- Jul 2020 to Oct 2026
42 permits since 2000 (contractor on 42 permits, authorized agent-others on 3 permits): 25 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress issued Oct 2026 | 515 John Muir Dr | Blu Sky Restoration Contractors Llc | demo of damaged walls and ceilings after water damage from the 5th floor. all interior work.Details
demo of damaged walls and ceilings after water damage from the 5th floor. all interior work. | $20,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 491 31st Av | Blu Sky Restoration Contractors Llc | scope related to fire and water damage that occured in units 407, 307, 304 and 204 only. work includes interior finishes, doors, and electrical work. all work will be replaced like for like approach. to comply with nov's 202649157 & 202655176Details
scope related to fire and water damage that occured in units 407, 307, 304 and 204 only. work includes interior finishes, doors, and electrical work. all work will be replaced like for like approach. to comply with nov's 202649157 & 202655176 | $150,000 |
| May 21, 2026 | In progress issued Jun 2026 | 305 Hyde St | Blu Sky Restoration Contractors Llc | fire at unit 604 and spred to units 605, 504 and 202. all work will be completed to return each affected unit to orig conditions incl the removal and repl of fire damaged gyp, interior finishes, plumbing, electrical, windows and doors to comply with nov202428667. all work in-kind.Details
fire at unit 604 and spred to units 605, 504 and 202. all work will be completed to return each affected unit to orig conditions incl the removal and repl of fire damaged gyp, interior finishes, plumbing, electrical, windows and doors to comply with nov202428667. all work in-kind. | $250,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 417 Hyde St | Blu Sky Restoration Contractors Llc | unit 1 & 3: repair to related to a fire that occured in unit #7 above.Details
unit 1 & 3: repair to related to a fire that occured in unit #7 above. | $25,000 |
| Mar 26, 2026 | Completed final sign-off Jun 2026 | 845 Market St | Blu Sky Restoration Contractors Llc | work related to fire in exterior wall at sf centre and spread to interior hallway. all work will b e completed to return the space to orig conditions under the 2025 e building code repair provisions. repair all damaged interior and exterior finishes, no structural damage. no change of occupancy,use,Details
work related to fire in exterior wall at sf centre and spread to interior hallway. all work will b e completed to return the space to orig conditions under the 2025 e building code repair provisions. repair all damaged interior and exterior finishes, no structural damage. no change of occupancy,use, | $100,000 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 1030 Post St | Blu Sky Restoration Contractors Llc | #112. to obtain final insepction for work approved under pa# 202309126402 & 202308114247. all work is complete.Details
#112. to obtain final insepction for work approved under pa# 202309126402 & 202308114247. all work is complete. | |
| Jan 22, 2026 | Completed final sign-off May 2026 | 350 Turk St | Blu Sky Restoration Contractors Llc | fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for likeDetails
fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for like | $100,000 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 1430 Sacramento St | Blu Sky Restoration Contractors Llc | minor first damage to unit 2, front family room and exterior repair work, replace vinyl window and replace damaged electrical wire and fixture to match original conditions.Details
minor first damage to unit 2, front family room and exterior repair work, replace vinyl window and replace damaged electrical wire and fixture to match original conditions. | $15,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 417 Hyde St | Blu Sky Restoration Contractors Llc | unit #7: r/r fire damaged inteiror finishes, windows, electrical, plumbing, ceiling/roof framing and roof materials. unit #5: r/r fire/water damaged interior finishes. all work to return building to original conditions. to comply with nov202542537Details
unit #7: r/r fire damaged inteiror finishes, windows, electrical, plumbing, ceiling/roof framing and roof materials. unit #5: r/r fire/water damaged interior finishes. all work to return building to original conditions. to comply with nov202542537 | $150,000 |
