Block 2807, lot 039
4475 23rd St
- City’s use
- Multi-Family Residential
- Built
- 1956
- Stories
- 3
- Units
- 12
- Rooms
- 12 bedrooms, 12 bathrooms
- Building
- 7,725 sq ft
- Lot
- 5,697 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 12, 2026 | Completed final sign-off Apr 2026 | 4475 23rd St | Markoff Structural Pest Control | termite report 25835- replace fungus damage at decks left side less than 50%. remove stucco at rear replace fungus damage frame. replace stucco in kindDetails
termite report 25835- replace fungus damage at decks left side less than 50%. remove stucco at rear replace fungus damage frame. replace stucco in kind | $40,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 4475 23rd St | Quintanilla Builders Inc | unit 7: 2/f. 1. rehab existing kitchen, rehab existing bathroom, install washer and dryer. no removal of structural walls.Details
unit 7: 2/f. 1. rehab existing kitchen, rehab existing bathroom, install washer and dryer. no removal of structural walls. | $68,000 |
| Sep 26, 2025 | In progress issued Sep 2025 | 4475 23rd St | Dabl- Rr Builders Inc | exploratory work, removing sister joist to explore conditions of main sister joist. no work being done. only exploratory.Details
exploratory work, removing sister joist to explore conditions of main sister joist. no work being done. only exploratory. | $9,000 |
| Apr 9, 2025 | Completed final sign-off Jun 2025 | 4475 23rd St | Dabl- Rr Builders Inc | unit 1 & 5: front balconies repair. sister deteriorated joists repair loose guardrail base connectionDetails
unit 1 & 5: front balconies repair. sister deteriorated joists repair loose guardrail base connection | $32,000 |
| May 19, 2023 | Completed final sign-off Nov 2023 | 4475 23rd St | Brighter Bay Builders Inc, Axel8 Construction | apt 2 - 2nd flr: rehab (e) ktichen & bathroom. install new washer & elec dryer.Details
apt 2 - 2nd flr: rehab (e) ktichen & bathroom. install new washer & elec dryer. | $50,000 |
| Mar 24, 2022 | Completed final sign-off Oct 2022 | 4475 23rd St | Progress Builders | unit 10 - 3rd flr: rehab existing kitchen and bathroom.Details
unit 10 - 3rd flr: rehab existing kitchen and bathroom. | $40,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 4475 23rd St | Progress Builders | unit #5 rehabilitation of (e) kitchen and bathroom. install washer and dryer.Details
unit #5 rehabilitation of (e) kitchen and bathroom. install washer and dryer. | $28,000 |
| Apr 19, 2021 | Completed final sign-off Jul 2021 | 4475 23rd St | B-Side Inc. | unit 6: rehab bathroom rehab kitchenDetails
unit 6: rehab bathroom rehab kitchen | $25,000 |
| Apr 19, 2021 | Completed final sign-off Jul 2021 | 4475 23rd St | B-Side Inc. | unit 12: rehab bathroom rehab kitchenDetails
unit 12: rehab bathroom rehab kitchen | $25,000 |
| Dec 7, 2020 | Completed final sign-off Feb 2021 | 4475 23rd St | Brighter Bay Builders Inc | revision to pa #2020-1008-6163: unit #11 - rehabilitate existing bathroom.Details
revision to pa #2020-1008-6163: unit #11 - rehabilitate existing bathroom. | $10,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 4475 23rd St | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to comply with sec 1103.7.6.1 & nfpa 72.Details
upgrade the existing fire alarm system to comply with sec 1103.7.6.1 & nfpa 72. | $40,000 |
| Oct 8, 2020 | Completed final sign-off Feb 2021 | 4475 23rd St | Brighter Bay Builders Inc | apt #11: rehabilitate existing kitchen. install washer and dryer in existing closetDetails
apt #11: rehabilitate existing kitchen. install washer and dryer in existing closet | $35,000 |
