Ronny Eugene Gil
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Gil Construction & Assoc Inc.
- Based in
- Millbrae
- On San Francisco permits
- Jan 2000 to Sep 2026
1,317 permits since 2000 (contractor on 1,317 permits, authorized agent-others on 10 permits, designer on 1 permit): 1,171 completed, 18 in progress, 61 never finaled, 67 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 1,317.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 117 Conrad St | Gil Construction & Assoc Inc. | framing and stucco and dry rot damage around newly installed window by others. visable from street.Details
framing and stucco and dry rot damage around newly installed window by others. visable from street. | $6,800 |
| Sep 24, 2026 | In progress issued Sep 2026 | 424 Francisco St | Gil Construction & Assoc Inc. | revision to pa #202609158111. add 34' of retaining with behind existing front retaining wall. new concrete slab below existing front entry stairs.Details
revision to pa #202609158111. add 34' of retaining with behind existing front retaining wall. new concrete slab below existing front entry stairs. | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 4278 Cesar Chavez St | Gil Construction & Assoc Inc. | revise permit 2026-0629-4099 to document the removal of the previously approved basement closet, the addition of a basement level bathroom, and the configuration of previously approved interior stair system along with minor framing and foundation related changes.Details
revise permit 2026-0629-4099 to document the removal of the previously approved basement closet, the addition of a basement level bathroom, and the configuration of previously approved interior stair system along with minor framing and foundation related changes. | |
| Sep 24, 2026 | In progress issued Sep 2026 | 876 Haight St | Gil Construction & Assoc Inc. | repair damaged back stairs less than 50" in kind. not visible from street.Details
repair damaged back stairs less than 50" in kind. not visible from street. | $4,800 |
| Sep 22, 2026 | Completed final sign-off Oct 2026 | 7 Kronquist Ct | Gil Construction & Assoc Inc. | to obtain final inspection for work approved under pa# 202508213583. all work is complete.Details
to obtain final inspection for work approved under pa# 202508213583. all work is complete. | |
| Sep 16, 2026 | In progress issued Sep 2026 | 348 Hazelwood Av | Gil Construction & Assoc Inc. | convert a portion of crawl space and storage space into a den w/ closet. add 1 window facing the street.Details
convert a portion of crawl space and storage space into a den w/ closet. add 1 window facing the street. | $30,000 |
| Sep 15, 2026 | In progress issued Sep 2026 | 424 Francisco St | Gil Construction & Assoc Inc. | voluntary retrofit existing front entry stairs.Details
voluntary retrofit existing front entry stairs. | $40,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 3541 Washington St | Gil Construction & Assoc Inc. | hall bath remodel 10x7. no tub to shower conversions.Details
hall bath remodel 10x7. no tub to shower conversions. | $28,000 |
| Aug 18, 2026 | Completed final sign-off Aug 2026 | 737 Carolina St | Gil Construction & Assoc Inc. | replace sporadic damage @ back. dry rot. tradesman under 50%. all work in kind.Details
replace sporadic damage @ back. dry rot. tradesman under 50%. all work in kind. | $5,200 |
| Jul 14, 2026 | In progress issued Aug 2026 | 930 Noriega St | Gil Construction & Assoc Inc. | replace e) front entry stair in-kind per sfbc 1011.12.3. replace brick stair structure w/ wood framed walls/stucco, concrete foundations, concrete treads. new interior accessibility lift from 1st to 2nd flDetails
replace e) front entry stair in-kind per sfbc 1011.12.3. replace brick stair structure w/ wood framed walls/stucco, concrete foundations, concrete treads. new interior accessibility lift from 1st to 2nd fl | $68,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 4278 Cesar Chavez St | Gil Construction & Assoc Inc. | interior remodel of an (e) residential basement and lv 1 (dining rm, stair hall, and connecting stairs). no change to building footprint or envelope area. no excavation. convert 602 gsf of unconditioned basement to conditioned living space. add (1) 138 sf bedrm & (1) 106 sf bathrm. install (1) new..Details
interior remodel of an (e) residential basement and lv 1 (dining rm, stair hall, and connecting stairs). no change to building footprint or envelope area. no excavation. convert 602 gsf of unconditioned basement to conditioned living space. add (1) 138 sf bedrm & (1) 106 sf bathrm. install (1) new.. | $300,000 |
