Jessica Atal Nemerovski At
- Listed as
- authorized agent-others, contractor, designer, pmt consultant/expediter
- Firm
- Harmony Design & Development Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2020 to Mar 2026
64 permits since 2000 (contractor on 64 permits, authorized agent-others on 8 permits, designer on 2 permits, pmt consultant/expediter on 1 permit): 46 completed, 9 in progress, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Jun 2026 | 166 Desmond St | Harmony Design & Development Inc | rewire (e) outlets, switches & lights. add 14 new outlets. project inclues patch some plastic & painting for the home. no sprinkler system workDetails
rewire (e) outlets, switches & lights. add 14 new outlets. project inclues patch some plastic & painting for the home. no sprinkler system work | $35,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 215 29th St | Harmony Design & Development Inc, Boaz Mor Design & Construction | unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations)Details
unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations) | |
| Jan 22, 2026 | In progress issued Apr 2026 | 561 Anderson St | Harmony Design & Development Inc, Frederic Grasset Design-Build | revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditionsDetails
revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditions | |
| Jan 16, 2026 | Completed final sign-off Jan 2026 | 3676 17th St | Harmony Design & Development Inc | to obtain final inspection for work approved under pa# 202408017767 & 202402095602. all work is complete.Details
to obtain final inspection for work approved under pa# 202408017767 & 202402095602. all work is complete. | |
| Dec 9, 2025 | In progress issued Dec 2025 | 241 Granville Wy | Harmony Design & Development Inc, We Do Construction Inc. | 2nd floor bathroom remodel in-kind, sink, shower pan, toilet.Details
2nd floor bathroom remodel in-kind, sink, shower pan, toilet. | $47,000 |
| Dec 9, 2025 | In progress issued Dec 2025 | 215 29th St | Harmony Design & Development Inc, Boaz Mor Design & Construction | unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.Details
unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances. | $119,500 |
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 1660 Page St | Harmony Design & Development Inc | to obtain final inspection for work approved under pa #202102124626. all work is complete.Details
to obtain final inspection for work approved under pa #202102124626. all work is complete. | $15,000 |
| Nov 14, 2025 | In progress issued Dec 2025 | 10 Arbor St | Harmony Design & Development Inc | revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddownsDetails
revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns | $48,000 |
| Sep 4, 2025 | In progress issued Dec 2025 | 1 Country Club Dr | Ly Green Construction Inc, Harmony Design & Development Inc | revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the otherDetails
revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other | |
| Jul 21, 2025 | In progress issued Jul 2025 | 10 Arbor St | Harmony Design & Development Inc | full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kindDetails
full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kind | $110,000 |
| Jun 10, 2025 | Completed final sign-off Oct 2025 | 1501 Filbert St | Harmony Design & Development Inc | unit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features.Details
unit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features. | $57,000 |
| Apr 9, 2025 | Completed final sign-off Oct 2025 | 1501 Filbert St | Harmony Design & Development Inc | unit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind.Details
unit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind. | $80,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 1 Country Club Dr | Ly Green Construction Inc, Harmony Design & Development Inc | renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.Details
renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings. | $123,000 |
| Feb 13, 2025 | Completed final sign-off May 2025 | 3524 Quintara St | Harmony Design & Development Inc | revision 202403228403- replace (e) gas water heater to gas tankless water heater. update title 24- remove hers inspections add skylight over bedroom at rear not visible from street. add parapet. update structural framingDetails
revision 202403228403- replace (e) gas water heater to gas tankless water heater. update title 24- remove hers inspections add skylight over bedroom at rear not visible from street. add parapet. update structural framing | $1,000 |
| Feb 4, 2025 | In progress issued May 2025 | 561 Anderson St | Harmony Design & Development Inc, Frederic Grasset Design-Build | 1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....Details
1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,.... | $235,000 |
| Dec 13, 2024 | Completed final sign-off Sep 2025 | 2111 21st Av | Harmony Design & Development Inc | revision to 202411044282" update holdown & anchor of threaded rods into new concrete. remove pull test specail inspection, reinforce rear 1st fl framing over crawl spaceDetails
revision to 202411044282" update holdown & anchor of threaded rods into new concrete. remove pull test specail inspection, reinforce rear 1st fl framing over crawl space | |
| Nov 15, 2024 | Completed final sign-off Dec 2024 | 561 Anderson St | Harmony Design & Development Inc | to obtain final inspection for work approved under 9419411. all work is completeDetails
to obtain final inspection for work approved under 9419411. all work is complete | |
| Nov 4, 2024 | Completed final sign-off Sep 2025 | 2111 21st Av | Harmony Design & Development Inc | residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroomDetails
residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroom | $92,000 |
| Aug 1, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | Harmony Design & Development Inc | revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.Details
revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell. | $10,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 2 Mountain Spring Av | Harmony Design & Development Inc | full guest bathroom remodelDetails
