Hawk Lee
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Hawk N. Lee, P.E.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jul 2025
536 permits since 2000 (engineer on 440 permits, architect on 77 permits, authorized agent-others on 27 permits, designer on 3 permits, pmt consultant/expediter on 2 permits, attorney on 1 permit): 362 completed, 5 in progress, 73 never finaled, 96 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 536.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 333 Austin St | Western Contractors | interior remodeling on 333 austin st (2nd floor unit). relocate kitchen and remodel (e) bathroom. replace (e) water heaters with tankless water heater on ground floor.Details
interior remodeling on 333 austin st (2nd floor unit). relocate kitchen and remodel (e) bathroom. replace (e) water heaters with tankless water heater on ground floor. | $70,000 |
| Aug 19, 2024 | In progress issued Dec 2024 | 333 Valley St | Curran & Associates General Contractors | repair/replace dryrot damage studs and ceiling joist in kind. less than 50% at rear crawl space. remodeling existing bathroom and closet on basement. replace windows and french door in same opening on basement floor.Details
repair/replace dryrot damage studs and ceiling joist in kind. less than 50% at rear crawl space. remodeling existing bathroom and closet on basement. replace windows and french door in same opening on basement floor. | $50,000 |
| May 8, 2024 | In progress issued May 2024 | 539 Peralta Av | interior remodeling: add new bathroom and recreation room with bay on g/f. add new bathroom and remodel kitchen 2/f. new 1-hour fire rated wall in light well. replace (e) interior stair to new.Details
interior remodeling: add new bathroom and recreation room with bay on g/f. add new bathroom and remodel kitchen 2/f. new 1-hour fire rated wall in light well. replace (e) interior stair to new. | $80,000 | |
| Nov 18, 2022 | Completed final sign-off Sep 2023 | 292 Clipper St | Curran & Associates General Contractors | to comply w/his nov#202291046. replace (19)(e) vinyl windows w/aluminum clad wood, single hung @ front. reinforce laundry room @ rear of building, add new foundation &new exterior walls 2x4 studs (3 walls) @ rear of building, repair (e) exteior siding as needed less than 50%Details
to comply w/his nov#202291046. replace (19)(e) vinyl windows w/aluminum clad wood, single hung @ front. reinforce laundry room @ rear of building, add new foundation &new exterior walls 2x4 studs (3 walls) @ rear of building, repair (e) exteior siding as needed less than 50% | $50,000 |
| Oct 5, 2022 | Never finaled filed Oct 2022, never issued | 706 Oak St | add two accessory dwelling unit to ground floor storage per odinance 162-16,162-17, seusnuc retrofit compliance under application#20180914086. ground floor: sprinkler(under separate permit) ground floor, 2 adu and exit path to street per fs-05 comply with nfpa 13.Details
add two accessory dwelling unit to ground floor storage per odinance 162-16,162-17, seusnuc retrofit compliance under application#20180914086. ground floor: sprinkler(under separate permit) ground floor, 2 adu and exit path to street per fs-05 comply with nfpa 13. | $280,000 | |
| Aug 1, 2022 | Completed final sign-off Sep 2022 | 643 Chenery St | Curran & Associates General Contractors | to comply with nov202290557: repair rear stairs in-kind over 50% as shown on plans. replace all dryrot stair stingers, tread, riser, guard rails, landings and handrails.Details
to comply with nov202290557: repair rear stairs in-kind over 50% as shown on plans. replace all dryrot stair stingers, tread, riser, guard rails, landings and handrails. | $10,000 |
| May 2, 2022 | Expired or cancelled expired Apr 2026 | 65 San Fernando Wy | Nbay Construction And Remodeling Inc | remodeling entire house, remodel kitchen and bathroom, open kitchen design, 1 new bathroom and remode 2 bathroom on 2nd floor. 1/2 bathroom on 1st floor. remodel bathroom in basement. replace all sheet rock with 5/8 type x. replace existing window in kind. replace garage door to 8' wide.Details