| Jun 26, 2026 | In progress issued Aug 2026 | 3324 Scott St | Gil Construction & Assoc Inc. | at rear elevation: replace (e) window with sliding door, replace (e) window in kind within the same opening. install 1 (n) window. not visible from street.Details
at rear elevation: replace (e) window with sliding door, replace (e) window in kind within the same opening. install 1 (n) window. not visible from street. | $12,000 |
| Jun 25, 2026 | Completed final sign-off Jul 2026 | 26 St Marys Av | Gil Construction & Assoc Inc. | front stair dry rot repair, less than 50%Details
front stair dry rot repair, less than 50% | $7,000 |
| Jun 16, 2026 | Completed final sign-off Sep 2026 | 9 Sunview Dr | Gil Construction & Assoc Inc. | dry rot on north side, repair framing, stucco sheating and patch roof. approx 16ft, like to like, non-street visible.Details
dry rot on north side, repair framing, stucco sheating and patch roof. approx 16ft, like to like, non-street visible. | $12,000 |
| Jun 9, 2026 | Completed final sign-off Jul 2026 | 2444 Anza St | Gil Construction & Assoc Inc. | back stair repair under 50%Details
back stair repair under 50% | $8,000 |
| Jun 9, 2026 | Completed final sign-off Jul 2026 | 1525 Anza St | Gil Construction & Assoc Inc. | repair front stairs and landing under 50%, back stair repair under 50% - no changes to the existing and proposed materials.Details
repair front stairs and landing under 50%, back stair repair under 50% - no changes to the existing and proposed materials. | $10,000 |
| May 29, 2026 | In progress issued Jun 2026 | 1250 Montgomery St | Gil Construction & Assoc Inc. | replace deck railing, exterior shingles, repair wall screen, enlarge fireplace framing and converting portion of garage into a storage room.Details
replace deck railing, exterior shingles, repair wall screen, enlarge fireplace framing and converting portion of garage into a storage room. | $65,000 |
| May 5, 2026 | Completed final sign-off May 2026 | 4354 23rd St | Gil Construction & Assoc Inc. | rot damage and membrane repairs for mini roof above garage, less than 50% repairs.Details
rot damage and membrane repairs for mini roof above garage, less than 50% repairs. | $9,200 |
| Apr 28, 2026 | In progress issued Apr 2026 | 60 27th Av | Gil Construction & Assoc Inc. | remodel 3 bathrooms like for like. primary 126 sq ft, shared 70 sq ft, family 55 sqft.Details
remodel 3 bathrooms like for like. primary 126 sq ft, shared 70 sq ft, family 55 sqft. | $65,000 |
| Apr 16, 2026 | In progress issued Sep 2026 | 769 Clayton St | Gil Construction & Assoc Inc. | 1. remodel (e) garden apartment. 2. reconfigure/rebuild (e) ground floor deck. 3. reconfigure (e) ground floor garage and utility area to provide dedicated shared laundry. 4. voluntary replacement of portion of (e) perimeter foundation. 5. no work at (e) primary dwelling (second and third floor).Details
1. remodel (e) garden apartment. 2. reconfigure/rebuild (e) ground floor deck. 3. reconfigure (e) ground floor garage and utility area to provide dedicated shared laundry. 4. voluntary replacement of portion of (e) perimeter foundation. 5. no work at (e) primary dwelling (second and third floor). | $150,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 167 21st Av | Markoff Structural Pest Control, Gil Construction & Assoc Inc. | install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest reportDetails
install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest report | $20,000 |
| Apr 2, 2026 | Completed final sign-off Jul 2026 | 461 02nd St | Gil Construction & Assoc Inc. | install new drywall & baseboard. in kind replacement 5/8" type x gyp bd. at front living area due to water damage.Details
install new drywall & baseboard. in kind replacement 5/8" type x gyp bd. at front living area due to water damage. | $15,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 3101 Jackson St | Gil Construction & Assoc Inc. | repair damaged back stairs at 2 areas - less than 50% in kindDetails
repair damaged back stairs at 2 areas - less than 50% in kind | $8,000 |
| Mar 13, 2026 | Expired or cancelled withdrawn Mar 2026 | 3545 Washington St | Gil Construction & Assoc Inc. | renewalDetails
renewal | |
| Feb 6, 2026 | In progress issued Apr 2026 | 139 Edinburgh St | Gil Construction & Assoc Inc. | main floor:kitchen renovation. revision to app#202101253267. 1st and 2nd floor: replacement window at front.Details
main floor:kitchen renovation. revision to app#202101253267. 1st and 2nd floor: replacement window at front. | $35,000 |
