Lisa Wong
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Lisa Wong Architect
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Oct 2026
263 permits since 2000 (architect on 239 permits, designer on 10 permits, authorized agent-others on 7 permits, engineer on 6 permits, pmt consultant/expediter on 2 permits): 187 completed, 12 in progress, 26 never finaled, 38 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 263.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 465 Harkness Av | fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades.Details
fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades. | $80,000 | |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 2042 34th Av | remodel kitchen. remove wall for open plan. reconfigure existing 2nd flr. bath+closets. add 7x12 bath with 67 sqft. develop basement rooms. bedroom. media room, full bath, closet, new entry, maintain 22' long ladder access from street to year for fire dept. lower site in front of windows forDetails
remodel kitchen. remove wall for open plan. reconfigure existing 2nd flr. bath+closets. add 7x12 bath with 67 sqft. develop basement rooms. bedroom. media room, full bath, closet, new entry, maintain 22' long ladder access from street to year for fire dept. lower site in front of windows for | $139,637 | |
| Aug 16, 2026 | In progress filed Aug 2026, not yet issued | 310 29th Av | convert (e) rooms down to 2nd unit. add a kitchen, new exist corridor to street. replace (e) windows and patio doors in-kind not visit from street. no excavations. no major strutcural work. mep upgrades as needed.Details
convert (e) rooms down to 2nd unit. add a kitchen, new exist corridor to street. replace (e) windows and patio doors in-kind not visit from street. no excavations. no major strutcural work. mep upgrades as needed. | $50,000 | |
| Jul 21, 2026 | In progress issued Jul 2026 | 40 Rockwood Ct | R P Construction Inc. | remodel existing bath at upper floor. no wall removal. no exterior work. general mep updates.Details
remodel existing bath at upper floor. no wall removal. no exterior work. general mep updates. | $25,000 |
| Jun 5, 2026 | Completed final sign-off Sep 2026 | 2314 43rd Av | R P Construction Inc. | add 37.5 sqft bathroom (1)garage for convenience. add new(18"x36" window for ventilation. no structural work. no footprint changes, no foundation work. general mep upgrades as needed.Details
add 37.5 sqft bathroom (1)garage for convenience. add new(18"x36" window for ventilation. no structural work. no footprint changes, no foundation work. general mep upgrades as needed. | $28,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 1538 Clay St | Hang C Construction Inc | replace fascia stone with 2" thick similar material -and painted to replicate existing stone. exterior in-kind only.Details
replace fascia stone with 2" thick similar material -and painted to replicate existing stone. exterior in-kind only. | $8,600 |
| Dec 18, 2025 | In progress issued Dec 2025 | 39 Gladeview Wy | revision to pa #2025-0320-2622: to enclose left garage door and install new window. relocate kitchen at ground floor.Details
revision to pa #2025-0320-2622: to enclose left garage door and install new window. relocate kitchen at ground floor. | $2,500 | |
| Dec 12, 2025 | Completed final sign-off Feb 2026 | 541 15th Av | to correct nov #202546682. relocation of (e) rear stairs at the backyardDetails
to correct nov #202546682. relocation of (e) rear stairs at the backyard | $1,600 | |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 2246 47th Av | R P Construction Inc. | rev 202504285306: legalize (e) bar sink on g/f family/guest bedroom.Details
rev 202504285306: legalize (e) bar sink on g/f family/guest bedroom. | |
| Jun 26, 2025 | In progress issued Aug 2025 | 465 Harkness Av | Level 8 Construction Inc | remodel (e) kitchen, open to living room. remodel 2nd fl bath; add family room, new bath & a media room on 1st fl; change windows not visible from street. add 1 column & new footing @ garage. general mep upgradesDetails
remodel (e) kitchen, open to living room. remodel 2nd fl bath; add family room, new bath & a media room on 1st fl; change windows not visible from street. add 1 column & new footing @ garage. general mep upgrades | $170,000 |
| May 14, 2025 | In progress issued Jul 2025 | 626 40th Av | Hang C Construction Inc | remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgradesDetails
remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgrades | $185,000 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 2246 47th Av | R P Construction Inc. | convert e storage rm on gr fl to family guest bedroom. legalize e bath. add new 1 hr. fire rated exit corridor from yard to street. change 1 window escape type. relocate furnace and laundry. no structural changes, general mep upgrades.Details
convert e storage rm on gr fl to family guest bedroom. legalize e bath. add new 1 hr. fire rated exit corridor from yard to street. change 1 window escape type. relocate furnace and laundry. no structural changes, general mep upgrades. | $80,392 |
| Mar 20, 2025 | In progress issued Jun 2025 | 39 Gladeview Wy | Haoxuan Construction, Shek's Construction Co | relocate kitchen, living & dining rooms to 1st fl. leave 1 car garage space, 4 bedrooms, 3 baths, laundry room on 2nd fl. add a master bath. reconfigure interior stairs to 1st fl. relocate 2 columns, add new beams at 1st fl. general mep upgrade & structural strengtheningDetails
relocate kitchen, living & dining rooms to 1st fl. leave 1 car garage space, 4 bedrooms, 3 baths, laundry room on 2nd fl. add a master bath. reconfigure interior stairs to 1st fl. relocate 2 columns, add new beams at 1st fl. general mep upgrade & structural strengthening | $169,000 |
| Jan 24, 2025 | Completed final sign-off Nov 2025 | 2451 26th Av | Ayala Builder's And Company Inc | 3rd/fl: add master bathroom in master bedroom on 3rd floor. remodel (e) bath on 3rd floor. no change to bldg. envelope. no change to structure/bearing. no window changes. mechanical,electrical and plumbing upgrades as needed.Details
3rd/fl: add master bathroom in master bedroom on 3rd floor. remodel (e) bath on 3rd floor. no change to bldg. envelope. no change to structure/bearing. no window changes. mechanical,electrical and plumbing upgrades as needed. | $50,000 |