remodeling entire house, remodel kitchen and bathroom, open kitchen design, 1 new bathroom and remode 2 bathroom on 2nd floor. 1/2 bathroom on 1st floor. remodel bathroom in basement. replace all sheet rock with 5/8 type x. replace existing window in kind. replace garage door to 8' wide. | $80,000 |
| Jan 27, 2022 | Never finaled issued Sep 2022, no final | 2047 15th St | reinforce (e) retaining walls and new concrete slab on grade in basement. ref 202005207660.Details
reinforce (e) retaining walls and new concrete slab on grade in basement. ref 202005207660. | $20,000 | |
| Jan 4, 2022 | In progress issued Feb 2026 | 1335 Clay St | comply w/planning violation #2018-001512ef. legalize (e) in-law unit #16 at rear of ground fl per ord 43-14. sprinkler 1st fl in-law & exit path under sep. permit per fs-05 & nfpa13. soft story under pa# 201510089218 to be reinstated. (adu permit for unit #17 under pa# 202008192119).Details
comply w/planning violation #2018-001512ef. legalize (e) in-law unit #16 at rear of ground fl per ord 43-14. sprinkler 1st fl in-law & exit path under sep. permit per fs-05 & nfpa13. soft story under pa# 201510089218 to be reinstated. (adu permit for unit #17 under pa# 202008192119). | $100,000 | |
| Nov 29, 2021 | Completed final sign-off Feb 2026 | 1947 31st Av | Winwin Construction Inc | voluntary soft story seismic retrofit per ab094, 2019 cebc appendix 4a. two floor horizontal addition. 2nd fl add 245 sqft, remodel 2 (n) bathroom, living room, kitchen, add 2 bathroom. relocate living room, dining, kitchen. ground fl add 418 sqft rear storage room. ground floor add 451 sqft.Details
voluntary soft story seismic retrofit per ab094, 2019 cebc appendix 4a. two floor horizontal addition. 2nd fl add 245 sqft, remodel 2 (n) bathroom, living room, kitchen, add 2 bathroom. relocate living room, dining, kitchen. ground fl add 418 sqft rear storage room. ground floor add 451 sqft. | $100,000 |
| Oct 26, 2021 | Completed final sign-off Jan 2024 | 3287 Cesar Chavez St | Max Construction | comply w/ nov# 2021799936. grd flr only- obtain occupancy use permit for dry clean drop off and pick up service with no on site processing equip. install (n) accessible business entrance, provide 2 hour ceiling separation between residential & commercial...Details
comply w/ nov# 2021799936. grd flr only- obtain occupancy use permit for dry clean drop off and pick up service with no on site processing equip. install (n) accessible business entrance, provide 2 hour ceiling separation between residential & commercial... | $15,000 |
| Aug 25, 2021 | Completed final sign-off Jun 2022 | 597 02nd Av | revision to pa 2020-0219-4832. replae three (e) pier footings and posts @ (e) location underpin 8'-6" (e) north property line foundation per planDetails
revision to pa 2020-0219-4832. replae three (e) pier footings and posts @ (e) location underpin 8'-6" (e) north property line foundation per plan | ||
| Aug 2, 2021 | Completed final sign-off Feb 2022 | 737 Guerrero St | Future General Construction Inc | remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rearDetails
remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rear | $45,000 |
| Jul 1, 2021 | Completed final sign-off Mar 2022 | 1247 46th Av | rev pa201909192079: delete and move center retiaining wall to north p|l.replace 2 -ssw at rear wall with new shear wall; replace rear access door to 3|0 x 6/8 door at nw corner. add access concrete steps.Details
rev pa201909192079: delete and move center retiaining wall to north p|l.replace 2 -ssw at rear wall with new shear wall; replace rear access door to 3|0 x 6/8 door at nw corner. add access concrete steps. | ||
| Jun 10, 2021 | Completed final sign-off Oct 2021 | 1215 Rhode Island St | comply with nov202175541.replace dry rot damaged exterior wall studes (3 walls) in-kind at rear of the buliding. exterior siding to remain.Details