| Feb 3, 2026 | Completed final sign-off Mar 2026 | 1362 19th Av | Gil Construction & Assoc Inc. | to obtain final inspection for work approved under 202410152953. all work is completeDetails
to obtain final inspection for work approved under 202410152953. all work is complete | |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 4317 21st St | Gil Construction & Assoc Inc. | remove and replace 6 windows @ back & side not visible from street, same size, location, opening and material. all windows are common area.Details
remove and replace 6 windows @ back & side not visible from street, same size, location, opening and material. all windows are common area. | $18,000 |
| Jan 29, 2026 | Completed final sign-off Feb 2026 | 577 Vallejo St | Gil Construction & Assoc Inc. | repair back 2 stairs less than 50% in kindDetails
repair back 2 stairs less than 50% in kind | $12,000 |
| Jan 20, 2026 | Completed final sign-off Jan 2026 | 345 Moncada Wy | Gil Construction & Assoc Inc. | install approx. 24 5/8" retrofit bolts into (e) foundation/concrete. provide & install new plywood panels 4' high. not street visible.Details
install approx. 24 5/8" retrofit bolts into (e) foundation/concrete. provide & install new plywood panels 4' high. not street visible. | $9,000 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 68 Macondray Ln | Gil Construction & Assoc Inc. | remove sheetrock on both sides of wall to create min. 30-inch minimum clear width opening per nov 2025-34948.Details
remove sheetrock on both sides of wall to create min. 30-inch minimum clear width opening per nov 2025-34948. | $3,500 |
| Dec 16, 2025 | Completed final sign-off May 2026 | 101 Villa Tr | Gil Construction & Assoc Inc. | repair damaged front roof membrane in-kind above garage. not a habitable deck. install new rot iron rail per code.Details
repair damaged front roof membrane in-kind above garage. not a habitable deck. install new rot iron rail per code. | $5,500 |
| Dec 16, 2025 | Completed final sign-off Jan 2026 | 1330 04th Av | Gil Construction & Assoc Inc. | to obtain final inspection for work approved under pa 202310168726. all work is complete.Details
to obtain final inspection for work approved under pa 202310168726. all work is complete. | |
| Dec 9, 2025 | Completed final sign-off Jul 2026 | 68 Mendosa Av | Gil Construction & Assoc Inc. | kitchen and 10x10 master bathroom remodel. all in kind like for like. no wall movement.Details
kitchen and 10x10 master bathroom remodel. all in kind like for like. no wall movement. | $62,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 23 Mirabel Av | Gil Construction & Assoc Inc. | reduce size of decks at 1-3 floors. replace (e) stair run from 3rd floor to 2nd floor with (n) stair run. replace all (n) guardrails with (n). replace (e) decking with (n)Details
reduce size of decks at 1-3 floors. replace (e) stair run from 3rd floor to 2nd floor with (n) stair run. replace all (n) guardrails with (n). replace (e) decking with (n) | $45,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 80 Agua Wy | Golden Heights Remodeling Inc, Gil Construction & Assoc Inc. | non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed.Details
non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed. | $35,000 |
| Nov 20, 2025 | Completed final sign-off Jan 2026 | 326 Ewing Tr | Gil Construction & Assoc Inc. | remove front balcony and repair dry rot at joist and left side. restucco to match existing. reinstall arcitectual balconey with wrot iron to match neighbor style.Details
remove front balcony and repair dry rot at joist and left side. restucco to match existing. reinstall arcitectual balconey with wrot iron to match neighbor style. | $4,800 |
| Oct 23, 2025 | Completed final sign-off Nov 2025 | 62 Vista Verde Ct | Gil Construction & Assoc Inc. | remove entire deck that is pulling away from the house. ref:2025-004487prjDetails
remove entire deck that is pulling away from the house. ref:2025-004487prj | $4,900 |
| Oct 2, 2025 | Completed final sign-off Nov 2025 | 553 Dolores St | Gil Construction & Assoc Inc. | remove & replace (6) front windows in kind, wood clad marvin. 1 rear milgard windowDetails
remove & replace (6) front windows in kind, wood clad marvin. 1 rear milgard window | $12,000 |
| Oct 2, 2025 | Completed final sign-off Nov 2025 | 1081 Noe St | Gil Construction & Assoc Inc. | repair 2 front hand rail posts, and 2 steps dryrotted.Details
repair 2 front hand rail posts, and 2 steps dryrotted. | $3,500 |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 627 Corbett Av | Gil Construction & Assoc Inc. | approx 4 x 4 stucco repair, back of bldg, like for like repair and materials.Details