full guest bathroom remodel | $38,500 |
| May 7, 2024 | Completed final sign-off Jul 2025 | 108 Congdon St | Harmony Design & Development Inc | replace (2) 2nd floor front windows in kind, (3) 2nd floor rear windows in kind, replace (e) hardie siding at north (approx. 250 sq ft.) and west side (approx. 350 sq ft.) of property ( not facing street) in kind. all windows in the same opening.Details
replace (2) 2nd floor front windows in kind, (3) 2nd floor rear windows in kind, replace (e) hardie siding at north (approx. 250 sq ft.) and west side (approx. 350 sq ft.) of property ( not facing street) in kind. all windows in the same opening. | $43,000 |
| May 7, 2024 | Completed final sign-off Jul 2025 | 108 Congdon St | Harmony Design & Development Inc | rev 202403087403- upgrade rear framing and foundation of 1-story rear popout structure capture (e) framing condition exposed during construction revised scope of work 5/16/24-add infill crawl space exterior walls (3 sides at rear)Details
rev 202403087403- upgrade rear framing and foundation of 1-story rear popout structure capture (e) framing condition exposed during construction revised scope of work 5/16/24-add infill crawl space exterior walls (3 sides at rear) | $49,000 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 3524 Quintara St | Harmony Design & Development Inc | 1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgradesDetails
1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgrades | $121,000 |
| Mar 8, 2024 | Completed final sign-off Jul 2025 | 108 Congdon St | Harmony Design & Development Inc | residential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades.Details
residential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades. | $82,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2024 | 154 Everson St | Harmony Design & Development Inc | full bath remodel in kind.Details
full bath remodel in kind. | $34,000 |
| Feb 9, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | Harmony Design & Development Inc | revision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below.Details
revision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below. | $20,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2024 | 965 Elizabeth St | Harmony Design & Development Inc | one bathroom remodel, non structuralDetails
one bathroom remodel, non structural | $38,500 |
| Oct 17, 2023 | Completed final sign-off Jul 2024 | 166 Desmond St | Harmony Design & Development Inc | remodel (e) bathroom on 2nd fl, per plans.Details
remodel (e) bathroom on 2nd fl, per plans. | $10,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 54 Valmar Tr | Harmony Design & Development Inc | bathroom remodel in kind. kitchen remodel in kind. no structural workDetails
bathroom remodel in kind. kitchen remodel in kind. no structural work | $90,000 |
| Aug 24, 2023 | Completed final sign-off Jun 2024 | 451 Somerset St | Harmony Design & Development Inc | revision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room.Details
revision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room. | $8,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 3452 Cabrillo St | Harmony Design & Development Inc, Turley Construction | full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.Details
full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers. | $115,000 |
| May 31, 2023 | Completed final sign-off Sep 2023 | 676 Page St | Harmony Design & Development Inc | interior remodel in unit 676 page st. remodel existing bathroom (4th fl)Details
interior remodel in unit 676 page st. remodel existing bathroom (4th fl) | $12,000 |
| May 24, 2023 | Completed final sign-off May 2025 | 1779 08th Av | Harmony Design & Development Inc | revision to pa# 202302212270, construction revealed new door opening at rear ground flr wall penetrated an extg plywood shearwall. install new plywood shearwall along same wall to compensate for loss of shear strengthening.Details
revision to pa# 202302212270, construction revealed new door opening at rear ground flr wall penetrated an extg plywood shearwall. install new plywood shearwall along same wall to compensate for loss of shear strengthening. | $1,250 |
| Apr 4, 2023 | Completed final sign-off Jul 2023 | 3295 Clay St | Harmony Design & Development Inc | kitchen remodel in kind, no work to smoke detectors. no wall alteration.Details
kitchen remodel in kind, no work to smoke detectors. no wall alteration. | $62,350 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 209 Quintara St | Harmony Design & Development Inc | revision to 202210114047: no work on shear wallDetails
revision to 202210114047: no work on shear wall | |
| Mar 14, 2023 | Completed final sign-off Jun 2023 | 370 Maynard St | Harmony Design & Development Inc | one full bath remodel. in kind. no wall changes.Details
one full bath remodel. in kind. no wall changes. | $29,000 |
| Feb 21, 2023 | Completed final sign-off May 2025 | 1779 08th Av | Harmony Design & Development Inc | convert rear garage space into (2) unconditioned storage room, add bathroomDetails
convert rear garage space into (2) unconditioned storage room, add bathroom | $38,000 |
| Dec 6, 2022 | Completed final sign-off Jan 2026 | 3676 17th St | Harmony Design & Development Inc | partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.Details
partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure. | $325,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2024 | 451 Somerset St | Harmony Design & Development Inc | kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code.Details
kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code. | $82,000 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 209 Quintara St | Harmony Design & Development Inc | revision to pa 2020-0821-2317 existing ground floor structural post @ rear storage to remain, therefore no new steel beam required. seismic system to remain. reconfigure ground floor layout. proposed rear landscaping unchanged. keep concrete slab.Details