comply with nov202175541.replace dry rot damaged exterior wall studes (3 walls) in-kind at rear of the buliding. exterior siding to remain. | $2,000 | |
| Mar 9, 2021 | Never finaled issued Jan 2022, no final | 1689 17th Av | interior remodeling on 2nd floors and new rear decks on 1st and 2nd floor. remodeling include: add new master bedroom, bathroom, media room and remodel 2 existing bath on 2nd floor.Details
interior remodeling on 2nd floors and new rear decks on 1st and 2nd floor. remodeling include: add new master bedroom, bathroom, media room and remodel 2 existing bath on 2nd floor. | $60,000 | |
| Feb 17, 2021 | Expired or cancelled cancelled Jan 2026 | 39 Bella Vista Wy | interior remodeling: new basement foundation wall and open connecting stair ground floor to basement storage.Details
interior remodeling: new basement foundation wall and open connecting stair ground floor to basement storage. | $20,000 | |
| Feb 17, 2021 | Completed final sign-off Aug 2022 | 1712 Bryant St | remodel existing kitchen and bathroom. add new bathroom, remove bearing wall between kitchen and dining room on 2nd, 3rd and 4th floors.Details
remodel existing kitchen and bathroom. add new bathroom, remove bearing wall between kitchen and dining room on 2nd, 3rd and 4th floors. | $50,000 | |
| Nov 17, 2020 | Completed final sign-off Oct 2021 | 904 Rhode Island St | rear yard (n) retianing wall replacement.Details
rear yard (n) retianing wall replacement. | $15,000 | |
| Nov 17, 2020 | Never finaled issued Dec 2020, no final | 30 Edgar Av | cripple wall seismic retrofit-california bolt plus program. prescriptive cripple wall strengthening and sf voluntary soft story seismic retrofit ab-0940/methord 2019 cebc apendix 4a.Details
cripple wall seismic retrofit-california bolt plus program. prescriptive cripple wall strengthening and sf voluntary soft story seismic retrofit ab-0940/methord 2019 cebc apendix 4a. | $20,000 | |
| Oct 3, 2020 | Expired or cancelled cancelled Jul 2023 | 76 Conkling St | voluntary soft-story retrofit per ab-094 method - 2019 iebc appendex 4a.Details
voluntary soft-story retrofit per ab-094 method - 2019 iebc appendex 4a. | $10,000 | |
| Oct 1, 2020 | Completed final sign-off Jul 2021 | 138 Wetmore St | revision to pa 201906032276. as built plan. (n) trash storage area @ g/f. (n) storage area under stair. (n) concrete steps & landing @ rear yard. enlarge bath #2. relocate closets at bedroom #2. (n) closet at bedroom #3. relocate waterheater & furnace.Details
revision to pa 201906032276. as built plan. (n) trash storage area @ g/f. (n) storage area under stair. (n) concrete steps & landing @ rear yard. enlarge bath #2. relocate closets at bedroom #2. (n) closet at bedroom #3. relocate waterheater & furnace. | ||
| Sep 26, 2020 | Completed final sign-off Mar 2022 | 194 Valmar Tr | replace (e) rear g/f windows with (n) alum-wood clad windows and 1 door at rear of building. (n) concrete landing and stop on grade.Details
replace (e) rear g/f windows with (n) alum-wood clad windows and 1 door at rear of building. (n) concrete landing and stop on grade. | $6,000 | |
| Aug 19, 2020 | In progress issued Jan 2026 | 1335 Clay St | Occidental Express | comply w/planning violation #2018-001512ef. add 1 adu w/1 bedrm & 1 bath, unit #17 at ground fl. (legalize in-law unit #16 at rear of g/f under sep. permit pa# 202201045352). sprinkler g/f adu unit #15 & exit path under sep permit per fs-05 & nfpa 13. soft story pa# 201510089218 to be reinstated.Details
comply w/planning violation #2018-001512ef. add 1 adu w/1 bedrm & 1 bath, unit #17 at ground fl. (legalize in-law unit #16 at rear of g/f under sep. permit pa# 202201045352). sprinkler g/f adu unit #15 & exit path under sep permit per fs-05 & nfpa 13. soft story pa# 201510089218 to be reinstated. | $60,000 |
| Jun 1, 2020 | Expired or cancelled cancelled Nov 2024 | 597 02nd Av | accesory unit addition on ground flr per ab094 & ordinance 162-16. two bedroom, two bathroom, living rm & kitchen on ground flr.Details