| Nov 14, 2025 | In progress issued Nov 2025 | 3620 Balboa St | Blu Sky Restoration Contractors Llc, M B C Enterprises Inc | installation ventless hood in bar area of restaurant. ul listed.Details
installation ventless hood in bar area of restaurant. ul listed. | $20,000 |
| Nov 4, 2025 | Completed final sign-off Nov 2025 | 1925 Leavenworth St | Blu Sky Restoration Contractors Llc | to comply with nov# 202538345, add sheetrock to boiler room (under unit #5). common area boiler room.Details
to comply with nov# 202538345, add sheetrock to boiler room (under unit #5). common area boiler room. | $2,500 |
| Nov 3, 2025 | In progress issued Nov 2025 | 419 Hyde St | Blu Sky Restoration Contractors Llc | units 5 & 7: exploratory demo for two units.Details
units 5 & 7: exploratory demo for two units. | $10,000 |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 131 Steuart St | Blu Sky Restoration Contractors Llc | reroofing. no hot works.Details
reroofing. no hot works. | $125,000 |
| Sep 4, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision 202412277450- revise accessible counter at proposed bar repair of plumbing/electrical in kind. omit proposed lighting, (e) to remainDetails
revision 202412277450- revise accessible counter at proposed bar repair of plumbing/electrical in kind. omit proposed lighting, (e) to remain | |
| Aug 29, 2025 | Completed final sign-off Nov 2025 | 1925 Leavenworth St | Blu Sky Restoration Contractors Llc | to comply with violation 202538345 replace air supply return duct in the crawl space of unit #5Details
to comply with violation 202538345 replace air supply return duct in the crawl space of unit #5 | $2,500 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 1940 Vallejo St | Blu Sky Restoration Contractors Llc | unit 3- interior demo and removal and remediation of asbestor containing materials in lath and plaster walls and floor tiles in kitchen, maids bathroom and bedroom, including destroyed kitchen cabinetry resulting from fire in unit 5 and water intrusion into unit 3. remodel under other permitDetails
unit 3- interior demo and removal and remediation of asbestor containing materials in lath and plaster walls and floor tiles in kitchen, maids bathroom and bedroom, including destroyed kitchen cabinetry resulting from fire in unit 5 and water intrusion into unit 3. remodel under other permit | $25,000 |
| Aug 21, 2025 | Completed final sign-off Sep 2025 | 2645 Ocean Av | Blu Sky Restoration Contractors Llc | remove and replace damaged aluminum window frame using like for like approach. (exterior work only for structural frame)Details
remove and replace damaged aluminum window frame using like for like approach. (exterior work only for structural frame) | $5,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1664 Larkin St | Blu Sky Restoration Contractors Llc | emergency shoring to fire damaged building.Details
emergency shoring to fire damaged building. | $7,500 |
| Apr 1, 2025 | Completed final sign-off Mar 2026 | 625 Taylor St | Blu Sky Restoration Contractors Llc | work in unit 200 only. remove and replace fire and smoke damaged interior finishes and wiring. remove and replace 1 damaged window. remove and replace wall heater.Details
work in unit 200 only. remove and replace fire and smoke damaged interior finishes and wiring. remove and replace 1 damaged window. remove and replace wall heater. | $56,000 |
| Apr 1, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision to pa#202403046992. application includes repair or replace of existing plumbing with in kind systems for the restroom and bar areas. relocate mop & handsink on mezzanine, reuse of existing 200amp feeds for new panels a&b provided to supply new branch circuits. see origainal pa.Details
revision to pa#202403046992. application includes repair or replace of existing plumbing with in kind systems for the restroom and bar areas. relocate mop & handsink on mezzanine, reuse of existing 200amp feeds for new panels a&b provided to supply new branch circuits. see origainal pa. | |
| Dec 27, 2024 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision to pa #202403046992 to include mep for restaurant and restrooms and associated work due to floor. see original pa for accessibility features.Details
revision to pa #202403046992 to include mep for restaurant and restrooms and associated work due to floor. see original pa for accessibility features. | $180,000 |
