Block 3038, lot 018
287 Yerba Buena Ave
- City’s use
- Single Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,491 sq ft
- Lot
- 4,007 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2024 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | Bayview Renovation & Development, Inc. | revision to pa# 202310259466: extend (e) perimeter footing by adding concrete to (e\) footing from the front with rebars and adding concrete to bottom rather than connecting rebars to concrete from below (e) footings. location on north wall. extension of footings mainly for waterproofing.Details
revision to pa# 202310259466: extend (e) perimeter footing by adding concrete to (e\) footing from the front with rebars and adding concrete to bottom rather than connecting rebars to concrete from below (e) footings. location on north wall. extension of footings mainly for waterproofing. | |
| Oct 25, 2023 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | Bayview Renovation & Development, Inc. | provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with..Details
provide wheelchair accessibility and develop ground floor access rooms - include 2 bedrooms, 1 bath, 1 multipurpose room, kitchenette, laundry and closets. extend (e) column and perimeter footings. reinfornce (e) footings as needed. add grade beams as needed. relocate (e) furance. replace w/h with.. | $189,366 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 287 Yerba Buena Av | Bayview Renovation & Development, Inc. | replacement of deteriorated concrete at garage and driveway area within frong setback for work is less than 200 sq.ft.Details
replacement of deteriorated concrete at garage and driveway area within frong setback for work is less than 200 sq.ft. | $4,800 |
| Feb 24, 2006 | Never finaled issued Feb 2006, no final | 287 Yerba Buena Av | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bayview Renovation & Development, Inc. (3)
- Architects
- Lisa Wong (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.