Block 0194, lot 001
601 Jackson St
- City’s use
- Commercial Office
- Lot
- 2,339 sq ft
- Zoning
- CCB
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 14, 2024 | Completed final sign-off Dec 2024 | 601 Jackson St | Paradise Construction | replace 4 penthouse anodized alm. gl. with anodized alum. gl. windows match adjacent extg windows finishes & sill hts. windows not visible from street. no change to extg egress. no structural changes, no header changes. replace extg tapered insul. & roofing membrane at 4th floor roof (5th fl).Details
replace 4 penthouse anodized alm. gl. with anodized alum. gl. windows match adjacent extg windows finishes & sill hts. windows not visible from street. no change to extg egress. no structural changes, no header changes. replace extg tapered insul. & roofing membrane at 4th floor roof (5th fl). | $14,000 |
| Jan 16, 2020 | Completed final sign-off Mar 2022 | 601 Jackson St | San Francisco Fire Protection | ref pa# 200410045809; like for like for (e) fire alar system all (e) intiating devices to be replaced, new monitoring mocules to be installed to tie in waterflow and tamper switch, all other devices are (e) n/a maherDetails
ref pa# 200410045809; like for like for (e) fire alar system all (e) intiating devices to be replaced, new monitoring mocules to be installed to tie in waterflow and tamper switch, all other devices are (e) n/a maher | $400 |
| Apr 16, 2014 | Never finaled issued Apr 2014, no final | 601 Jackson St | All Bay Construction Inc | install interior non load bearing partition (sheet rock) on 2nd floor.Details
install interior non load bearing partition (sheet rock) on 2nd floor. | $6,500 |
| Feb 26, 2014 | Expired or cancelled cancelled Jan 2026 | 601 Jackson St | Western Builders | at lobby entrance install pre-fabricated steel gate and railing (c0mpliance with maher ordinance no.155-13 not required. excavation less than 50 cu. yd.)Details
at lobby entrance install pre-fabricated steel gate and railing (c0mpliance with maher ordinance no.155-13 not required. excavation less than 50 cu. yd.) | $2,000 |
| Mar 17, 2008 | Completed final sign-off May 2008 | 601 Jackson St | erect a wall, non-electric, non illuminated, single faced new signDetails
erect a wall, non-electric, non illuminated, single faced new sign | ||
| Sep 18, 2006 | Completed final sign-off Oct 2006 | 601 Jackson St | W & J Plumbing Co. | penthouse floor only remove portion of existing wall in between - stairway & elevator lobby @ penthouse floor. add a new 1 hour rated door &hallway exit to roof level.separate from existing office area.no structural work under this permit.Details
penthouse floor only remove portion of existing wall in between - stairway & elevator lobby @ penthouse floor. add a new 1 hour rated door &hallway exit to roof level.separate from existing office area.no structural work under this permit. | $3,500 |
| Jun 27, 2006 | Never finaled issued Jun 2006, no final | 601 Jackson St | San Francisco Fire Protection | move one strobe/horn on 3rd floor due to construct of 3 officesDetails
move one strobe/horn on 3rd floor due to construct of 3 offices | $200 |
| Feb 24, 2006 | Never finaled issued Feb 2006, no final | 601 Jackson St | remodel extg office space and install new airconditioning system per plan(see attatched sheet for reference)Details
remodel extg office space and install new airconditioning system per plan(see attatched sheet for reference) | $23,000 | |
| Feb 10, 2006 | Completed final sign-off Feb 2006 | 601 Jackson St | D & S Leong Associates | relocate extg sprinklers heads and install 3 additional heads connect to exgt/replace upright heads to recessed pendent headsDetails
relocate extg sprinklers heads and install 3 additional heads connect to exgt/replace upright heads to recessed pendent heads | $1,500 |
| Dec 5, 2005 | Never finaled issued Dec 2005, no final | 601 Jackson St | street spaceDetails
street space | ||
| Nov 7, 2005 | Never finaled issued Dec 2005, no final | 601 Jackson St | enclose penthouse floor opening approximate 7'x9'.Details
enclose penthouse floor opening approximate 7'x9'. | $15,000 | |
| Sep 30, 2005 | Completed final sign-off Feb 2006 | 601 Jackson St | tenant improvement at 3rd floor/add floor tiles suspension ceiling/ceiling light and kchn/add door from elevator lobby to exit stairwayDetails
tenant improvement at 3rd floor/add floor tiles suspension ceiling/ceiling light and kchn/add door from elevator lobby to exit stairway | $60,000 | |
| Jun 21, 2005 | Completed final sign-off Jul 2005 | 601 Jackson St | Transworld Construction | to renew 200502256241 for final inspectionDetails
to renew 200502256241 for final inspection | |
| Mar 4, 2005 | Completed final sign-off Jul 2005 | 851 Kearny St | Transworld Construction | renew 200111213751, 200207020550, 9506166 for final insp.Details
renew 200111213751, 200207020550, 9506166 for final insp. | |
| Feb 25, 2005 | Expired or cancelled expired Jul 2005 | 601 Jackson St | Transworld Construction | renew app 9506166 for final inspectionDetails
renew app 9506166 for final inspection | |
| Oct 4, 2004 | Completed final sign-off Dec 2005 | 601 Jackson St | San Francisco Fire Protection | install fire alarm system to new buildingDetails
install fire alarm system to new building | $10,000 |
| Jun 2, 2004 | Completed final sign-off Mar 2005 | 601 Jackson St | rev.appl#9506166 change brick veneer installation detail from cement plaster backing to metal cladDetails
rev.appl#9506166 change brick veneer installation detail from cement plaster backing to metal clad | ||
| Oct 9, 2003 | Completed final sign-off Dec 2005 | 601 Jackson St | Transworld Construction | construct conc. block wall @kearny st.sidwalk for transofmer below sidewlak, to raise floor aboveDetails
construct conc. block wall @kearny st.sidwalk for transofmer below sidewlak, to raise floor above | $3,000 |
| Jul 29, 2003 | Completed final sign-off Dec 2005 | 601 Jackson St | Perfect Connection Inc. | install fire sprinkler system.Details
install fire sprinkler system. | $48,000 |
| Jul 2, 2002 | Completed final sign-off Dec 2005 | 851 Kearny St | Transworld Construction | revision to 200111213751 to providee shoring along east (kearny st) & north (jackson st)Details
revision to 200111213751 to providee shoring along east (kearny st) & north (jackson st) | $100 |
| Nov 21, 2001 | Completed final sign-off Dec 2005 | 851 Kearny St | shoring along east (kearny) & north (jackson st)prop lines for new 4 story build on vacant lotDetails
shoring along east (kearny) & north (jackson st)prop lines for new 4 story build on vacant lot | $80,000 |