approx 4 x 4 stucco repair, back of bldg, like for like repair and materials. | $2,000 |
| Sep 10, 2025 | Completed final sign-off May 2026 | 2960 Clement St | Gil Construction & Assoc Inc. | replace 2 beams post and footing at corner of bldgDetails
replace 2 beams post and footing at corner of bldg | $15,000 |
| Sep 10, 2025 | Completed final sign-off Nov 2025 | 110 Carl St | Gil Construction & Assoc Inc. | replace sheet metal roof over 3 bay windows and doorway in kind.Details
replace sheet metal roof over 3 bay windows and doorway in kind. | $10,000 |
| Aug 21, 2025 | Completed final sign-off Jan 2026 | 25 Hidalgo Tr | Gil Construction & Assoc Inc. | remove and replace siding w/hadiplank at back and (2) light wells in-kind. (~1,780 sqft)Details
remove and replace siding w/hadiplank at back and (2) light wells in-kind. (~1,780 sqft) | $26,500 |
| Aug 21, 2025 | Completed final sign-off Oct 2026 | 7 Kronquist Ct | Gil Construction & Assoc Inc. | remodel (2) bathrooms in-kind; 10x6 each.Details
remodel (2) bathrooms in-kind; 10x6 each. | $47,500 |
| Aug 15, 2025 | Completed final sign-off Sep 2025 | 1983 10th Av | Gil Construction & Assoc Inc. | remove & replace (4) patio doors (2) at front & (2) at rear. replace in kindDetails
remove & replace (4) patio doors (2) at front & (2) at rear. replace in kind | $25,000 |
| Aug 1, 2025 | Completed final sign-off Oct 2025 | 40 27th Av | Gil Construction & Assoc Inc. | left side facing house remove and replace 20x25 of stucco, sheath and frame.. not street visible.Details
left side facing house remove and replace 20x25 of stucco, sheath and frame.. not street visible. | $9,500 |
| Jul 15, 2025 | Completed final sign-off Jul 2025 | 51 Prosper St | Gil Construction & Assoc Inc. | revision to pa # 2024-0313-7677. replace 6x 12 beam with psl beam spanning between existing reinforced concrete grade beam.Details
revision to pa # 2024-0313-7677. replace 6x 12 beam with psl beam spanning between existing reinforced concrete grade beam. | |
| Jul 9, 2025 | Completed final sign-off Feb 2026 | 75 Wawona St | Gil Construction & Assoc Inc. | revision to pa # 2024-1223-7281 proposed 3 ft height concrete retaining wall further to rear property line (3ft setback) from east and south property lineDetails
revision to pa # 2024-1223-7281 proposed 3 ft height concrete retaining wall further to rear property line (3ft setback) from east and south property line | $23,000 |
| Jul 3, 2025 | Completed final sign-off Sep 2025 | 1363 41st Av | Gil Construction & Assoc Inc. | dry rot repair around the garage at the front of building. repair like for like street visible.Details
dry rot repair around the garage at the front of building. repair like for like street visible. | $3,100 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 2461 Washington St | Gil Construction & Assoc Inc. | voluntary upgrade of existing brick foundation to new concrete foundationsDetails
voluntary upgrade of existing brick foundation to new concrete foundations | $20,000 |
| Jun 12, 2025 | Expired or cancelled cancelled Jul 2025 | 2223 Beach St | Gil Construction & Assoc Inc. | remove and replace (6) windows at back and sides of building. not visible from street. same size as (e).Details
remove and replace (6) windows at back and sides of building. not visible from street. same size as (e). | $6,500 |
| Jun 12, 2025 | Expired or cancelled cancelled Jul 2025 | 2221 Beach St | Gil Construction & Assoc Inc. | remove and replace (6) windows at back and sides of building. not visible from street. same size as (e).Details
remove and replace (6) windows at back and sides of building. not visible from street. same size as (e). | $6,500 |
| Jun 6, 2025 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | admin permit to revisie 202301200449- per fieldinspector request remove furnace shown in garage to match t-24 report. remove water heater and electric panel installed in mech area/crawl space from garageDetails
admin permit to revisie 202301200449- per fieldinspector request remove furnace shown in garage to match t-24 report. remove water heater and electric panel installed in mech area/crawl space from garage | $2,500 |
| Jun 3, 2025 | Completed final sign-off Jun 2025 | 772 Clayton St | Gil Construction & Assoc Inc. | to obtain final inspection for work aproved under pa 202009033446 and 202109279188. all work is complete.Details
to obtain final inspection for work aproved under pa 202009033446 and 202109279188. all work is complete. | |