accesory unit addition on ground flr per ab094 & ordinance 162-16. two bedroom, two bathroom, living rm & kitchen on ground flr. | $90,000 | |
| Feb 19, 2020 | Completed final sign-off May 2022 | 597 02nd Av | voluntary seismic strengthening under administrative bulletin ab-094Details
voluntary seismic strengthening under administrative bulletin ab-094 | $45,000 | |
| Dec 10, 2019 | Completed final sign-off Aug 2022 | 1137 Potrero Av | new accessory unit addition on ground flr per ab094 and ordinance 162-16. (2) bedrooms, (2) bathrooms, living rm & kitchen on ground flr.Details
new accessory unit addition on ground flr per ab094 and ordinance 162-16. (2) bedrooms, (2) bathrooms, living rm & kitchen on ground flr. | $80,000 | |
| Nov 12, 2019 | Completed final sign-off Jan 2022 | 3000 Sacramento St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201712061Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201712061 | $40,000 | |
| Nov 7, 2019 | Completed final sign-off Dec 2019 | 1401 Waller St | Beyond The Horizon Construction | revision to approve soft story retrofit #201710191681. add missing shear wall at line a, b in garage. add shear wall on line 1 between b and c. add shear wall on line c between 2 and 3.Details
revision to approve soft story retrofit #201710191681. add missing shear wall at line a, b in garage. add shear wall on line 1 between b and c. add shear wall on line c between 2 and 3. | |
| Oct 3, 2019 | Completed final sign-off Apr 2022 | 1137 Potrero Av | voluntary seismic retrofiting per ab-094Details
voluntary seismic retrofiting per ab-094 | $50,000 | |
| Sep 19, 2019 | Completed final sign-off Mar 2022 | 1247 46th Av | Rinaldi Construction | voluntary seismic upgrade per ab-094. replace foundation under extg front bldg crawl space in sections.Details
voluntary seismic upgrade per ab-094. replace foundation under extg front bldg crawl space in sections. | $60,000 |
| Sep 16, 2019 | Completed final sign-off Feb 2020 | 65 De Soto St | comply w/planning enf case no.2019-006466enf & bid nov 201950091. front facade: remove vinyl door, install n wood french door w/divided lights, limited dryrot repair & installation of n wall framing & stucco (to match e in material, texture & finish). restore wood porch posts, roof & flring to kind.Details
comply w/planning enf case no.2019-006466enf & bid nov 201950091. front facade: remove vinyl door, install n wood french door w/divided lights, limited dryrot repair & installation of n wall framing & stucco (to match e in material, texture & finish). restore wood porch posts, roof & flring to kind. | $5,000 | |
| Sep 12, 2019 | Never finaled filed Sep 2019, never issued | 221 Downey St | legalize in-law per ord# 43-14 unit #4 on ground flr behind (e) garage as shown on plan.Details
legalize in-law per ord# 43-14 unit #4 on ground flr behind (e) garage as shown on plan. | $20,000 | |
| Jul 11, 2019 | Completed final sign-off Jun 2021 | 719 Fillmore St | J Reilly Construction | add two accessory dwelling unit on ground fl per ordinance 162-16. retrofit under permit application #201609157832Details
add two accessory dwelling unit on ground fl per ordinance 162-16. retrofit under permit application #201609157832 | $90,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2024 | 9 Roscoe St | G B U Construction Development | horizontal at 3/f. interior remodelDetails
horizontal at 3/f. interior remodel | $150,000 |
| Jun 21, 2019 | Expired or cancelled expired Oct 2022 | 3334 San Bruno Av | mandatory soft-story compliance. method 2016 cebc appendix 4a. mandatory seismic retrofit per sfbc chap 4d. building reinforcement on ground flr. annd (n) shear walls, hold-downs, and sill anchor bolts. install 2 steel ordinary moment frame at lines 1 and 6.Details