| Nov 6, 2024 | Completed final sign-off May 2025 | 115 Lake Merced Hill St South St | Blu Sky Restoration Contractors Llc | to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior workDetails
to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior work | $50,000 |
| Nov 6, 2024 | Completed final sign-off Jul 2025 | 113 Lake Merced Hill So Bl | Blu Sky Restoration Contractors Llc | fire damage repair to 2nd floor stair case area, scope interior finishes, electrical like for like fire damage interior work only no exterior workDetails
fire damage repair to 2nd floor stair case area, scope interior finishes, electrical like for like fire damage interior work only no exterior work | $50,000 |
| Apr 26, 2024 | In progress issued May 2024 | 115 Lake Merced Hill St South St | Blu Sky Restoration Contractors Llc | repair in kind after fire. drywall repair to fire damaged areas, replace lighting and plumbing fixtures, no wire or pipe to be replaced. repair roof above areas cut by fire department.Details
repair in kind after fire. drywall repair to fire damaged areas, replace lighting and plumbing fixtures, no wire or pipe to be replaced. repair roof above areas cut by fire department. | $25,000 |
| Apr 26, 2024 | In progress issued May 2024 | 113 Lake Merced Hill St South St | Blu Sky Restoration Contractors Llc | repair in kind after fire. drywall repair to fire damaged areas, replace lighting and plumbing fixtures, no wire or pipe to be replaced, roof to be repaired above fire department cuts - to comply w/ nov# 202417701Details
repair in kind after fire. drywall repair to fire damaged areas, replace lighting and plumbing fixtures, no wire or pipe to be replaced, roof to be repaired above fire department cuts - to comply w/ nov# 202417701 | $25,000 |
| Mar 14, 2024 | Completed final sign-off Mar 2026 | 1030 Post St | Blu Sky Restoration Contractors Llc | 5th fl & 4th fl fire and water damage repair in-kind. remodel 19 units on 4th fl & 5th fl to include new intrior finishes and fixtures, appliances and other water/smoke damaged areas like for like as needed. obtain seperate mep permits. repair to roof. replace steel frames in-kind on 5th floor.Details
5th fl & 4th fl fire and water damage repair in-kind. remodel 19 units on 4th fl & 5th fl to include new intrior finishes and fixtures, appliances and other water/smoke damaged areas like for like as needed. obtain seperate mep permits. repair to roof. replace steel frames in-kind on 5th floor. | $800,000 |
| Mar 4, 2024 | Completed final sign-off Apr 2026 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | interior t.i. to replace (e) bar & finishes due to water damage: bar wallm equipment, electrical, plumbing. upgrade restrooms to full complaiance , no change to occupancy & exterior, minor work to 2nd floor flooring & remove door. add stair strip upgrade handrailsDetails
interior t.i. to replace (e) bar & finishes due to water damage: bar wallm equipment, electrical, plumbing. upgrade restrooms to full complaiance , no change to occupancy & exterior, minor work to 2nd floor flooring & remove door. add stair strip upgrade handrails | $50,000 |
| Oct 23, 2023 | Completed final sign-off Mar 2025 | 823 Ingerson Av | Blu Sky Restoration Contractors Llc, Bayview Construction Engineers, Advanced Restoration Inc | to comply with nov# 202306053 fire damage: replace everything in kind removal and replacement of all drywall, windows and doors, plumbing and electrical. repair to roof framing and damaged deck railings. full reroof of roofing materials. exterior wood siding at east elevation to be replaced.Details
to comply with nov# 202306053 fire damage: replace everything in kind removal and replacement of all drywall, windows and doors, plumbing and electrical. repair to roof framing and damaged deck railings. full reroof of roofing materials. exterior wood siding at east elevation to be replaced. | $450,000 |
| Sep 12, 2023 | Expired or cancelled expired Mar 2026 | 1030 Post St | Blu Sky Restoration Contractors Llc | unit 112: revision to bpa#202308114247, water damage repair due to fire on 5/f, kitchen includedDetails
unit 112: revision to bpa#202308114247, water damage repair due to fire on 5/f, kitchen included | |
| Aug 11, 2023 | Expired or cancelled expired Mar 2026 | 1030 Post St | Blu Sky Restoration Contractors Llc | unit 514 need to clean fire materials. demolition or remove sheetrock at unit(s) 401,301,201.Details
unit 514 need to clean fire materials. demolition or remove sheetrock at unit(s) 401,301,201. | $50,000 |