| May 22, 2025 | Completed final sign-off Jul 2025 | 1448 Hyde St | Gil Construction & Assoc Inc. | revision to permit #202312212913. replace one window in kind in bathroom. not visible from streetDetails
revision to permit #202312212913. replace one window in kind in bathroom. not visible from street | $600 |
| Apr 29, 2025 | Completed final sign-off Oct 2025 | 40 27th Av | Gil Construction & Assoc Inc. | replace 28 windows a like in kind with new marvin wood clad. located at the front, and side of building. same size, design, operation and locationDetails
replace 28 windows a like in kind with new marvin wood clad. located at the front, and side of building. same size, design, operation and location | $120,000 |
| Apr 3, 2025 | Completed final sign-off Apr 2025 | 448 Douglass St | Gil Construction & Assoc Inc. | replace 5 windows at front of building. same size, replace with marvin wood clad. within existing openings. max u-factor .3.Details
replace 5 windows at front of building. same size, replace with marvin wood clad. within existing openings. max u-factor .3. | $9,800 |
| Mar 17, 2025 | Completed final sign-off May 2025 | 2235 Beach St | Gil Construction & Assoc Inc. | back stair repair, less than 50% repair, in kind.Details
back stair repair, less than 50% repair, in kind. | $4,500 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 327 Moultrie St | Gil Construction & Assoc Inc. | bathroom remodel a like in like - in kind. no wall moving. new toilet, sink, tile, hardware, shower, etc.Details
bathroom remodel a like in like - in kind. no wall moving. new toilet, sink, tile, hardware, shower, etc. | $34,000 |
| Mar 4, 2025 | Completed final sign-off Oct 2025 | 122 Parker Av | Gil Construction & Assoc Inc. | revision to pa#2025-0109-8003. remove elevator between floor 1st and second floors and all associated structural work. reverting space back to storage remaining scope to stay as is.Details
revision to pa#2025-0109-8003. remove elevator between floor 1st and second floors and all associated structural work. reverting space back to storage remaining scope to stay as is. | |
| Mar 3, 2025 | Completed final sign-off Dec 2025 | 1358 Florida St | Gil Construction & Assoc Inc. | replace front door and two street facing windows with new wood clad windows. replace three windows not visible from street a like in kindDetails
replace front door and two street facing windows with new wood clad windows. replace three windows not visible from street a like in kind | $4,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2026 | 3545 Washington St | Gil Construction & Assoc Inc. | remodel/reconfigure and expand (e) kitchen; remodel 2 full baths and 1 powder room; replace (e) windows & rear bedroom with (n) patio doorsDetails
remodel/reconfigure and expand (e) kitchen; remodel 2 full baths and 1 powder room; replace (e) windows & rear bedroom with (n) patio doors | $180,000 |
| Feb 20, 2025 | Completed final sign-off Mar 2026 | 1362 19th Av | Gil Construction & Assoc Inc. | new siding a like in kind at back of building. (rectory/ residence) ref bpa:202410152953Details
new siding a like in kind at back of building. (rectory/ residence) ref bpa:202410152953 | $25,000 |
| Feb 18, 2025 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | revision to pa# 202408229234. repair spliced steel beam at garage. add new hss support and conc footing.Details
revision to pa# 202408229234. repair spliced steel beam at garage. add new hss support and conc footing. | $8,800 |
| Feb 11, 2025 | Completed final sign-off May 2025 | 365 28th St | Gil Construction & Assoc Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $35,000 |
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 45 26th Av | Gil Construction & Assoc Inc. | 1 bathroom remodel in kind. no walls moving. new tiles, shower, vanity, etc. no change in plumbing fixture count.Details
1 bathroom remodel in kind. no walls moving. new tiles, shower, vanity, etc. no change in plumbing fixture count. | $35,000 |
| Jan 14, 2025 | Completed final sign-off Jan 2025 | 3238 Harrison St | Gil Construction & Assoc Inc. | revision to permit 202412036045. repair/replace rotten partition and footing.Details
revision to permit 202412036045. repair/replace rotten partition and footing. | |
| Jan 10, 2025 | Completed final sign-off Feb 2025 | 143 Monterey Bl | Gil Construction & Assoc Inc. | sporadic damage to back of building. replace with new hardy plank siding 25x20 ft. install new patio door. (not visible from street).Details