| Jul 27, 2024 | Completed final sign-off Aug 2025 | 743 Green St | pop up shed dormer @ rear of front bldg house, 30 sf add roof deck over new dormer and part of (e) flat roof,260 sf add railings. new interior access stairs to roof deck.remove 36sf of(e)skylights ,add 2 new windows, 22 s.f. net total 14 sf of new window. 433 sf new habitable space,no mep changes.Details
pop up shed dormer @ rear of front bldg house, 30 sf add roof deck over new dormer and part of (e) flat roof,260 sf add railings. new interior access stairs to roof deck.remove 36sf of(e)skylights ,add 2 new windows, 22 s.f. net total 14 sf of new window. 433 sf new habitable space,no mep changes. | $30,000 | |
| Jul 22, 2024 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | Bayview Renovation & Development, Inc. | revision to pa# 202310259466: extend (e) perimeter footing by adding concrete to (e\) footing from the front with rebars and adding concrete to bottom rather than connecting rebars to concrete from below (e) footings. location on north wall. extension of footings mainly for waterproofing.Details
revision to pa# 202310259466: extend (e) perimeter footing by adding concrete to (e\) footing from the front with rebars and adding concrete to bottom rather than connecting rebars to concrete from below (e) footings. location on north wall. extension of footings mainly for waterproofing. | |
| Jun 13, 2024 | Completed final sign-off May 2025 | 817 32nd Av | new ground floor:accessory rooms: permit 2 bedrooms, 1 full bath previously undocumented. add 1 new family room. add plywood panels for strengthening at 1st fl. new 9'-0" header beam at kitchen to dining on 2nd fl. plywood around opening for strenghening. change windows not visible from street.Details
new ground floor:accessory rooms: permit 2 bedrooms, 1 full bath previously undocumented. add 1 new family room. add plywood panels for strengthening at 1st fl. new 9'-0" header beam at kitchen to dining on 2nd fl. plywood around opening for strenghening. change windows not visible from street. | $81,500 | |
| May 28, 2024 | Completed final sign-off Jan 2025 | 969 Wisconsin St | R P Construction Inc. | remodel upper unit kitchen. open 2 walls, add new beams, add plywood panels to (e) adjacent walls. remove lav sink @ laundry area. add new cabinets for panty. add new sink in toilet room, change exterior door in kind not visible from street. general mep upgrades.Details
remodel upper unit kitchen. open 2 walls, add new beams, add plywood panels to (e) adjacent walls. remove lav sink @ laundry area. add new cabinets for panty. add new sink in toilet room, change exterior door in kind not visible from street. general mep upgrades. | $78,000 |
| May 7, 2024 | Completed final sign-off Aug 2025 | 131 Marston Av | Voolix Construction | remodel 1st fl kitchen. open wall, add columns & beam; open wall between living room & dining room; add full bath, change windows not visisble from street. general bolting of (e) foundation as needed. general mep upgradesDetails
remodel 1st fl kitchen. open wall, add columns & beam; open wall between living room & dining room; add full bath, change windows not visisble from street. general bolting of (e) foundation as needed. general mep upgrades | $64,000 |
| Mar 14, 2024 | Completed final sign-off Dec 2024 | 601 Jackson St | Paradise Construction | replace 4 penthouse anodized alm. gl. with anodized alum. gl. windows match adjacent extg windows finishes & sill hts. windows not visible from street. no change to extg egress. no structural changes, no header changes. replace extg tapered insul. & roofing membrane at 4th floor roof (5th fl).Details
replace 4 penthouse anodized alm. gl. with anodized alum. gl. windows match adjacent extg windows finishes & sill hts. windows not visible from street. no change to extg egress. no structural changes, no header changes. replace extg tapered insul. & roofing membrane at 4th floor roof (5th fl). | $14,000 |
| Mar 5, 2024 | In progress issued Jun 2024 | 1466 Waller St | Matthew P Leffers | to document the relocation of units 1468a and 1470a to ground floor; expansion of 1470 and 1468 into entire 4th and 3rd floor and reduction of 1466 on 2nd flr stair to 1st floor unwarrented space; no change to unit count or occupancy. dpw minor encroachment permit req. under separte permit due toDetails
to document the relocation of units 1468a and 1470a to ground floor; expansion of 1470 and 1468 into entire 4th and 3rd floor and reduction of 1466 on 2nd flr stair to 1st floor unwarrented space; no change to unit count or occupancy. dpw minor encroachment permit req. under separte permit due to | $5,000 |
| Feb 20, 2024 | Completed final sign-off Sep 2024 | 1921 17th Av | Keaveney Construction | develop group fl rooms for family room, office room, master bedroom & full bath. remove non load bearing paritions. no bearing wall structural changes. concrete slab to remain. provide sleeper floor & strengthen w/ voluntary plywood. 2 holddowns & new concrete footings.Details
develop group fl rooms for family room, office room, master bedroom & full bath. remove non load bearing paritions. no bearing wall structural changes. concrete slab to remain. provide sleeper floor & strengthen w/ voluntary plywood. 2 holddowns & new concrete footings. | $68,000 |
| Feb 20, 2024 | Completed final sign-off Mar 2024 | 200 Leavenworth St | legalize (e) sign and comply with planning enforcement case no. 2023-009504 enf. to comply with amnesty program.Details
legalize (e) sign and comply with planning enforcement case no. 2023-009504 enf. to comply with amnesty program. | $200 | |
| Jan 16, 2024 | Completed final sign-off Oct 2024 | 1566 20th Av | R P Construction Inc. | develop ground fl rooms for den, mudroom, full bath, maintain laundry room, add partitions, no structural changes. repair concrete slab as needed. provide sleeper floors where possible. shear wealls at new space. insulate walls and ceiling. general mep upgrades.Details
develop ground fl rooms for den, mudroom, full bath, maintain laundry room, add partitions, no structural changes. repair concrete slab as needed. provide sleeper floors where possible. shear wealls at new space. insulate walls and ceiling. general mep upgrades. | $110,000 |
| Dec 12, 2023 | In progress issued Oct 2024 | 139 Glenview Dr | Green World Construction Inc | remodel 2/f kitchen, open 1-wall, add rooms on ground flr, 1-study room (not for sleeping), 1-bath, 1-family room, add small deck and stair to rear yard. general mep upgrades.Details