mandatory soft-story compliance. method 2016 cebc appendix 4a. mandatory seismic retrofit per sfbc chap 4d. building reinforcement on ground flr. annd (n) shear walls, hold-downs, and sill anchor bolts. install 2 steel ordinary moment frame at lines 1 and 6. | $80,000 | |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 964 Howard St | Curran & Associates General Contractors | interior room remodeling on 3 flrs. reframe entry door and add auto door opener to entry door. add (n) auto disable chair lift from entry to 1st flr and lobby. (n) stair at lobby. add new bathrooms.Details
interior room remodeling on 3 flrs. reframe entry door and add auto door opener to entry door. add (n) auto disable chair lift from entry to 1st flr and lobby. (n) stair at lobby. add new bathrooms. | $563,500 |
| Jun 21, 2019 | Completed final sign-off Jul 2019 | 2240 Chestnut St | comply w/ n.o.v 201886751. obtain permit for sound barrier installed on roof at the request of sfhd. work requires.Details
comply w/ n.o.v 201886751. obtain permit for sound barrier installed on roof at the request of sfhd. work requires. | $5,000 | |
| Jun 3, 2019 | Never finaled filed Jun 2019, never issued | 700 Shields St | rear addition. three floors rear addition to existing building. add bedrooms & baths.Details
rear addition. three floors rear addition to existing building. add bedrooms & baths. | $300,000 | |
| Jun 3, 2019 | Completed final sign-off Aug 2021 | 138 Wetmore St | to comply with nov 201956121. int remodeling on 2 flrs - remodel bath & kitchen in same location. remove int walls as shown to provide open flr plan. remove dry rot fl. fl sheathing and replace with concrete slab fur fl, replace lath/plaster finish add new bath, remodel (e) bath, reconfigure bedrms.Details
to comply with nov 201956121. int remodeling on 2 flrs - remodel bath & kitchen in same location. remove int walls as shown to provide open flr plan. remove dry rot fl. fl sheathing and replace with concrete slab fur fl, replace lath/plaster finish add new bath, remodel (e) bath, reconfigure bedrms. | $60,000 | |
| Feb 19, 2019 | Completed final sign-off Mar 2023 | 166 Del Monte St | repalce (e) wood posts, wood beam & pier ft'g with steal posts & beam on ground floorDetails
repalce (e) wood posts, wood beam & pier ft'g with steal posts & beam on ground floor | $10,000 | |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 3229 Harrison St | infill (e) sunroom on g/f rear for added family room. new rear deck on grade with 42in firewall.Details
infill (e) sunroom on g/f rear for added family room. new rear deck on grade with 42in firewall. | $60,000 | |
| Nov 9, 2018 | Never finaled issued Jan 2020, no final | 522 29th Av | Zarc Construction Inc | legalize unit on ground flr behind garage w/ family room, kitchen, bathroom and bedroom per ord# 43-14. to comply w/ nov# 201869831.Details
legalize unit on ground flr behind garage w/ family room, kitchen, bathroom and bedroom per ord# 43-14. to comply w/ nov# 201869831. | $10,000 |
| Oct 30, 2018 | Completed final sign-off Dec 2018 | 215 San Jose Av | revision to 201707202419 soft story retrofit. change 2 simpson bolted steel moment frames to 1 omf on line #5 and chang momement frame to 2 each simpson ssw18-7 at line #1 at garage door opening and revise foundatoin plan, shear walls and hd as shown on plansDetails
revision to 201707202419 soft story retrofit. change 2 simpson bolted steel moment frames to 1 omf on line #5 and chang momement frame to 2 each simpson ssw18-7 at line #1 at garage door opening and revise foundatoin plan, shear walls and hd as shown on plans | ||
| Oct 16, 2018 | Completed final sign-off Sep 2019 | 719 Fillmore St | revision to 201609157832 soft story retrofit change grade beam to l footing at line 1, 2, 3. revised foundation plan, shear walls, holddowns as shown on plansDetails
revision to 201609157832 soft story retrofit change grade beam to l footing at line 1, 2, 3. revised foundation plan, shear walls, holddowns as shown on plans | ||