sporadic damage to back of building. replace with new hardy plank siding 25x20 ft. install new patio door. (not visible from street). | $14,000 |
| Jan 10, 2025 | Completed final sign-off Feb 2025 | 1539 29th Av | Gil Construction & Assoc Inc. | sporadic damage to front bay. open stucco, repair a like in kindDetails
sporadic damage to front bay. open stucco, repair a like in kind | $5,200 |
| Jan 9, 2025 | Completed final sign-off Oct 2025 | 122 Parker Av | Gil Construction & Assoc Inc. | install new elevator btw 1st & 2nd fls. add new bathroom at 1st fl. relocate & remodel e) water closet & laundry at 1st/f. replace 1 window at 2nd/f at rear & 2 window at side in e) openings. not visible from stDetails
install new elevator btw 1st & 2nd fls. add new bathroom at 1st fl. relocate & remodel e) water closet & laundry at 1st/f. replace 1 window at 2nd/f at rear & 2 window at side in e) openings. not visible from st | $165,000 |
| Jan 2, 2025 | Completed final sign-off Mar 2025 | 178 Ewing Tr | Gil Construction & Assoc Inc. | dry rot repair through out front of building. repair in kind. approx 200 sqftDetails
dry rot repair through out front of building. repair in kind. approx 200 sqft | $14,500 |
| Dec 23, 2024 | Completed final sign-off Feb 2026 | 75 Wawona St | Gil Construction & Assoc Inc. | 1st fl. convert (e) storage space into conditiond space bedrom, 2 bathrooms. 2nd fl: new wood staircase to connect first and sencond fl. replacement foundation, excavate 6" for additional heightDetails
1st fl. convert (e) storage space into conditiond space bedrom, 2 bathrooms. 2nd fl: new wood staircase to connect first and sencond fl. replacement foundation, excavate 6" for additional height | $50,000 |
| Dec 19, 2024 | Completed final sign-off Jan 2025 | 1 Romain St | Gil Construction & Assoc Inc. | replace 7 existing windows with new marvin wood clad windows. same size and type as existing. all street facing.Details
replace 7 existing windows with new marvin wood clad windows. same size and type as existing. all street facing. | $15,000 |
| Dec 19, 2024 | Completed final sign-off Apr 2025 | 1570 47th Av | Gil Construction & Assoc Inc. | bathroom remodel. remodel a like for like. new tile, vanity, toilet, fixture ext.Details
bathroom remodel. remodel a like for like. new tile, vanity, toilet, fixture ext. | $35,000 |
| Dec 4, 2024 | Completed final sign-off Apr 2025 | 143 Chilton Av | Gil Construction & Assoc Inc. | revision to permit# 202408198966: in kind framing repair at floors. replace floor joist in kitchen and bathroom same size, like in kindDetails
revision to permit# 202408198966: in kind framing repair at floors. replace floor joist in kitchen and bathroom same size, like in kind | $3,500 |
| Dec 3, 2024 | Completed final sign-off Jan 2025 | 3238 Harrison St | Gil Construction & Assoc Inc. | remove (e) non complaints deck and stairs, replace w/ (n) landing and stairs.Details
remove (e) non complaints deck and stairs, replace w/ (n) landing and stairs. | $5,000 |
| Nov 25, 2024 | Completed final sign-off May 2025 | 2235 Beach St | Gil Construction & Assoc Inc. | to obtan fina inspection for work approved under pa#202212138197. all work is complete.Details
to obtan fina inspection for work approved under pa#202212138197. all work is complete. | |
| Nov 19, 2024 | Completed final sign-off Mar 2025 | 41 Merced Av | Gil Construction & Assoc Inc. | bathroom remodel. no walls of fixtures moving. remdel like in kind. new tiles, vanity, shower, toilet, etc.Details
bathroom remodel. no walls of fixtures moving. remdel like in kind. new tiles, vanity, shower, toilet, etc. | $35,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2025 | 141 Buchanan St | Gil Construction & Assoc Inc. | replace 1 window at side of building not visible from street. replace 20 linal ft of siding at side of building and 12x20ft of hardy plank siding at back. replace 1 dmaged step tred. all work a like in kind not street visible from street.Details
replace 1 window at side of building not visible from street. replace 20 linal ft of siding at side of building and 12x20ft of hardy plank siding at back. replace 1 dmaged step tred. all work a like in kind not street visible from street. | $8,700 |
| Nov 8, 2024 | Completed final sign-off Feb 2025 | 2103 Bush St | Gil Construction & Assoc Inc. | sporadic damage to back of building. not visible from the street. remove siding and replace with new hardy plank. new flashing around doors and windows area of siding approx 408 sqft. replace two french doors a like in kind.Details