remodel 2/f kitchen, open 1-wall, add rooms on ground flr, 1-study room (not for sleeping), 1-bath, 1-family room, add small deck and stair to rear yard. general mep upgrades. | $130,000 |
| Nov 21, 2023 | Completed final sign-off Sep 2025 | 2347 39th Av | F C Company | develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades.Details
develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades. | $165,992 |
| Oct 25, 2023 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | Bayview Renovation & Development, Inc. | provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with..Details
provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with.. | $189,366 |
| Sep 18, 2023 | In progress issued Dec 2023 | 1550 Pacific Av | Hang C Construction Inc | to comply w/abe program/ordinance 51-16, abe#20191107704. change partial (e)storefront window to storefront door, provide h/c ramp into store to remedy disability access, comply w/abep, no work to sidewalk, no expansion, interior work only @ front door.Details
to comply w/abe program/ordinance 51-16, abe#20191107704. change partial (e)storefront window to storefront door, provide h/c ramp into store to remedy disability access, comply w/abep, no work to sidewalk, no expansion, interior work only @ front door. | $5,000 |
| Sep 5, 2023 | Completed final sign-off Jan 2024 | 871 Dolores St | San Francisco Green Spaces | widen (e) rear deck at yard. relocate stairs, excavate 20" for sunken patio under deck, about 12.9 cuyds of removed dirt. add appox 20 lf of 38" high retaining wall under deck. deck is < 10' high from grade.Details
widen (e) rear deck at yard. relocate stairs, excavate 20" for sunken patio under deck, about 12.9 cuyds of removed dirt. add appox 20 lf of 38" high retaining wall under deck. deck is < 10' high from grade. | $12,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 7750 Geary Bl | Hang C Construction Inc | add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694.Details
add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694. | $1,500 |
| Aug 14, 2023 | Completed final sign-off Aug 2023 | 15 Stillman St | comply with nov 202310444 add 60 ft of non bearing partitions in basement for storage rooms. basement to remain non habitable, non conditioned. no structural work. add gyp bd to e plaster ceiling. replace 2 e windows at lightwell in kind.Details
comply with nov 202310444 add 60 ft of non bearing partitions in basement for storage rooms. basement to remain non habitable, non conditioned. no structural work. add gyp bd to e plaster ceiling. replace 2 e windows at lightwell in kind. | $4,600 | |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 449 Nevada St | Cardenas Custom Builders Inc. | revision to pa# 202111303281 to document as builts for changes in basement: show wine storage, room & steps; main flr: show pantry & bath locations swapped, add shower in bath; top/flr: master bath fixtures relocated. eliminate wic in master bedroom. office in wic.Details
revision to pa# 202111303281 to document as builts for changes in basement: show wine storage, room & steps; main flr: show pantry & bath locations swapped, add shower in bath; top/flr: master bath fixtures relocated. eliminate wic in master bedroom. office in wic. | $1,000 |
| Jul 5, 2023 | Expired or cancelled cancelled Jan 2026 | 2790 39th Av | add deck at rear yard with stairs to yard approx 153sf (less than 10' from grade, setback from side property lines, 3ft min, not in rear yard setback), interior remodel under separate permit.Details
add deck at rear yard with stairs to yard approx 153sf (less than 10' from grade, setback from side property lines, 3ft min, not in rear yard setback), interior remodel under separate permit. | $15,300 | |
| Jul 5, 2023 | Expired or cancelled cancelled Jan 2026 | 2790 39th Av | remodel 2nd fl. kitchen open walls develope 250 sf new ground fl. rooms for family room and kitchenette (2 burners) make wheel chair accessible insolate where accessible general wep upgrade no exterior work no excavations except at new lol ftgs.Details
remodel 2nd fl. kitchen open walls develope 250 sf new ground fl. rooms for family room and kitchenette (2 burners) make wheel chair accessible insolate where accessible general wep upgrade no exterior work no excavations except at new lol ftgs. | $80,000 | |
| May 2, 2023 | Expired or cancelled cancelled Jan 2026 | 3458 26th St | legalize roof deck, new 42" high guardrails on 3 sides, add deck joists & decking. no change in building footpring.Details
legalize roof deck, new 42" high guardrails on 3 sides, add deck joists & decking. no change in building footpring. | $10,000 | |
| Apr 25, 2023 | Completed final sign-off May 2023 | 3458 26th St | add a 6'-0" high wall @ grade level front yard per pg&e instructions for meter relocation and mounting. no change in building footprint.Details
add a 6'-0" high wall @ grade level front yard per pg&e instructions for meter relocation and mounting. no change in building footprint. | $1,300 | |
| Apr 19, 2023 | Completed final sign-off Sep 2023 | 1953 Pine St | Hang C Construction Inc | replace no exact footprint egress stairs w/new framing, decking, railing and footings.in-kind slightly bigger.upgrade to code.maintain existing unit landing decks by repairing <50% as needed(@door of each units first landing). no change to front elevation/facade of bldg. no change to bld. reqd egresDetails
replace no exact footprint egress stairs w/new framing, decking, railing and footings.in-kind slightly bigger.upgrade to code.maintain existing unit landing decks by repairing <50% as needed(@door of each units first landing). no change to front elevation/facade of bldg. no change to bld. reqd egres | $19,980 |
| Apr 10, 2023 | Completed final sign-off Aug 2023 | 641 28th Av | add missing foundation at existing sunroom, approx. 40 lf. add slab, insulate walls. no change in building footprint or front facade. existing doors and windows to remain.Details
add missing foundation at existing sunroom, approx. 40 lf. add slab, insulate walls. no change in building footprint or front facade. existing doors and windows to remain. | $9,800 | |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 1554 39th Av | Lcy Contruciton Inc | develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closetsDetails
develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closets | $112,800 |
