Block 0629, lot 043
2298 Fillmore St
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 2
- Units
- 4
- Rooms
- 5 bathrooms
- Building
- 6,680 sq ft
- Lot
- 2,418 sq ft
- Zoning
- FILLMR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision 202412277450- revise accessible counter at proposed bar repair of plumbing/electrical in kind. omit proposed lighting, (e) to remainDetails
revision 202412277450- revise accessible counter at proposed bar repair of plumbing/electrical in kind. omit proposed lighting, (e) to remain | |
| May 8, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Friendly Fire Systems | relocate and addition of fire sprinklers as required by ceiling work ref pa 202403046992Details
relocate and addition of fire sprinklers as required by ceiling work ref pa 202403046992 | $4,900 |
| Apr 1, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision to pa#202403046992. application includes repair or replace of existing plumbing with in kind systems for the restroom and bar areas. relocate mop & handsink on mezzanine, reuse of existing 200amp feeds for new panels a&b provided to supply new branch circuits. see origainal pa.Details
revision to pa#202403046992. application includes repair or replace of existing plumbing with in kind systems for the restroom and bar areas. relocate mop & handsink on mezzanine, reuse of existing 200amp feeds for new panels a&b provided to supply new branch circuits. see origainal pa. | |
| Feb 13, 2025 | Completed final sign-off Sep 2025 | 2298 Fillmore St | revision to pa # 202403046992: to include a rvision to restroom and storage plan. no chnge to food prep. see original pa for accessibility feature. layout change only. no additional plumbing fixtures.Details
revision to pa # 202403046992: to include a rvision to restroom and storage plan. no chnge to food prep. see original pa for accessibility feature. layout change only. no additional plumbing fixtures. | ||
| Dec 27, 2024 | Completed final sign-off Sep 2025 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | revision to pa #202403046992 to include mep for restaurant and restrooms and associated work due to floor. see original pa for accessibility features.Details
revision to pa #202403046992 to include mep for restaurant and restrooms and associated work due to floor. see original pa for accessibility features. | $180,000 |
| Mar 4, 2024 | Completed final sign-off Apr 2026 | 2298 Fillmore St | Blu Sky Restoration Contractors Llc | interior t.i. to replace (e) bar & finishes due to water damage: bar wallm equipment, electrical, plumbing. upgrade restrooms to full complaiance , no change to occupancy & exterior, minor work to 2nd floor flooring & remove door. add stair strip upgrade handrailsDetails
interior t.i. to replace (e) bar & finishes due to water damage: bar wallm equipment, electrical, plumbing. upgrade restrooms to full complaiance , no change to occupancy & exterior, minor work to 2nd floor flooring & remove door. add stair strip upgrade handrails | $50,000 |
| Jul 27, 2023 | Completed final sign-off Sep 2023 | 2481 Clay St | Shaughnessy Roofing Inc | re-roofing. cool-roofDetails
re-roofing. cool-roof | $48,000 |
| Jul 20, 2023 | Never finaled filed Jul 2023, never issued | 2298 Fillmore St | Hansen Machinery Corp | remove non operable hvac duct and old units. repair roof in the areas where duct (approx. 30 sf) is removed. apply general coatings ultra flex coating system over existing bur (1 layer) for maintence coating system over existing cool roof.Details
remove non operable hvac duct and old units. repair roof in the areas where duct (approx. 30 sf) is removed. apply general coatings ultra flex coating system over existing bur (1 layer) for maintence coating system over existing cool roof. | $35,000 |
| May 23, 2017 | Never finaled issued May 2017, no final | 2298 Fillmore St | street spaceDetails
street space | ||
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 2485 Clay St | street spaceDetails
street space | ||
| May 20, 2014 | Never finaled issued May 2014, no final | 2485 Clay St | street space and mta permitDetails
street space and mta permit | ||
| Sep 28, 2012 | Completed final sign-off Aug 2013 | 2298 Fillmore St | 1 electrical wall sign.Details
1 electrical wall sign. | $1,500 | |
| Sep 28, 2012 | Completed final sign-off Dec 2012 | 2298 Fillmore St | proposed barrier removal project to modify (e) men's restroom to become inisex handcapped accessible single occupant restroom.Details