sporadic damage to back of building. not visible from the street. remove siding and replace with new hardy plank. new flashing around doors and windows area of siding approx 408 sqft. replace two french doors a like in kind. | $18,000 |
| Oct 15, 2024 | Completed final sign-off Dec 2024 | 30 Parkridge Dr | Gil Construction & Assoc Inc. | replce 3 windows a like in kind and same size as existing. all windows to be fiberglass sliding windows. 2 windows are street facing.max u-factor 0.30.Details
replce 3 windows a like in kind and same size as existing. all windows to be fiberglass sliding windows. 2 windows are street facing.max u-factor 0.30. | $5,000 |
| Oct 15, 2024 | Expired or cancelled expired Mar 2026 | 1362 19th Av | Gil Construction & Assoc Inc. | repair front stairs a like in-kind, less than 50% repair. dry rot repair to back of buiding 100sf. interior sheetrock work repir. remodel small bathroom like in-kind. no walls or fixtures moving. new tilet, toilet, vanity shower etc new fixtures. work at rectory/residence.Details
repair front stairs a like in-kind, less than 50% repair. dry rot repair to back of buiding 100sf. interior sheetrock work repir. remodel small bathroom like in-kind. no walls or fixtures moving. new tilet, toilet, vanity shower etc new fixtures. work at rectory/residence. | $83,000 |
| Oct 15, 2024 | Completed final sign-off Oct 2024 | 810 Douglass St | Gil Construction & Assoc Inc. | replace 2 windows not visible from street. same size, same location, max u-factor 0.30.Details
replace 2 windows not visible from street. same size, same location, max u-factor 0.30. | $2,100 |
| Oct 15, 2024 | Completed final sign-off Nov 2024 | 5 Mars St | Gil Construction & Assoc Inc. | replace 6 front facing windows a like in kind. same size and operation as (e). wood clad with og lugs. max u-factor 0.30.Details
replace 6 front facing windows a like in kind. same size and operation as (e). wood clad with og lugs. max u-factor 0.30. | $10,000 |
| Oct 7, 2024 | Completed final sign-off Feb 2025 | 269 South Van Ness Av | Gil Construction & Assoc Inc. | rev 202405031366: field structural revisions.replace all parking platform frming joists with 2-2x10 15 16in oc.replce center posts.document cantilevered floor framing. strengthen base of fence wall at south prop line.Details
rev 202405031366: field structural revisions.replace all parking platform frming joists with 2-2x10 15 16in oc.replce center posts.document cantilevered floor framing. strengthen base of fence wall at south prop line. | $9,000 |
| Sep 27, 2024 | Completed final sign-off Nov 2024 | 105 San Jose Av | Gil Construction & Assoc Inc. | new hardi plank at back of buiding not visible from street. area of work 400sf. common area.Details
new hardi plank at back of buiding not visible from street. area of work 400sf. common area. | $17,000 |
| Sep 27, 2024 | In progress issued Sep 2024 | 2642 Hyde St | Gil Construction & Assoc Inc. | repair back balcony. less than 50%. repair a like in-kind.Details
repair back balcony. less than 50%. repair a like in-kind. | $1,500 |
| Sep 12, 2024 | Completed final sign-off Oct 2024 | 79 Chattanooga St | Gil Construction & Assoc Inc. | fire damage to detached back garage. remove and replace damaged sheetrock and shingles. not visible from street. repair like in kind. area of work on east side approx 9' wide 11' tall and south side approx 8' wide and 11' tall.Details
fire damage to detached back garage. remove and replace damaged sheetrock and shingles. not visible from street. repair like in kind. area of work on east side approx 9' wide 11' tall and south side approx 8' wide and 11' tall. | $14,500 |
| Sep 12, 2024 | Completed final sign-off Oct 2024 | 83 Melrose Av | Gil Construction & Assoc Inc. | new membrane to back deck, not visible from the street . new timber tech decking material. deck size approx 12x20. repair less than 50%Details
new membrane to back deck, not visible from the street . new timber tech decking material. deck size approx 12x20. repair less than 50% | $8,000 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 2810 Diamond St | Gil Construction & Assoc Inc. | rev 202406184738- per inspector request plans for repair to rear stairs with (n) wood frammed structural posts (3) total, stringers and guardrail. stair is visible from chernery street. in kind. 60 ft of stair areaDetails
rev 202406184738- per inspector request plans for repair to rear stairs with (n) wood frammed structural posts (3) total, stringers and guardrail. stair is visible from chernery street. in kind. 60 ft of stair area | $11,000 |