| Mar 27, 2023 | Completed final sign-off Oct 2023 | 535 Wilde Av | R P Construction Inc. | remodel kitchen, open wall, add beam and col, add plywood panels on (e) wall col. in garage add a bath at bedroom, no window or exterior door changes, bolt (e)foundtion as needed, relocate (e)furnace & wh general mep upgardes as neededDetails
remodel kitchen, open wall, add beam and col, add plywood panels on (e) wall col. in garage add a bath at bedroom, no window or exterior door changes, bolt (e)foundtion as needed, relocate (e)furnace & wh general mep upgardes as needed | $64,300 |
| Feb 21, 2023 | Expired or cancelled withdrawn Apr 2023 | 3458 26th St | rear building: add a 6' height wall at 2/l roof deck per pg&e instructions for meter relocation and mounting. reinforcement of (e) roof deck. reframe (e) deck rail to meet building code at 42" height for safety.Details
rear building: add a 6' height wall at 2/l roof deck per pg&e instructions for meter relocation and mounting. reinforcement of (e) roof deck. reframe (e) deck rail to meet building code at 42" height for safety. | $10,000 | |
| Feb 8, 2023 | Completed final sign-off Sep 2023 | 1801 Hyde St | Business Information Li's Construction C | remodel unit 11 and 12 kitchens and baths. remove approx. 8 lf of non-bearing walls eas unit. add plywood to approx 14 lf of extg wall in each unit for voluntary lateral resistance (not seismically req'r) add a closet at each front room. mep unpgrades as needed.Details
remodel unit 11 and 12 kitchens and baths. remove approx. 8 lf of non-bearing walls eas unit. add plywood to approx 14 lf of extg wall in each unit for voluntary lateral resistance (not seismically req'r) add a closet at each front room. mep unpgrades as needed. | $73,674 |
| Jan 11, 2023 | Completed final sign-off Mar 2023 | 160 Pope St | rev2 for final per inspector pa# 2022-0509-3761 & 2022-0809-0121, document as builts, change area relocated w/d to 2nd flr, enlarge bath and change upstairs deck door from double to single. no changes to foundations.Details
rev2 for final per inspector pa# 2022-0509-3761 & 2022-0809-0121, document as builts, change area relocated w/d to 2nd flr, enlarge bath and change upstairs deck door from double to single. no changes to foundations. | ||
| Dec 19, 2022 | Completed final sign-off Oct 2023 | 2175 28th Av | Joe Leo Loeser | remodel kitchen relocate skylight w/new reframe kitchen roof joists and ceiling rafters, change 2 interior windows in-kind, not visible to street general mep up gradesDetails
remodel kitchen relocate skylight w/new reframe kitchen roof joists and ceiling rafters, change 2 interior windows in-kind, not visible to street general mep up grades | $29,000 |
| Nov 23, 2022 | Completed final sign-off Apr 2023 | 40 Rockwood Ct | R P Construction Inc. | remodel kitchen and breakfast room. open approx 6 l/n ft of (e) walls, add plywood panels for reinforcement. general mep upgrades at kitchen.Details
remodel kitchen and breakfast room. open approx 6 l/n ft of (e) walls, add plywood panels for reinforcement. general mep upgrades at kitchen. | $25,000 |
| Nov 7, 2022 | Completed final sign-off May 2023 | 15 Stillman St | F C Company | remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mepDetails
remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mep | $96,328 |
| Aug 9, 2022 | Never finaled issued Aug 2022, no final | 160 Pope St | revision 202205093761 per field inspector. extend existing foundations because owner wants 8'0 ceiling ht and (e) ftgs are too shallow. underpin at prop lind lower (e) slab about 14 inches. execavate about 34 cuyd less than cuyd.pDetails
revision 202205093761 per field inspector. extend existing foundations because owner wants 8'0 ceiling ht and (e) ftgs are too shallow. underpin at prop lind lower (e) slab about 14 inches. execavate about 34 cuyd less than cuyd.p | $9,800 | |
| Jul 18, 2022 | Never finaled filed Jul 2022, never issued | 810 44th Av | lightwell infill at south side. restructure roof & floor framing, ~50 sqft per floor for 2 levels. total 100 sqft new habitable space.Details
lightwell infill at south side. restructure roof & floor framing, ~50 sqft per floor for 2 levels. total 100 sqft new habitable space. | $10,000 | |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 747 28th Av | develop round fl accessory room sto have bedroom, bathroom, family room and laundry. provide escape window or bedrm. excavate site grade 4 cuyd for escape win well to yard. provide new door and window at fam room to yard. excavate cuyd site for win well. retaining walls @ site yardDetails
develop round fl accessory room sto have bedroom, bathroom, family room and laundry. provide escape window or bedrm. excavate site grade 4 cuyd for escape win well to yard. provide new door and window at fam room to yard. excavate cuyd site for win well. retaining walls @ site yard | $78,000 | |
| Jun 27, 2022 | Completed final sign-off Dec 2022 | 58 Bradford St | R P Construction Inc. | add 1 room at ground floor. relocate water heater and laundry. change patio doors & wiindow to rear yardnot visible from street. add shear walls and holdowns on ground floor. general mep upgrades.Details
add 1 room at ground floor. relocate water heater and laundry. change patio doors & wiindow to rear yardnot visible from street. add shear walls and holdowns on ground floor. general mep upgrades. | $14,000 |
| May 9, 2022 | Completed final sign-off Mar 2023 | 160 Pope St | remodel kitchen on 2nd floor panels for stiffness. add new habitable rooms on ground floor 600 sqft, new family, bedrroom, bath. media room, laundry. provide new patio door window to yard (not visible from street) bolt foundations as needed. general mep upgrades.Details
remodel kitchen on 2nd floor panels for stiffness. add new habitable rooms on ground floor 600 sqft, new family, bedrroom, bath. media room, laundry. provide new patio door window to yard (not visible from street) bolt foundations as needed. general mep upgrades. | $85,000 | |
| Apr 25, 2022 | Never finaled issued Apr 2022, no final | 788 Junipero Serra Bl | revision to pa# 202104057903. reconfigure 2 bath layouts per inspector comment. no wall changes. no structural changes fixture count remains same except change 2 tub/shower combo to a single shower.Details
revision to pa# 202104057903. reconfigure 2 bath layouts per inspector comment. no wall changes. no structural changes fixture count remains same except change 2 tub/shower combo to a single shower. | ||