revision to pa 2020-0821-2317 existing ground floor structural post @ rear storage to remain, therefore no new steel beam required. seismic system to remain. reconfigure ground floor layout. proposed rear landscaping unchanged. keep concrete slab. | |
| Jul 12, 2022 | Completed final sign-off Feb 2024 | 650 36th Av | Harmony Design & Development Inc | revision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall.Details
revision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall. | |
| Jun 2, 2022 | Completed final sign-off Oct 2022 | 3341 Jackson St | Harmony Design & Development Inc | hallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom.Details
hallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom. | $25,000 |
| May 27, 2022 | Completed final sign-off Jul 2022 | 134 Nevada St | Harmony Design & Development Inc | bathroom remodel in-kind. no relocations, no changes to smoke detectors.Details
bathroom remodel in-kind. no relocations, no changes to smoke detectors. | $39,500 |
| May 3, 2022 | Completed final sign-off Sep 2022 | 330 Arguello Bl | Harmony Design & Development Inc | unit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers.Details
unit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers. | $45,500 |
| Apr 25, 2022 | Completed final sign-off Dec 2022 | 1860 Page St | Harmony Design & Development Inc | hallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system.Details
hallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system. | $67,000 |
| Apr 21, 2022 | Completed final sign-off Jan 2023 | 66 Bret Harte Tr | Harmony Design & Development Inc | full remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed.Details
full remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed. | $39,000 |
| Apr 21, 2022 | Completed final sign-off Oct 2022 | 1290 45th Av | Harmony Design & Development Inc | bathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers.Details
bathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers. | $34,500 |
| Mar 28, 2022 | Completed final sign-off Sep 2023 | 370 Maynard St | Harmony Design & Development Inc | 1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kindDetails
1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kind | $30,000 |
| Mar 28, 2022 | Never finaled issued Apr 2022, no final | 124 Nevada St | Harmony Design & Development Inc | bathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind.Details
bathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind. | $39,500 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 1559 Jerrold Av | Harmony Design & Development Inc | hallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire systemDetails
hallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire system | $27,000 |
| Dec 15, 2021 | Never finaled issued Jan 2022, no final | 51 Oakwood St | Harmony Design & Development Inc | full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier)Details
full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier) | $90,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 1559 Jerrold Av | Harmony Design & Development Inc | hallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system.Details
hallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system. | $30,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2024 | 650 36th Av | Harmony Design & Development Inc | interior remodel and lightwell infill.Details
interior remodel and lightwell infill. | $50,000 |
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 850 45th Av | Harmony Design & Development Inc | remodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k)Details
remodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k) | $28,400 |
| Aug 16, 2021 | Completed final sign-off Nov 2021 | 850 45th Av | Harmony Design & Development Inc | remodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers.Details
remodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers. | $34,600 |
| Jun 9, 2021 | Completed final sign-off Jan 2022 | 2114 Wawona St | Harmony Design & Development Inc | new bathroom @ 1/fDetails
new bathroom @ 1/f | $10,000 |
| Apr 29, 2021 | Completed final sign-off Feb 2022 | 2114 Wawona St | Harmony Design & Development Inc | kitchen remodel in kindDetails
kitchen remodel in kind | $43,800 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 850 Guerrero St | Harmony Design & Development Inc | remodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondaryDetails
remodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondary | $93,000 |
| Feb 24, 2021 | Completed final sign-off Aug 2021 | 3016 20th Av | Harmony Design & Development Inc | convert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated.Details
convert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated. | $29,000 |
| Feb 16, 2021 | Completed final sign-off Feb 2022 | 2114 Wawona St | Harmony Design & Development Inc | full bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan.Details
full bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan. | $28,000 |
| Feb 12, 2021 | Expired or cancelled expired Dec 2025 | 1660 Page St | Harmony Design & Development Inc | rebuild extg exterior stair of rear of extg structural with new code compliant guard rail.Details
rebuild extg exterior stair of rear of extg structural with new code compliant guard rail. | $15,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 2011 03rd St | Harmony Design & Development Inc | full bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms.Details
full bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms. | $23,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 875 South Van Ness Av | Harmony Design & Development Inc | unit 875: remodel existing bathroom & kitchen. add master bathroom.Details
unit 875: remodel existing bathroom & kitchen. add master bathroom. | $25,000 |
| Aug 21, 2020 | Never finaled issued Nov 2021, no final | 209 Quintara St | A-1 Dynamic Builders Inc., Harmony Design & Development Inc | interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath.Details
interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath. | $50,000 |