| Jan 15, 2020 | Completed final sign-off Oct 2020 | 4475 23rd St | Erc Renovation Inc | apt #9: r/r cabinets & appliances with new.install cabinet base and countertop peninsula.install plumbing plumbing and electrical for stacked-ventless washerdryer. r/r in place new tiolet, sink and tub. install washer/dryer to closet.Details
apt #9: r/r cabinets & appliances with new.install cabinet base and countertop peninsula.install plumbing plumbing and electrical for stacked-ventless washerdryer. r/r in place new tiolet, sink and tub. install washer/dryer to closet. | $27,000 |
| Nov 12, 2019 | Completed final sign-off Feb 2020 | 4475 23rd St | Axel8 Construction | unit 4: rehab (e) kitchen 56 sq. ft., rehab (e) bath (49 sq. ft.), install waher/dryer ventless at hallwayDetails
unit 4: rehab (e) kitchen 56 sq. ft., rehab (e) bath (49 sq. ft.), install waher/dryer ventless at hallway | $20,000 |
| Jul 25, 2019 | Completed final sign-off Jan 2020 | 4475 23rd St | West Coast Premier Construction Inc | voluntary seismic retrofit using 2016 cebc a-4.Details
voluntary seismic retrofit using 2016 cebc a-4. | $85,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 4475 23rd St | B-Side Inc. | new electrical panel in unit 8. new washer and dryer in unit. replace existing toilet. no structural.Details
new electrical panel in unit 8. new washer and dryer in unit. replace existing toilet. no structural. | $25,000 |
| Jul 9, 2019 | Completed final sign-off Aug 2019 | 4475 23rd St | B-Side Inc. | unit 1. new electrical panel in unit 1. replace electrical outlets in kitchen and install washer and dryer in unit 1. no structural. replace existing toilet.Details
unit 1. new electrical panel in unit 1. replace electrical outlets in kitchen and install washer and dryer in unit 1. no structural. replace existing toilet. | $25,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 4475 23rd St | B-Side Inc. | unit 3: provide elec & plumbing line in closet for 220v ventless washer/dryer in existing closet. rewire & install washer & dryer.Details
unit 3: provide elec & plumbing line in closet for 220v ventless washer/dryer in existing closet. rewire & install washer & dryer. | $25,000 |
| Nov 5, 2018 | Completed final sign-off Nov 2018 | 4475 23rd St | administrative permit to document legal use & occupancy of bldg as a 3-story w/a basement containing a total of 12 dwelling units. this is based on a site visit & records including, water dept., assessor's records, sanborn map & dbi records. bldg was constructed in 1955 but no cfc in record. no workDetails
administrative permit to document legal use & occupancy of bldg as a 3-story w/a basement containing a total of 12 dwelling units. this is based on a site visit & records including, water dept., assessor's records, sanborn map & dbi records. bldg was constructed in 1955 but no cfc in record. no work | ||
| Oct 30, 2018 | Expired or cancelled cancelled Nov 2018 | 4475 23rd St | permit to establish legal use and occpancy of building and verify unit countDetails
permit to establish legal use and occpancy of building and verify unit count | ||
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 4475 23rd St | Young's Roofing, Inc. | reroofingDetails
reroofing | $45,800 |
| Jul 16, 2007 | Never finaled issued Jul 2007, no final | 4475 23rd St | street space permit | ||
| Oct 26, 2006 | Never finaled issued Oct 2006, no final | 4475 23rd St | street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (5), Brighter Bay Builders Inc (3), Axel8 Construction (2), Dabl- Rr Builders Inc (2), Progress Builders (2), Au Electric Corporation/Aec Alarms, Erc Renovation Inc, Markoff Structural Pest Control, Quintanilla Builders Inc, West Coast Premier Construction Inc, Young's Roofing, Inc.
- Engineers
- Joe Win Kon (3), Cristopher Kahanek, Joe Kon
- Authorized agents
- Vincent Hua
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.