| Feb 22, 2022 | Expired or cancelled cancelled Jan 2026 | 788 Junipero Serra Bl | replace 13 windows in kind - 6 visible from street to be wood matching operation and with true divided lites 4 not visible to be vinyl . change front door.Details
replace 13 windows in kind - 6 visible from street to be wood matching operation and with true divided lites 4 not visible to be vinyl . change front door. | $4,400 | |
| Jan 24, 2022 | Completed final sign-off Jul 2022 | 160 Pope St | add rear deck and stairs to yard, deck less than 10' high from frade and setback mininum 3' from each side from property line. does not encroach into rear yard setback. approx. 136sf. change kitchen window to patio door.Details
add rear deck and stairs to yard, deck less than 10' high from frade and setback mininum 3' from each side from property line. does not encroach into rear yard setback. approx. 136sf. change kitchen window to patio door. | $8,160 | |
| Dec 23, 2021 | Completed final sign-off Sep 2022 | 502 20th Av | develope ground fl. acess rooms family room and bathroom, reconfigure interiors stairs to code make safer remove one col add new beam seismic upgrade new room general mep upgradesDetails
develope ground fl. acess rooms family room and bathroom, reconfigure interiors stairs to code make safer remove one col add new beam seismic upgrade new room general mep upgrades | $58,731 | |
| Dec 23, 2021 | Completed final sign-off Oct 2022 | 564 24th Av | provide new rear yard deck l10 0" from grade with 3'0" side set backs add new stairs to yard add sky light at master bathDetails
provide new rear yard deck l10 0" from grade with 3'0" side set backs add new stairs to yard add sky light at master bath | $9,880 | |
| Nov 30, 2021 | Completed final sign-off Aug 2023 | 449 Nevada St | Cardenas Custom Builders Inc. | develop 1st fl accessory rms.(fam & exer), new bath,relocate laundry,furn,w/d.new patio doors to yard. add powder rm 2nd fl.rmdl kitchen,pantry, office areas.relocate m bath 3rd fl. convert old bath to office. add wic.2 new skylights.escavate <50% cu yd for new lower slabs to gain 7'6 min headrmDetails
develop 1st fl accessory rms.(fam & exer), new bath,relocate laundry,furn,w/d.new patio doors to yard. add powder rm 2nd fl.rmdl kitchen,pantry, office areas.relocate m bath 3rd fl. convert old bath to office. add wic.2 new skylights.escavate <50% cu yd for new lower slabs to gain 7'6 min headrm | $117,218 |
| Nov 22, 2021 | Completed final sign-off Oct 2022 | 2451 26th Av | R P Construction Inc. | add rear stairs from (e) 2nd fl. roof deck to yard; add on grade site deck < 30" high from grade. no change to bldg envelope. no mepDetails
add rear stairs from (e) 2nd fl. roof deck to yard; add on grade site deck < 30" high from grade. no change to bldg envelope. no mep | $11,000 |
| Oct 15, 2021 | Completed final sign-off Oct 2022 | 564 24th Av | existing lightwell (34sf) to be in filled. obtain neighbor's permission. remove non bearing walls. add new prop line wall and in-fill roof. one hr. fire rated typical and interior remodel under pa 202109077819.Details
existing lightwell (34sf) to be in filled. obtain neighbor's permission. remove non bearing walls. add new prop line wall and in-fill roof. one hr. fire rated typical and interior remodel under pa 202109077819. | $3,400 | |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 530 Utah St | at basement create new legal 2nd unit. relocate 1 non bearing wall. no major structural work. capture 69 sf of gar for new kitchen. add landscape steps for new entry to unit. replace e window with door and window 1 hr fire rate between units and garage. mep upgrades as neededDetails
at basement create new legal 2nd unit. relocate 1 non bearing wall. no major structural work. capture 69 sf of gar for new kitchen. add landscape steps for new entry to unit. replace e window with door and window 1 hr fire rate between units and garage. mep upgrades as needed | $48,700 | |
| Sep 14, 2021 | Expired or cancelled cancelled Jan 2026 | 58 Greenview Ct | revision to app#201607283549. scope: acc. rooms down. no bearing walls affected. add plywood panels and holdings. bolt foundation as needed. to update t-24 codes, no bldg code changes. renewed app# 202109108118Details
revision to app#201607283549. scope: acc. rooms down. no bearing walls affected. add plywood panels and holdings. bolt foundation as needed. to update t-24 codes, no bldg code changes. renewed app# 202109108118 | ||
| Sep 10, 2021 | Never finaled issued Sep 2021, no final | 58 Greenview Ct | Xmag Construction | renew expired permit #201607283549. commencement of work not started under previously approved permit 201607283549Details
renew expired permit #201607283549. commencement of work not started under previously approved permit 201607283549 | |
| Sep 7, 2021 | Completed final sign-off Sep 2022 | 564 24th Av | remodel kitchen. open walls, add beams, master bath & walk-in closet. remodel room down for family room. add bathroom. replace windows not visible from street. provide laundry closet. seismic upgrade rooms down. provide new column footing and grade beams. general mep upgrades.Details
remodel kitchen. open walls, add beams, master bath & walk-in closet. remodel room down for family room. add bathroom. replace windows not visible from street. provide laundry closet. seismic upgrade rooms down. provide new column footing and grade beams. general mep upgrades. | $101,210 | |
| Aug 23, 2021 | Completed final sign-off Mar 2023 | 2450 Rivera St | F C Company | infill 2nd fl bath lightwell apprx 7 sf. enlarge e skylight in bath. provide 1 hr f.r. roof and infill, insulate ref 202106152406 int remodelDetails
infill 2nd fl bath lightwell apprx 7 sf. enlarge e skylight in bath. provide 1 hr f.r. roof and infill, insulate ref 202106152406 int remodel | $1,000 |
| Aug 18, 2021 | Completed final sign-off Jul 2022 | 30 San Leandro Wy | develop basement rooms: one bedroom, one bath, laundry, media room. add sheer walls & holdowns, and thickened slab ftgs. repair dryot on south wall. no window changes. no work other floors. (extg furnace and water heater remain) general mep upgrades.Details
develop basement rooms: one bedroom, one bath, laundry, media room. add sheer walls & holdowns, and thickened slab ftgs. repair dryot on south wall. no window changes. no work other floors. (extg furnace and water heater remain) general mep upgrades. | $69,470 | |