| Sep 21, 2018 | Completed final sign-off Sep 2021 | 2401 Fillmore St | mandatory soft story to comply with 2016 cebc appx a4 mandatory seismic retrofit per sfbc chapter 4d commercial residential pa# 201809211037Details
mandatory soft story to comply with 2016 cebc appx a4 mandatory seismic retrofit per sfbc chapter 4d commercial residential pa# 201809211037 | $10,000 | |
| Sep 17, 2018 | Expired or cancelled expired May 2026 | 6340 Geary Bl | commerical mandatory soft story retrofit method of compliance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new ada bathroom.Details
commerical mandatory soft story retrofit method of compliance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new ada bathroom. | $10,000 | |
| Sep 17, 2018 | Expired or cancelled expired May 2026 | 6340 Geary Bl | residential mandatory soft story retrofit per sfebc chapter 4d engineering criteria methof of compliance 2016 cebc appendix a-4.Details
residential mandatory soft story retrofit per sfebc chapter 4d engineering criteria methof of compliance 2016 cebc appendix a-4. | $50,000 | |
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 265 Corona St | Curran & Associates General Contractors | add (n) bathroom and wet bar on 1st floor and remodel existing bathroom in same location on 2nd floor per plans. rear window @ bathroom (2nd floor) to be replaced (max u-factor .32) .Details
add (n) bathroom and wet bar on 1st floor and remodel existing bathroom in same location on 2nd floor per plans. rear window @ bathroom (2nd floor) to be replaced (max u-factor .32) . | $35,000 |
| Jun 5, 2018 | Expired or cancelled expired Oct 2019 | 54 Cook St | new rear deck on 2nd floor and replace rear windows to patio door.Details
new rear deck on 2nd floor and replace rear windows to patio door. | $10,000 | |
| Jun 5, 2018 | Completed final sign-off Aug 2018 | 2221 Larkin St | Beyond The Horizon Construction | revision to pa 2016-0810-4733 revise building reinforcement on basement cripple walls & 1st fl. add shear walls. hold down, anchor bolts change shearwalls to simpson strong wall @ line d & e change all bolting to simpson urfp & frfp anchors line d & e as shown on plansDetails
revision to pa 2016-0810-4733 revise building reinforcement on basement cripple walls & 1st fl. add shear walls. hold down, anchor bolts change shearwalls to simpson strong wall @ line d & e change all bolting to simpson urfp & frfp anchors line d & e as shown on plans | |
| May 29, 2018 | Completed final sign-off Feb 2019 | 50 Stanyan St | revision to app#201607132184. soft story retrofit. bldg reinforcement on ground floor, revisided shear walls, hold downs, anchor sill bolting to foundation. change 4 steel poles to 2 larger new omf #1 and #2 line 1 & revise foundation plan, shearwalls and hold down on plan typical.Details
revision to app#201607132184. soft story retrofit. bldg reinforcement on ground floor, revisided shear walls, hold downs, anchor sill bolting to foundation. change 4 steel poles to 2 larger new omf #1 and #2 line 1 & revise foundation plan, shearwalls and hold down on plan typical. | ||
| May 10, 2018 | Completed final sign-off Feb 2019 | 414 34th Av | Jakcon, Inc | wood beam, posts and pier footing replacement on ground floorDetails
wood beam, posts and pier footing replacement on ground floor | $10,000 |
| May 10, 2018 | Completed final sign-off Nov 2018 | 281 Urbano Dr | bathroom remodeling witn (n) window to match adjacent rear windowDetails
bathroom remodeling witn (n) window to match adjacent rear window | $8,000 | |
| May 10, 2018 | Completed final sign-off Jul 2018 | 329 24th Av | revision to soft story pa 2016-1114-2655 - bldg reinforcement on ground fl. increase size of 2 (n) ordinary steal moment frame #1 & 2, connection detail & foundations @ front & rear garage openings, delete shearwalls. increase hold down sizes @ (e) shear walls to foundation as shown on plansDetails
