Block 1364, lot 019
4216 California St
- City’s use
- Commercial Retail
- Built
- 1976
- Stories
- 3
- Units
- 6
- Rooms
- 5 bathrooms
- Building
- 5,421 sq ft
- Lot
- 2,186 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Aug 2024 | 4216 California St | Invertice Inc | at&t: modification to an unmanned telecommuncations facility consising of: removing (6) panel antennas + install (6) new panel anthennas. remove (3)remote radio unit (rru). relocate (3) rru. install new rf safety signs, barriers & stripping on rooftop. intall (1) new 6648 bbu within existing rack.Details
at&t: modification to an unmanned telecommuncations facility consising of: removing (6) panel antennas + install (6) new panel anthennas. remove (3)remote radio unit (rru). relocate (3) rru. install new rf safety signs, barriers & stripping on rooftop. intall (1) new 6648 bbu within existing rack. | $40,000 |
| Mar 23, 2021 | Never finaled filed Mar 2021, never issued | 4216 California St | convert (4) commercial units into (2) residential units on the 2nd & 3rd floor.Details
convert (4) commercial units into (2) residential units on the 2nd & 3rd floor. | $100,000 | |
| Sep 3, 2020 | Completed final sign-off Feb 2021 | 4216 California St | Ericsson Inc Dba E U S Inc | at&t proposes to modify an existing facility as follows:- remove and replace (3) antennas- remove (3) rru's and install (3) rru's- install (3) dc-9 surge suppressors, (6) dc power trunks, (3) dc fiber trunks @ shelter:- install (1) dc-12 unit, (1) 6630 baseband, (4)gs battieriesDetails
at&t proposes to modify an existing facility as follows:- remove and replace (3) antennas- remove (3) rru's and install (3) rru's- install (3) dc-9 surge suppressors, (6) dc power trunks, (3) dc fiber trunks @ shelter:- install (1) dc-12 unit, (1) 6630 baseband, (4)gs battieries | $22,000 |
| Oct 10, 2018 | Completed final sign-off Nov 2019 | 4216 California St | Metropolitan Electrical Construction | att - modification: r&r 9 (e) antennas with 9 new antennas. install 9 new rrus, install other small equip. no change to batteriesDetails
att - modification: r&r 9 (e) antennas with 9 new antennas. install 9 new rrus, install other small equip. no change to batteries | $45,000 |
| Apr 4, 2016 | Completed final sign-off Apr 2016 | 4216 California St | respond to comply w/201323233 - document & legalize discrepancies between ground floor configuration as built in 1976 on rear propery line with no rear yard & the configuration as approved under pa #454995. no work to be done with this permit.Details
respond to comply w/201323233 - document & legalize discrepancies between ground floor configuration as built in 1976 on rear propery line with no rear yard & the configuration as approved under pa #454995. no work to be done with this permit. | ||
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 4216 California St | street spaceDetails
street space | ||
| Oct 9, 2013 | Never finaled issued Oct 2013, no final | 4216 California St | street spaceDetails
street space | ||
| Sep 13, 2013 | Completed final sign-off Sep 2014 | 4216 California St | Metropolitan Electrical Construction | a modification to an (e) unmanned telecommunication facility consisting of removal 2 (e) omni antenna & installation 2 new frp screen with 9 new at & t antenna, 15 rrh's & 6 new surge suppressors. design & paint frp screens to match.Details
a modification to an (e) unmanned telecommunication facility consisting of removal 2 (e) omni antenna & installation 2 new frp screen with 9 new at & t antenna, 15 rrh's & 6 new surge suppressors. design & paint frp screens to match. | $25,000 |
| May 2, 2013 | Completed final sign-off Sep 2014 | 4216 California St | Metropolitan Electrical Construction | to comply with nov 201122281-remove equipment from the rooftop and add new equipment on the ground level.Details
to comply with nov 201122281-remove equipment from the rooftop and add new equipment on the ground level. | $15,000 |
| Mar 21, 2005 | Completed final sign-off Mar 2006 | 4216 California St | Metropolitan Electrical Construction | installation of (n0 cinbgular wireless telecommunications facility, including: ommi anteanas & microDetails
installation of (n0 cinbgular wireless telecommunications facility, including: ommi anteanas & micro | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Metropolitan Electrical Construction (4), Ericsson Inc Dba E U S Inc, Invertice Inc
- Architects
- Streamline Engineering
- Engineers
- Chris Lee, James Spore, Peter Sung, Ryan Mcdaniel
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.