| Jul 27, 2021 | Expired or cancelled withdrawn Jul 2025 | 465 Harkness Av | relocate kitchen, new footings, reconfigure baths/bedrooms/stairs, add bedroom suite, (2) bedrooms, (2) baths, laundry @ ground fl, change windows/doors not visible from street. footprint same. seismic ugrade, bolt foundations needed. mep upgrades.Details
relocate kitchen, new footings, reconfigure baths/bedrooms/stairs, add bedroom suite, (2) bedrooms, (2) baths, laundry @ ground fl, change windows/doors not visible from street. footprint same. seismic ugrade, bolt foundations needed. mep upgrades. | $156,400 | |
| Jun 15, 2021 | Completed final sign-off Mar 2023 | 2450 Rivera St | remodel kitchen and bath upstairs. open wall between kitchen and living rm. add beam. new cols. footings. develop grd fl access rooms: master bedroom, bath, family and laundry rm. add plwood, panels, holddowns. bolt e foundation. general mep upgrades, no work to west or south facades change 2 windwsDetails
remodel kitchen and bath upstairs. open wall between kitchen and living rm. add beam. new cols. footings. develop grd fl access rooms: master bedroom, bath, family and laundry rm. add plwood, panels, holddowns. bolt e foundation. general mep upgrades, no work to west or south facades change 2 windws | $130,000 | |
| Jun 15, 2021 | Completed final sign-off Mar 2023 | 2450 Rivera St | change 11 windows. facing street in kind. wood or wood cladDetails
change 11 windows. facing street in kind. wood or wood clad | $3,300 | |
| May 28, 2021 | Completed final sign-off Nov 2023 | 541 15th Av | Rothman Construction | remodel kitchen, open wall, add columbs & new ftgs in garage. add 1/2 bath at 2nd fl. remodel 3rd fl bath. add a masterbath. reconfig closets. add family rm & a bath on g/f. seismic upgrade new rooms. (e) int. stair to remain but make rail safer. 432 sf nw habitable space, bolt found, mep upgradesDetails
remodel kitchen, open wall, add columbs & new ftgs in garage. add 1/2 bath at 2nd fl. remodel 3rd fl bath. add a masterbath. reconfig closets. add family rm & a bath on g/f. seismic upgrade new rooms. (e) int. stair to remain but make rail safer. 432 sf nw habitable space, bolt found, mep upgrades | $125,000 |
| May 11, 2021 | Completed final sign-off Sep 2021 | 1171 Filbert St | unit 1171 on 2nd fl. convert 2 half baths to 2 full baths. replace header beam in kitchen with longer parallam beam. new cols mount to (e) footings below. add w/d closet. reconfigure closets. general mep upgrades.Details
unit 1171 on 2nd fl. convert 2 half baths to 2 full baths. replace header beam in kitchen with longer parallam beam. new cols mount to (e) footings below. add w/d closet. reconfigure closets. general mep upgrades. | $30,000 | |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 2450 Rivera St | remodel kitchen & bath. open walls between kitchen & dining. add beams, coles, new footing at kichen & living. combine entry stair and secondary stair. create 1 grand open entry stair. capture partial entrance for interior. develop ground fl: master bedrm, bath, family rm, laundry. change 12 windowsDetails
remodel kitchen & bath. open walls between kitchen & dining. add beams, coles, new footing at kichen & living. combine entry stair and secondary stair. create 1 grand open entry stair. capture partial entrance for interior. develop ground fl: master bedrm, bath, family rm, laundry. change 12 windows | $135,730 | |
| Apr 5, 2021 | Completed final sign-off Sep 2022 | 788 Junipero Serra Bl | He & Kuang Inc | remodel kitchen. open walls. add beams and columns. verify footings in crawl space. add masterbath and remodel (e) bath. add closets. change 3 windows not visible from street. general mep upgrades.Details
remodel kitchen. open walls. add beams and columns. verify footings in crawl space. add masterbath and remodel (e) bath. add closets. change 3 windows not visible from street. general mep upgrades. | $50,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2025 | 310 29th Av | R P Construction Inc. | revision to pa# 8608381, to document elements changed. delete fire escape. 3rd fl revised full length rear deck, add bath. 2nd fl add shower to bath. fill in aclove. remove stove. move rear stair.Details
revision to pa# 8608381, to document elements changed. delete fire escape. 3rd fl revised full length rear deck, add bath. 2nd fl add shower to bath. fill in aclove. remove stove. move rear stair. | |
| Feb 5, 2021 | Expired or cancelled cancelled Mar 2024 | 63 Forest Knolls Dr | replace (e) solarium with (n) wood type (~228 sf, 12'x19'). all new footings as needed. skylights, windows & patio door. maintain un-condition space status. elec upgrades. (e) solarium approved under pa# 200202259937 & 200510246381.Details
replace (e) solarium with (n) wood type (~228 sf, 12'x19'). all new footings as needed. skylights, windows & patio door. maintain un-condition space status. elec upgrades. (e) solarium approved under pa# 200202259937 & 200510246381. | $22,000 | |
| Jan 26, 2021 | Completed final sign-off Nov 2021 | 115 06th Av | Hang C Construction Inc | remodel 3rd fl master bath. remove non-bearing walls at closet alcove to expand bath. replace bath fixtures. general m.e.p. upgrades.Details
remodel 3rd fl master bath. remove non-bearing walls at closet alcove to expand bath. replace bath fixtures. general m.e.p. upgrades. | $14,990 |
| Jan 6, 2021 | Never finaled issued May 2021, no final | 626 03rd Av | 1st fl: repair ~40sf footings. replace rear stair. bolt foundations. 2nd fl: remodel kitchen, 2 baths, rear porch & laundry. 3rd fl: remodel kitchen, 2 baths, rear porch, laundry area. replace windows. mep upgrades. no work at attic.Details
1st fl: repair ~40sf footings. replace rear stair. bolt foundations. 2nd fl: remodel kitchen, 2 baths, rear porch & laundry. 3rd fl: remodel kitchen, 2 baths, rear porch, laundry area. replace windows. mep upgrades. no work at attic. | $96,000 | |
| Jan 5, 2021 | Completed final sign-off Aug 2022 | 373 Castenada Av | Arnesen Home & Design | add parapet wall to existing roof for safety, ~23 lf. match (e) adjacent parapet wall. stucco finish to match. repair leaky roof (not visible from street).Details
add parapet wall to existing roof for safety, ~23 lf. match (e) adjacent parapet wall. stucco finish to match. repair leaky roof (not visible from street). | $2,300 |