proposed barrier removal project to modify (e) men's restroom to become inisex handcapped accessible single occupant restroom. | $5,000 | |
| Sep 28, 2012 | Never finaled issued Sep 2012, no final | 2298 Fillmore St | Alan Hammel Construction | to obtain final inspection for work approved under pa#200407148804. all work is complete.Details
to obtain final inspection for work approved under pa#200407148804. all work is complete. | |
| Sep 28, 2012 | Completed final sign-off Feb 2013 | 2298 Fillmore St | Alan Hammel Construction | permit to address nov. 201146187,& abate refer to approved ti permit # 201112301501Details
permit to address nov. 201146187,& abate refer to approved ti permit # 201112301501 | |
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 2298 Fillmore St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Dec 30, 2011 | Completed final sign-off Feb 2013 | 2298 Fillmore St | Alan Hammel Construction | non structural interior remodel to existing a-2 restaurant. work includes interior finishes, replacement of existing seating and lighting fixtures. no change to storefront or existing restrooms. no change in occupancy. see 200708159877 for approved egress pathDetails
non structural interior remodel to existing a-2 restaurant. work includes interior finishes, replacement of existing seating and lighting fixtures. no change to storefront or existing restrooms. no change in occupancy. see 200708159877 for approved egress path | $25,000 |
| Jan 15, 2010 | Never finaled issued Jan 2010, no final | 2298 Fillmore St | Exxell Corp. Dba Exxell Fire Systems | hood and duct work: upgrade of existing system to ul 300 pyro-chem fire suppression system for existin restaurantDetails
hood and duct work: upgrade of existing system to ul 300 pyro-chem fire suppression system for existin restaurant | $4,500 |
| Jul 13, 2009 | Completed final sign-off Jul 2009 | 2298 Fillmore St | Hammerhead Construction | renew pa# 2007/08/15/9877 to obtain final inspection. all work has been completed.Details
renew pa# 2007/08/15/9877 to obtain final inspection. all work has been completed. | |
| Mar 11, 2009 | Completed final sign-off Jul 2009 | 2298 Fillmore St | Hammerhead Construction | correct discrepancies in original plans for bldg. permit appl.#2007/0815/9877 to relocate bar & seating and include new handicap door; respond to n.o.v.#200886228. also to seek a-2 assembly permit from legalize existing 39 inches stairwell.Details
correct discrepancies in original plans for bldg. permit appl.#2007/0815/9877 to relocate bar & seating and include new handicap door; respond to n.o.v.#200886228. also to seek a-2 assembly permit from legalize existing 39 inches stairwell. | |
| Jan 7, 2008 | Never finaled issued Jan 2008, no final | 2298 Fillmore St | street spaceDetails
street space | ||
| Sep 19, 2007 | Never finaled issued Sep 2007, no final | 2298 Fillmore St | street spaceDetails
street space | ||
| Aug 15, 2007 | Expired or cancelled expired Dec 2008 | 2298 Fillmore St | Hammerhead Construction | relocate existing b ar to front of space, new add entry doors, relocate existing seating, repair handrails to stairs.Details
relocate existing b ar to front of space, new add entry doors, relocate existing seating, repair handrails to stairs. | $6,000 |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 2298 Fillmore St | street space & side walk permit.Details
street space & side walk permit. | ||
| Jul 20, 2006 | Never finaled issued Jul 2006, no final | 2298 Fillmore St | street spaceDetails
street space | ||
| Jul 14, 2004 | Expired or cancelled expired Jan 2006 | 2298 Fillmore St | replace existing gas converction, comply with nov 200450395.Details
replace existing gas converction, comply with nov 200450395. | $1,200 | |
| Mar 25, 2003 | Completed final sign-off Jun 2003 | 2298 Fillmore St | repl of hood only from galvanized to steel; (ref. 200303210309)Details
repl of hood only from galvanized to steel; (ref. 200303210309) | $3,000 | |
| Mar 21, 2003 | Completed final sign-off Jun 2003 | 2298 Fillmore St | change (e) light fixtures, change (e) sink, replace (e) handrail, refurbish bar, install crown moldiDetails
change (e) light fixtures, change (e) sink, replace (e) handrail, refurbish bar, install crown moldi | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.