| Aug 22, 2024 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | reduce sq footage of roof deck to be 410 sq ft completed under pa 201806141935. deck material to be wood compliant with fs-01. revision to pa 202301200449 dimension of door & window at ground level of facade to comply with nov #202418140Details
reduce sq footage of roof deck to be 410 sq ft completed under pa 201806141935. deck material to be wood compliant with fs-01. revision to pa 202301200449 dimension of door & window at ground level of facade to comply with nov #202418140 | |
| Aug 20, 2024 | Completed final sign-off Nov 2024 | 365 28th St | Gil Construction & Assoc Inc. | revision to pa# 202406184740. replace 2 doors at roof deck, not visible from street, in-kind. sporadic damage found at some framing around windows at front. repair damaged framing at base of bay window and upper right corner, in-kind, at front. repair stucco in kind, approx. 50 sq ft.Details
revision to pa# 202406184740. replace 2 doors at roof deck, not visible from street, in-kind. sporadic damage found at some framing around windows at front. repair damaged framing at base of bay window and upper right corner, in-kind, at front. repair stucco in kind, approx. 50 sq ft. | $8,800 |
| Aug 20, 2024 | Completed final sign-off Oct 2024 | 167 States St | Gil Construction & Assoc Inc. | damage found to upper & lower deck and stairs. repair decks and stairs in-kind less than 50%. all work at rear. not visible from street.Details
damage found to upper & lower deck and stairs. repair decks and stairs in-kind less than 50%. all work at rear. not visible from street. | $15,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2025 | 143 Chilton Av | Gil Construction & Assoc Inc. | in kind kitchen remodel: flooring, walls, cabinets, appliances & window (non st visible). bath remodel: flooring,walls, windows,fixtures, shower in lieu of tub,new laundry area adjacent to the bathroom, new electrical tankless water heater next to laundry,new elec panel 100 to 200amp.Details
in kind kitchen remodel: flooring, walls, cabinets, appliances & window (non st visible). bath remodel: flooring,walls, windows,fixtures, shower in lieu of tub,new laundry area adjacent to the bathroom, new electrical tankless water heater next to laundry,new elec panel 100 to 200amp. | $75,000 |
| Aug 9, 2024 | Completed final sign-off Aug 2024 | 11 Gladstone Dr | Gil Construction & Assoc Inc. | replace 4 windows. 2 windows at front of building. 2 at back. windows will be alike in kind. all windows will be marvin aluminum wood clad. front windows to be sliders, no horizontal division.Details
replace 4 windows. 2 windows at front of building. 2 at back. windows will be alike in kind. all windows will be marvin aluminum wood clad. front windows to be sliders, no horizontal division. | $10,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 71 Sanchez St | Gil Construction & Assoc Inc. | replace three street facing windows in-kind with aluminum clad wood casement and double hung windows.Details
replace three street facing windows in-kind with aluminum clad wood casement and double hung windows. | $13,000 |
| Aug 1, 2024 | Completed final sign-off Mar 2025 | 1250 Montgomery St | Gil Construction & Assoc Inc. | new membraine at back of terra-cotta deck. a like in-kind. not visible from street.Details
new membraine at back of terra-cotta deck. a like in-kind. not visible from street. | $20,000 |
| Jul 11, 2024 | Completed final sign-off Sep 2024 | 1220 47th Av | Gil Construction & Assoc Inc. | replace damaged siding through back of building, approx. 800 sq ft. sporadic damage to framing, repair damage a like in kind.Details
replace damaged siding through back of building, approx. 800 sq ft. sporadic damage to framing, repair damage a like in kind. | $48,000 |
| Jul 9, 2024 | Completed final sign-off Oct 2024 | 1307 05th Av | Gil Construction & Assoc Inc. | back exterior stair repair, less than 50% repair. repair stairs a like in-kind. remove existing siding and replace withnew hardy plank siding at back of building only, not visible from street. 3 exterior walls. approx. 540 sq ft.Details
back exterior stair repair, less than 50% repair. repair stairs a like in-kind. remove existing siding and replace withnew hardy plank siding at back of building only, not visible from street. 3 exterior walls. approx. 540 sq ft. | $48,000 |
| Jun 20, 2024 | Completed final sign-off Aug 2024 | 4165 23rd St | Gil Construction & Assoc Inc. | new hardi plank siding at back of building. approx 13'-6" wide 3' tallDetails
new hardi plank siding at back of building. approx 13'-6" wide 3' tall | $12,000 |