| Nov 9, 2020 | Completed final sign-off Sep 2022 | 665 20th Av | Hang C Construction Inc | rear horizontal addition 2-story. upstairs: convert from (2)bed(1)bath to (2)bed,(1)office,(2)bath. add 2nd legal unit on ground fl (2bed 2bath), changing property from single family house to 2-unit house. general mech/elec/plumb upgrades. (n)2nd fl ground entry/stairs; (n)1st fl unitDetails
rear horizontal addition 2-story. upstairs: convert from (2)bed(1)bath to (2)bed,(1)office,(2)bath. add 2nd legal unit on ground fl (2bed 2bath), changing property from single family house to 2-unit house. general mech/elec/plumb upgrades. (n)2nd fl ground entry/stairs; (n)1st fl unit | $150,000 |
| Mar 4, 2020 | Expired or cancelled cancelled Jan 2026 | 310 29th Av | convert (e) rooms down to 2nd unit, add kitchen, remodel (e) bath capture 156 sq new habitable area, add new exit corridor to street, replace window and pato doors not visable from street, add plywood panel on walls, no excavations, repair slab as needed mep upgrades as needed to obtain finalDetails
convert (e) rooms down to 2nd unit, add kitchen, remodel (e) bath capture 156 sq new habitable area, add new exit corridor to street, replace window and pato doors not visable from street, add plywood panel on walls, no excavations, repair slab as needed mep upgrades as needed to obtain final | $37,600 | |
| Feb 18, 2020 | Never finaled issued May 2020, no final | 2379 15th Av | remodel (e) fam room, bedroom,and bath on 1st fl. add in 56 sf new habitable, 2 new patio doors to yard, open wall, add new beam, cols, footing,tri-fold doors between, fam & bdrm, remodel bathroom down, reconfigure closets, add plywood panel walls and holdowns, bolt (e) fondation general mep upgradeDetails
remodel (e) fam room, bedroom,and bath on 1st fl. add in 56 sf new habitable, 2 new patio doors to yard, open wall, add new beam, cols, footing,tri-fold doors between, fam & bdrm, remodel bathroom down, reconfigure closets, add plywood panel walls and holdowns, bolt (e) fondation general mep upgrade | $50,000 | |
| Jan 24, 2020 | Completed final sign-off Aug 2020 | 665 20th Av | Hang C Construction Inc | remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgradesDetails
remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgrades | $66,000 |
| Oct 28, 2019 | Completed final sign-off Nov 2023 | 399 Ellington Av | J P E Construction | fire retardant wall between units. may need to alter electrical and plumbing if necessary for legalization of extg unit. legalization per ordinance 43-14 to comply with complaints #201931514 and 201931071Details
fire retardant wall between units. may need to alter electrical and plumbing if necessary for legalization of extg unit. legalization per ordinance 43-14 to comply with complaints #201931514 and 201931071 | $10,000 |
| Oct 7, 2019 | Completed final sign-off Dec 2020 | 763 26th Av | R P Construction Inc. | add new open interior stair between grd & 2nd flrs. add ground fl. acessory rooms: family room, bedroom, full bath, new patio doors & windows not visible from street, no work at front except repair terrazo steps, general mep upgradeDetails
add new open interior stair between grd & 2nd flrs. add ground fl. acessory rooms: family room, bedroom, full bath, new patio doors & windows not visible from street, no work at front except repair terrazo steps, general mep upgrade | $93,252 |
| Aug 23, 2019 | Never finaled issued Jan 2022, no final | 1538 Clay St | Hang C Construction Inc | convert 1st floor, garage and storage to 3 adu per ordinance #162-16. (2-1 bdrm, 1-2 bedrm unit)leave2 cars, add laundry, bike parking. change windows and doors on 1st fl. not visible from street front. no work on upper fls. new furnaces & water heaters.every unit has 2 exitsDetails
convert 1st floor, garage and storage to 3 adu per ordinance #162-16. (2-1 bdrm, 1-2 bedrm unit)leave2 cars, add laundry, bike parking. change windows and doors on 1st fl. not visible from street front. no work on upper fls. new furnaces & water heaters.every unit has 2 exits | $133,000 |
| Aug 7, 2019 | Completed final sign-off Oct 2022 | 3342 Laguna St | Jing Hua Construction Corp | 4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywoodDetails
4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywood | $320,000 |
| Jul 18, 2019 | Completed final sign-off Feb 2020 | 2175 28th Av | Joe Leo Loeser | ground fl - accessory rooms, add master bedrm and bath, wic, media room, 2nd room. interior stair to remain. open rails, no doors, replace window w/patio door, add heater, cut foundation. add plywood panel walls. build foundation as needed. general mep upgrades laundry in garageDetails
ground fl - accessory rooms, add master bedrm and bath, wic, media room, 2nd room. interior stair to remain. open rails, no doors, replace window w/patio door, add heater, cut foundation. add plywood panel walls. build foundation as needed. general mep upgrades laundry in garage | $78,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2019 | 2972 21st St | Pop Construction A Parnership | remodel kitchen, remove non-bearing wals, add plywood at (e) wall for lateral, add sound proofing at ceiling, lower/raise sprinkler heads and cig, lts as necessary, sprinkler work under separate permit no work to upper unit & lower garage floors, mep under separate permitDetails
remodel kitchen, remove non-bearing wals, add plywood at (e) wall for lateral, add sound proofing at ceiling, lower/raise sprinkler heads and cig, lts as necessary, sprinkler work under separate permit no work to upper unit & lower garage floors, mep under separate permit | $26,000 |
| May 2, 2019 | Completed final sign-off Mar 2020 | 238 Divisadero St | Matthew P Leffers | add a patio door to yard. new site deck <30 " from gr apprx 152 sf. relocate deck column add header beam to direct new col locations. new footing as needed. replace 1 window. no excavations over 50 cu yd no new habitable spaceDetails
add a patio door to yard. new site deck <30 " from gr apprx 152 sf. relocate deck column add header beam to direct new col locations. new footing as needed. replace 1 window. no excavations over 50 cu yd no new habitable space | $10,420 |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 2451 26th Av | R P Construction Inc. | open kitchen wall - remodel; add beam and columns, reconfigure (e) stairs to 1st fl; new stairs conform to code. add plywood to (e) walls. mep upgrades as neededDetails
