22937 dated 10/03/2022. repair termite and fungus damage at base of bay window soffit. restuco in kind. street facingDetails
537-539 monterey blvd: termite report #22937 dated 10/03/2022. repair termite and fungus damage at base of bay window soffit. restuco in kind. street facing | $4,500 |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 400 Shrader St | Markoff Structural Pest Control | termite report # 19306 06/04/19 all items #1 - #8. all termite and dryrot repairs are in kind.Details
termite report # 19306 06/04/19 all items #1 - #8. all termite and dryrot repairs are in kind. | $40,000 |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 1144 Lake St | Markoff Structural Pest Control | termite report #22555 06/06/22 items #1 and #2: repair side stairs less than 50% repair fungus damage to frame. restucco to match in kind.Details
termite report #22555 06/06/22 items #1 and #2: repair side stairs less than 50% repair fungus damage to frame. restucco to match in kind. | $12,000 |
| Sep 28, 2022 | Never finaled filed Sep 2022, never issued | 266 Santa Paula Av | Markoff Structural Pest Control | replacement of (e) retaining wall to comply with termite report # 2289limDetails
replacement of (e) retaining wall to comply with termite report # 2289lim | $30,000 |
| Sep 19, 2022 | Never finaled issued Sep 2022, no final | 2150 Grove St | Markoff Structural Pest Control | termite report #22693: 07/22/2022 items 1-10 all. all repairs to be in-kind - all stair repair to be less than 50%.Details
termite report #22693: 07/22/2022 items 1-10 all. all repairs to be in-kind - all stair repair to be less than 50%. | $39,000 |
| Aug 8, 2022 | Completed final sign-off Oct 2022 | 685 Noe St | Markoff Structural Pest Control | termite report #22663 07/13/2022 items #1 and #5/ replace stucco in kind.Details
termite report #22663 07/13/2022 items #1 and #5/ replace stucco in kind. | $15,000 |
| Jun 29, 2022 | Completed final sign-off Oct 2024 | 30 Ord Ct | Markoff Structural Pest Control | termite report #22164 dated 2/14/22, item #1 and report #21694 dated 8/17/21, teems #1-#10Details
termite report #22164 dated 2/14/22, item #1 and report #21694 dated 8/17/21, teems #1-#10 | $60,000 |
| May 13, 2022 | Never finaled issued May 2022, no final | 1403 De Haro St | Markoff Structural Pest Control | termite report #22342 supp item #1: repair fungus damage @ rear wall & deck. repair siding.Details
termite report #22342 supp item #1: repair fungus damage @ rear wall & deck. repair siding. | $24,000 |
| May 13, 2022 | Completed final sign-off May 2022 | 165 San Anselmo Av | Markoff Structural Pest Control | termite report #21936 10/20/21 item #2: repair fungus damge to framing @ rear detached garageDetails
termite report #21936 10/20/21 item #2: repair fungus damge to framing @ rear detached garage | $4,000 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 182 Avila St | Markoff Structural Pest Control | termite report # 22253 3/22/22 item #1. interior repairs in garage.Details
termite report # 22253 3/22/22 item #1. interior repairs in garage. | $34,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 1378 Pacific Av | Markoff Structural Pest Control | termite report #21993 dated 1/4/2022, repair termite & fungus damage @ rear stairsDetails
termite report #21993 dated 1/4/2022, repair termite & fungus damage @ rear stairs | $11,000 |
| Apr 1, 2022 | Completed final sign-off Apr 2022 | 167 Anderson St | Markoff Structural Pest Control | termite report #22231 dated 3/14/2022, replace termite & fungus damage @ rear of buildingDetails
termite report #22231 dated 3/14/2022, replace termite & fungus damage @ rear of building | $29,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 1474 Sacramento St | Markoff Structural Pest Control | markoff structural pest control termite report #19643 items #1-13Details
markoff structural pest control termite report #19643 items #1-13 | $69,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 132 Orizaba Av | Markoff Structural Pest Control | termite report #22255 dated 03/22/22.Details
termite report #22255 dated 03/22/22. | $9,000 |
| Feb 14, 2022 | Completed final sign-off Mar 2022 | 140 Oak Park Dr | Markoff Structural Pest Control | termite report #21948 items # 1-4. repair fungus damage replace siding and stucco in kind.Details
termite report #21948 items # 1-4. repair fungus damage replace siding and stucco in kind. | $14,500 |
| Nov 30, 2021 | Completed final sign-off Mar 2022 | 2737 Sutter St | Markoff Structural Pest Control | termite report # 18154 3/23/2018 & supp report 11/11/21 item #'s 1,3,4,5 supp repor #1, repair termite and dryrot damageDetails
termite report # 18154 3/23/2018 & supp report 11/11/21 item #'s 1,3,4,5 supp repor #1, repair termite and dryrot damage | $35,000 |
| Oct 7, 2021 | Never finaled issued Oct 2021, no final | 836 Guerrero St | Markoff Structural Pest Control | termits and dryrot report # 20656 10/12/2020Details
termits and dryrot report # 20656 10/12/2020 | $25,000 |
| Sep 2, 2021 | Completed final sign-off Apr 2022 | 48 Collins St | Markoff Structural Pest Control | termite report# 21524 item#1: repair termite damage: replace stucco in kindDetails
termite report# 21524 item#1: repair termite damage: replace stucco in kind | $12,500 |
| Aug 31, 2021 | Never finaled issued Aug 2021, no final | 378 Franconia St | Markoff Structural Pest Control | to comply with comlaint 202181535. termite report #21446 05/25/2021 item #1 only.Details
to comply with comlaint 202181535. termite report #21446 05/25/2021 item #1 only. | $4,400 |
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 165 Broderick St | Markoff Structural Pest Control | to obtain a final inspection for work approved under previous permit application 201909171846. all work is complete.Details
to obtain a final inspection for work approved under previous permit application 201909171846. all work is complete. | |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 4329 25th St | Markoff Structural Pest Control | termite report #21667 8/11/21 #1,2,3,4,5Details
termite report #21667 8/11/21 #1,2,3,4,5 | $28,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 22 Terra Vista Av | Markoff Structural Pest Control | termite report #21615 7/19/21, item #1. repair termmite & dryrot damage at various location to steps and porch.Details
termite report #21615 7/19/21, item #1. repair termmite & dryrot damage at various location to steps and porch. | $28,000 |
| Jun 9, 2021 | Completed final sign-off Jun 2021 | 947 Church St | Markoff Structural Pest Control | markoff structural pes control co. report 20566 item #3Details
markoff structural pes control co. report 20566 item #3 | $8,000 |
| May 11, 2021 | Completed final sign-off Jul 2021 | 600 Alvarado St | Markoff Structural Pest Control | termit report 21345 dated 5/4/2021 items #1 & 2 termite & fungus.Details
termit report 21345 dated 5/4/2021 items #1 & 2 termite & fungus. | $37,000 |
| May 11, 2021 | Completed final sign-off Jun 2021 | 1244 California St | Markoff Structural Pest Control | termte report 1/2/3/4/8/9 dated 4/21/2021. foundation 12in max concrete cap 60lf. repair fungus & dryrot unit bathrooms.Details
termte report 1/2/3/4/8/9 dated 4/21/2021. foundation 12in max concrete cap 60lf. repair fungus & dryrot unit bathrooms. | $69,000 |