Kiryl Lis
- Listed as
- authorized agent-others, contractor
- Firm
- Invertice Inc
- Based in
- Huntingdon Valley
- On San Francisco permits
- Jan 2022 to Apr 2026
11 permits since 2000 (contractor on 11 permits, authorized agent-others on 1 permit): 9 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Apr 2026 | 6221 Geary Bl | Invertice Inc | to obtain final inspection for work approved under pa 202209263093. all work is complete.Details
to obtain final inspection for work approved under pa 202209263093. all work is complete. | |
| Sep 26, 2022 | Never finaled issued Oct 2022, no final | 6221 Geary Bl | Invertice Inc | at&t modification of an unmanned telecom facility consisting of remove & replace (6) antennas, relocate (3) antennas, install(4) (n) frp boxes (a&c) install (n) rf safety signs barricades & stripping @ roof; r/r (16) lead acid batteries in (e) cabinets, install (4) rectifiers in (e) dcpp rack &Details
at&t modification of an unmanned telecom facility consisting of remove & replace (6) antennas, relocate (3) antennas, install(4) (n) frp boxes (a&c) install (n) rf safety signs barricades & stripping @ roof; r/r (16) lead acid batteries in (e) cabinets, install (4) rectifiers in (e) dcpp rack & | $65,000 |
| Jun 23, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Invertice Inc, Metropolitan Electrical Construction | at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack.Details
at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack. | $65,000 |
| May 16, 2022 | Completed final sign-off Apr 2024 | 2550 Sloat Bl | Invertice Inc | at&t modification of an (e) telecom facility consisting remove and replace (6) antennas within (e) radomes, remove (6) rru's add install (3) new rru's; install new rp safety ing & stripping on rooftop, install (1) new rectifier in (e) dcpp cabinetDetails
at&t modification of an (e) telecom facility consisting remove and replace (6) antennas within (e) radomes, remove (6) rru's add install (3) new rru's; install new rp safety ing & stripping on rooftop, install (1) new rectifier in (e) dcpp cabinet | $25,000 |
| Mar 24, 2022 | Completed final sign-off Apr 2024 | 1881 Post St | Invertice Inc | at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack.Details
at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack. | $65,000 |
| Mar 3, 2022 | Completed final sign-off May 2024 | 930 Montgomery St | Invertice Inc | at&t: modification of an unmanned telecom facility. remove & replace 6 antennas. install rf safety signs, secure barricade & stripping on roof. install 1 (n) 6648 bbu/mux in (e) purcell cabinet.Details
at&t: modification of an unmanned telecom facility. remove & replace 6 antennas. install rf safety signs, secure barricade & stripping on roof. install 1 (n) 6648 bbu/mux in (e) purcell cabinet. | $45,000 |
| Feb 24, 2022 | Completed final sign-off Nov 2024 | 562 Market St | Invertice Inc, Metropolitan Electrical Construction | at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) rectiDetails
at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) recti | $45,000 |
| Feb 24, 2022 | Completed final sign-off Aug 2024 | 4216 California St | Invertice Inc | at&t: modification to an unmanned telecommuncations facility consising of: removing (6) panel antennas + install (6) new panel anthennas. remove (3)remote radio unit (rru). relocate (3) rru. install new rf safety signs, barriers & stripping on rooftop. intall (1) new 6648 bbu within existing rack.Details
at&t: modification to an unmanned telecommuncations facility consising of: removing (6) panel antennas + install (6) new panel anthennas. remove (3)remote radio unit (rru). relocate (3) rru. install new rf safety signs, barriers & stripping on rooftop. intall (1) new 6648 bbu within existing rack. | $40,000 |
| Feb 10, 2022 | Completed final sign-off Apr 2024 | 114 07th St | Invertice Inc | at&t: remove + replace 12 antennas. remove 4 (e) rrus 11b12. remove 4 rrus b5. install 4 rrus 4449 b5/b12. 4 dc6 squids. 4 #6 awg dc power trunks. (n) rf safety signs, barriers + stripping on rooftop. 3 rectifiers in (e) dcpp cabinet. 1 dc12 box.Details
at&t: remove + replace 12 antennas. remove 4 (e) rrus 11b12. remove 4 rrus b5. install 4 rrus 4449 b5/b12. 4 dc6 squids. 4 #6 awg dc power trunks. (n) rf safety signs, barriers + stripping on rooftop. 3 rectifiers in (e) dcpp cabinet. 1 dc12 box. | $65,000 |
| Feb 10, 2022 | Completed final sign-off Aug 2024 | 350 Judah St | Invertice Inc | at&t: modification of an unnamed telecommunications facility: remove+ replace 6 panel antennas. 1 (n) 12" pipe to pipe extension. 1 (n) dc 9 box, 1 dc power trunk, 1 fiber trunk. remove (e) power plant & install (n) 7100 dc power plant. 12 (n) rectifiers, 1 (n) battery puck. 1 (n) 6648 baseband unitDetails
at&t: modification of an unnamed telecommunications facility: remove+ replace 6 panel antennas. 1 (n) 12" pipe to pipe extension. 1 (n) dc 9 box, 1 dc power trunk, 1 fiber trunk. remove (e) power plant & install (n) 7100 dc power plant. 12 (n) rectifiers, 1 (n) battery puck. 1 (n) 6648 baseband unit | $45,000 |
| Jan 11, 2022 | Completed final sign-off May 2024 | 589 Howard St | Invertice Inc, Electric Tech Construction Inc | roof - unmanned cell site mod: r/r 2 panel antennas per sector (6 total). reloc 1 (e) antenna per sector (3 total). remove 3 rrus 11b12 and repl with 3 rru & 4478b12a. install (n) radomes to enclose antennas (9).install 4 rectifers in (e) dc power plan. 1 (n) 6648 bbu in (e) rack.Details
roof - unmanned cell site mod: r/r 2 panel antennas per sector (6 total). reloc 1 (e) antenna per sector (3 total). remove 3 rrus 11b12 and repl with 3 rru & 4478b12a. install (n) radomes to enclose antennas (9).install 4 rectifers in (e) dc power plan. 1 (n) 6648 bbu in (e) rack. | $85,000 |