open kitchen wall - remodel; add beam and columns, reconfigure (e) stairs to 1st fl; new stairs conform to code. add plywood to (e) walls. mep upgrades as needed | $29,400 |
| Mar 28, 2019 | Completed final sign-off Dec 2021 | 235 Corbett Av | Pop Construction A Parnership | upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgradesDetails
upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgrades | $59,000 |
| Feb 7, 2019 | Expired or cancelled cancelled Jan 2026 | 2728 Irving St | excavate under (e) deck to gain headroom approx 2-6" down to clear 7"-6" 16.8 cuyd of earth. remove 1 deck column. provide new header beam. patio slab 174 sf. add floor drain opt per owner. new site retaining walls max 4'-0" high. sunken patio not visible above gradeDetails
excavate under (e) deck to gain headroom approx 2-6" down to clear 7"-6" 16.8 cuyd of earth. remove 1 deck column. provide new header beam. patio slab 174 sf. add floor drain opt per owner. new site retaining walls max 4'-0" high. sunken patio not visible above grade | $7,570 | |
| Dec 5, 2018 | Completed final sign-off Jan 2019 | 2455 14th Av | Acer Landscaping And Tree Care Inc | to comply with nov 201803041 retaining wall and 6'0" high max. install new south fence w/cmu redwood fence. total retaining nt 48" max typical, no cmu blocks visible above grade more than 36". replace west property fence in kind w/cmu wall and redwood fence. total all new fence 86 lf replace (e)Details
to comply with nov 201803041 retaining wall and 6'0" high max. install new south fence w/cmu redwood fence. total retaining nt 48" max typical, no cmu blocks visible above grade more than 36". replace west property fence in kind w/cmu wall and redwood fence. total all new fence 86 lf replace (e) | $6,020 |
| Oct 25, 2018 | Completed final sign-off Jun 2020 | 55 Salmon St | Hang C Construction Inc | remodel unit 1 & 2 kit & baths fill in (e) interior lightwell not visible from street or neighbors. reconfigure (e) rear stairs connecting all flrs and garafge and roof. voluntary add plywoof & holddowns. replace winds & doors, add window and skylt general mep upgrgades as needed. foundarion work voDetails
remodel unit 1 & 2 kit & baths fill in (e) interior lightwell not visible from street or neighbors. reconfigure (e) rear stairs connecting all flrs and garafge and roof. voluntary add plywoof & holddowns. replace winds & doors, add window and skylt general mep upgrgades as needed. foundarion work vo | $95,000 |
| Oct 18, 2018 | Completed final sign-off Aug 2019 | 88 Molimo Dr | R P Construction Inc. | remodel kitchen open 2 walls, add 2 beams, columns extend to ground fl. verify footings, add if needed. change clerestory windows in-kind (not visible from st). add skylight. replace stair with new. add plywood sheathing. upgrade mep as neededDetails
remodel kitchen open 2 walls, add 2 beams, columns extend to ground fl. verify footings, add if needed. change clerestory windows in-kind (not visible from st). add skylight. replace stair with new. add plywood sheathing. upgrade mep as needed | $16,000 |
| Jul 5, 2018 | Completed final sign-off Nov 2019 | 545 11th Av | Hang C Construction Inc | at back yard enclosed under (e) sunroom for more non-conditioned garage & storage space. add a roll-up door, side door and window. remove 2 columns in garage. add a steel beam seismic upgrade ground fl. provide new 4" slab in in-fill. replace or repair (e) slab in garage as needed. gen mep upgradesDetails
at back yard enclosed under (e) sunroom for more non-conditioned garage & storage space. add a roll-up door, side door and window. remove 2 columns in garage. add a steel beam seismic upgrade ground fl. provide new 4" slab in in-fill. replace or repair (e) slab in garage as needed. gen mep upgrades | $11,600 |
| Jun 14, 2018 | Completed final sign-off Mar 2019 | 504 Joost Av | R P Construction Inc. | *ground fl accesory rooms - add 1 bedrm, family rm, 1 full bath, laundry closet in hall. remove door and wall @ entrance, open to stairs. add 2 skylights upstairs. new exterior deck and stairs to yard. general bolting of (e) foundation as needed. seismic upgrade new rooms on ground fl. general mepDetails
*ground fl accesory rooms - add 1 bedrm, family rm, 1 full bath, laundry closet in hall. remove door and wall @ entrance, open to stairs. add 2 skylights upstairs. new exterior deck and stairs to yard. general bolting of (e) foundation as needed. seismic upgrade new rooms on ground fl. general mep | $48,000 |
| May 31, 2018 | Completed final sign-off Apr 2019 | 1619 29th Av | Quality General Construction Co Inc | develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drsDetails
develop gr fl accessory rms, 1 bdrm, 1 bath, family rm, office room, storage laundry. new stair to fam rm. 1 car park maintained,extend partial e s lightwell to grd. 4x4 not visible, remodel 2 baths, add 1/2 bath upstairs,open walls in kitchen, add new beams. change wndws/drs | $95,000 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 1722 33rd Av | Toni's Construction Inc | develop gr fl rooms; add 2 bedrooms, 1 fam room, 1 full bath, add a wetbar. (e) stairs to remain. remove door at top of stairs. straighten out partion front entrance wall. laundry & utilities in garage. replace windows not visible from st, add patio door to yard. no excavations. add bearing wall andDetails
develop gr fl rooms; add 2 bedrooms, 1 fam room, 1 full bath, add a wetbar. (e) stairs to remain. remove door at top of stairs. straighten out partion front entrance wall. laundry & utilities in garage. replace windows not visible from st, add patio door to yard. no excavations. add bearing wall and | $61,500 |
| May 10, 2018 | Completed final sign-off Mar 2019 | 1354 28th Av | Barron Construction Inc. | infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patioDetails
infill partial interior lgtwell @ 2nd fl for new stair to 1st fl. add open stair partial new roof, not visible by neighbor. develop rooms down: family rm, 1 bedrm, remodel a full bath, add a 1/2 bath. laundry in garage repair floor in (e) storage rm. replace windows not visible from st. add patio | $65,340 |
| Apr 27, 2018 | Completed final sign-off Apr 2021 | 129 18th Av | Hang C Construction Inc | convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade.Details
convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade. | $90,000 |