| Aug 2, 2023 | Completed final sign-off Sep 2023 | 2600 Ingalls St | Blu Sky Restoration Contractors Llc | repair damaged wall hit by car - stucco and drywall to comply w/ #202309986.Details
repair damaged wall hit by car - stucco and drywall to comply w/ #202309986. | $10,000 |
| Nov 23, 2022 | Never finaled issued Nov 2022, no final | 35 Casa Wy | Blu Sky Restoration Contractors Llc | water loss, plaster walls and ceilings= selective demolition. demo scope available for affected reference. emergency services. unit #303- bathroom. unit #203- (2) closets, unit #201- bedroom, unit #103-bathroom, hallway, closet, bedroom, kitchen. unit #101- bedroom and closet. approx 900 sf.Details
water loss, plaster walls and ceilings= selective demolition. demo scope available for affected reference. emergency services. unit #303- bathroom. unit #203- (2) closets, unit #201- bedroom, unit #103-bathroom, hallway, closet, bedroom, kitchen. unit #101- bedroom and closet. approx 900 sf. | $15,000 |
| Nov 17, 2022 | Expired or cancelled cancelled Feb 2023 | 266 King St | Blu Sky Restoration Contractors Llc | remove and replace concrete slab 120 sq ftDetails
remove and replace concrete slab 120 sq ft | $2,000 |
| Sep 30, 2022 | Never finaled issued Sep 2022, no final | 2235 Beach St | Blu Sky Restoration Contractors Llc | unit 101, scrape lead loose and peel paint in kitchen ceiling, replace in kindDetails
unit 101, scrape lead loose and peel paint in kitchen ceiling, replace in kind | $5,000 |
| Sep 30, 2022 | Never finaled issued Sep 2022, no final | 2235 Beach St | Blu Sky Restoration Contractors Llc | unit #401: remove and replace 8' x 8' plaster and wood lath on ceiling; replace in kindDetails
unit #401: remove and replace 8' x 8' plaster and wood lath on ceiling; replace in kind | $4,000 |
| Aug 10, 2022 | Completed final sign-off Sep 2022 | 211 Putnam St | Blu Sky Restoration Contractors Llc | to comply with 202291733: exterior stairway less than 50%. damage framing and siding.Details
to comply with 202291733: exterior stairway less than 50%. damage framing and siding. | $15,000 |
| Apr 6, 2022 | Completed final sign-off Apr 2022 | 475 Chestnut St | Blu Sky Restoration Contractors Llc | to comply with 202287945 replace damaged ceiling and walls in unit# 1, 2, and 5Details
to comply with 202287945 replace damaged ceiling and walls in unit# 1, 2, and 5 | $1,000 |
| Dec 13, 2021 | Completed final sign-off Jan 2022 | 845 California St | Blu Sky Restoration Contractors Llc | to comply with nov #202056311. repair and replace ceiling of unit #506. finish ceiling.Details
to comply with nov #202056311. repair and replace ceiling of unit #506. finish ceiling. | $1,500 |
| Nov 5, 2021 | Completed final sign-off May 2022 | 475 Chestnut St | Blu Sky Restoration Contractors Llc | unit 1 and 5: ceiling demo amd replace sheetrock at ceiling and walls (lobby, 2nd 3rd roof garage) and common hallway to comply with nov 20283846. no removal of plywood or studs. (fix any leaks found)Details
unit 1 and 5: ceiling demo amd replace sheetrock at ceiling and walls (lobby, 2nd 3rd roof garage) and common hallway to comply with nov 20283846. no removal of plywood or studs. (fix any leaks found) | $5,000 |
| Oct 22, 2021 | Completed final sign-off Nov 2021 | 300 Buchanan St | Blu Sky Restoration Contractors Llc | unit 108: remove and install cabinets in (1) kitchenDetails
unit 108: remove and install cabinets in (1) kitchen | $5,000 |
| May 7, 2021 | Expired or cancelled expired Nov 2024 | 2970 Mission St | Blu Sky Restoration Contractors Llc | walls and roof repair afer fire damage. electrical repair and upgrade after fire damage (like-for-like).Details
walls and roof repair afer fire damage. electrical repair and upgrade after fire damage (like-for-like). | $300,000 |
| Jul 15, 2020 | Completed final sign-off Sep 2022 | 3326 San Bruno Av | Blu Sky Restoration Contractors Llc, Bayview Construction Engineers | no other structural work. scope of work limited to damaged sheetrock replacement. repairs due to fire/comply w/ nov #202039041. sheetrock need to be replaced on 2nd story of 2-story. all (n) sheetrock shall be 5/8" type x gyp sheathing w/ 10d nails at 6"o.cDetails
no other structural work. scope of work limited to damaged sheetrock replacement. repairs due to fire/comply w/ nov #202039041. sheetrock need to be replaced on 2nd story of 2-story. all (n) sheetrock shall be 5/8" type x gyp sheathing w/ 10d nails at 6"o.c | $50,000 |