revision to soft story pa 2016-1114-2655 - bldg reinforcement on ground fl. increase size of 2 (n) ordinary steal moment frame #1 & 2, connection detail & foundations @ front & rear garage openings, delete shearwalls. increase hold down sizes @ (e) shear walls to foundation as shown on plans | ||
| Apr 24, 2018 | Never finaled issued Apr 2018, no final | 35 Conrad St | replace partial foundation at basement floorDetails
replace partial foundation at basement floor | $20,000 | |
| Mar 27, 2018 | Completed final sign-off Oct 2018 | 626 Monterey Bl | Topline Builders Corp | interior remodeling: relocate bathroom and remodel kitchen on 3/f. remove bearing wall and replace with wood beam & posts btween living room and kitchen.Details
interior remodeling: relocate bathroom and remodel kitchen on 3/f. remove bearing wall and replace with wood beam & posts btween living room and kitchen. | $30,000 |
| Mar 27, 2018 | Completed final sign-off Jun 2019 | 441 Wilde Av | interior remodeling & partial foundation replacement. two (n) bedrooms and a bathroom at basement floor. relocate living room & bedroom, remodel kitchen & add (n) bathroom at 1st fl. to comply with nov# 201853691Details
interior remodeling & partial foundation replacement. two (n) bedrooms and a bathroom at basement floor. relocate living room & bedroom, remodel kitchen & add (n) bathroom at 1st fl. to comply with nov# 201853691 | $45,000 | |
| Mar 12, 2018 | Never finaled issued Dec 2018, no final | 1383 44th Av | adu additon on ground flr per ord# 162-16. one bedroom, bathroom, living rm, media rm and kitchen. soft story under pa# 201707061087.Details
adu additon on ground flr per ord# 162-16. one bedroom, bathroom, living rm, media rm and kitchen. soft story under pa# 201707061087. | $50,000 | |
| Jan 22, 2018 | Completed final sign-off Jan 2019 | 630 Vermont St | 2nd fl unit is being expanded into the 1st fl garage. open stair connection between the units along with bedrooms, bathrooms and a wetbar.Details
2nd fl unit is being expanded into the 1st fl garage. open stair connection between the units along with bedrooms, bathrooms and a wetbar. | $150,000 | |
| Dec 21, 2017 | Completed final sign-off Dec 2017 | 3655 Fillmore St | revision to 201701247773, soft story compliance, relocate shearwallDetails
revision to 201701247773, soft story compliance, relocate shearwall | ||
| Dec 20, 2017 | Completed final sign-off Jul 2018 | 1600 Ortega St | L & G Construction | remodel extg bedroom and bathroom on ground floor. replace wood beam with steel beam and posts. new skylight on 2nd floor.Details
remodel extg bedroom and bathroom on ground floor. replace wood beam with steel beam and posts. new skylight on 2nd floor. | $40,000 |
| Dec 19, 2017 | Completed final sign-off Feb 2021 | 427 Princeton St | relocate bathroom & add new bedroom on ground floor. remodel kitchen & bath on 2nd floor. remove bearing wall between kitchen & living room. new deck & stair @ rear of the bldg. (deck height not to exceed 10'-0").Details
relocate bathroom & add new bedroom on ground floor. remodel kitchen & bath on 2nd floor. remove bearing wall between kitchen & living room. new deck & stair @ rear of the bldg. (deck height not to exceed 10'-0"). | $45,000 | |
| Dec 19, 2017 | Expired or cancelled expired Oct 2019 | 54 Cook St | int remodeling on both units - add (n) bathroom @ 2nd & 3rd floor. ground floor remodeling on 54 cook street - add media room & master bedroom & 1-1/2 bathroom, foundation replacement. bar sink not permitted (e.o. comment made by planning department. 12/19/2017) on ground floor.Details
int remodeling on both units - add (n) bathroom @ 2nd & 3rd floor. ground floor remodeling on 54 cook street - add media room & master bedroom & 1-1/2 bathroom, foundation replacement. bar sink not permitted (e.o. comment made by planning department. 12/19/2017) on ground floor. | $80,000 | |
| Dec 14, 2017 | Completed final sign-off Feb 2019 | 194 Maddux Av | interior remodel on 2nd fl only. remodel e kitchen, e bath. add new full bath, remove bearing wall between kitchen and living rm. convert dining room to bedroom.Details
interior remodel on 2nd fl only. remodel e kitchen, e bath. add new full bath, remove bearing wall between kitchen and living rm. convert dining room to bedroom. | $45,000 | |
| Dec 7, 2017 | Completed final sign-off Dec 2018 | 79 Ellington Av | revision to 201404294453, relocate rear exterior stairDetails
revision to 201404294453, relocate rear exterior stair | ||
| Dec 7, 2017 | Completed final sign-off Feb 2019 | 192 Maddux Av | unit legalization per ord 43-14 on ground flr. (2) bdrms & bathroom on ground flr.Details
unit legalization per ord 43-14 on ground flr. (2) bdrms & bathroom on ground flr. | $51,000 | |
| Nov 21, 2017 | Completed final sign-off Nov 2019 | 2905 Jennings St | unit legalization per ordinance 43-14 on ground floor, legalize kitchen as shown on plan for new unit. new unit has 3 bedrooms & 2 bathrooms. demolish unpermitted shed on lot.Details
unit legalization per ordinance 43-14 on ground floor, legalize kitchen as shown on plan for new unit. new unit has 3 bedrooms & 2 bathrooms. demolish unpermitted shed on lot. | $25,750 | |
| Oct 31, 2017 | Completed final sign-off Dec 2023 | 313 30th St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add (n) ordinary moment frame @ front & rear of garage opening, shear walls, anchor bolts to foundation as shown on plans.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add (n) ordinary moment frame @ front & rear of garage opening, shear walls, anchor bolts to foundation as shown on plans. | $49,000 | |
| Oct 31, 2017 | Completed final sign-off Feb 2018 | 1049 Pacific Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add shear walls, anchor sill bolting, hold down to foundation as shown on plan. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add shear walls, anchor sill bolting, hold down to foundation as shown on plan. n/a ordinance #155-13 | $45,000 | |
| Oct 26, 2017 | Completed final sign-off Oct 2018 | 670 Mangels Av | revision to pa #201708013493. add new bathroom & media room on ground fl.Details
revision to pa #201708013493. add new bathroom & media room on ground fl. | ||
| Oct 19, 2017 | Completed final sign-off Dec 2019 | 1401 Waller St | Beyond The Horizon Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on g/f. add (n) shear walls hold owns & sill anchor bolts per plan. install 1 steel ordinary moment frame.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on g/f. add (n) shear walls hold owns & sill anchor bolts per plan. install 1 steel ordinary moment frame. | $40,000 |
| Oct 6, 2017 | Expired or cancelled expired Dec 2019 | 35 Conrad St | J A K Construction | interior alteration to an (e) single family residence including 1/f bathroom remodel with new shower, 2/f bathroom fixture replacement. no exterior work or change in sq.ft.Details
interior alteration to an (e) single family residence including 1/f bathroom remodel with new shower, 2/f bathroom fixture replacement. no exterior work or change in sq.ft. | $15,000 |
| Oct 3, 2017 | Expired or cancelled expired Feb 2023 | 3366 22nd St | commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add automatic door opener and sign (handicap).Details
commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add automatic door opener and sign (handicap). | $12,000 | |
| Oct 3, 2017 | Completed final sign-off Dec 2019 | 2355 Francisco St | Bai Construction | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add 3 each ordinary moment frame in garage openings with (n) grade beams. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, building reinforcement on g/f, add 3 each ordinary moment frame in garage openings with (n) grade beams. n/a ordinance #155-13 | $45,000 |
| Oct 3, 2017 | Expired or cancelled expired Feb 2023 | 3364 22nd St | residential- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
residential- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $45,000 | |
| Sep 26, 2017 | Completed final sign-off Nov 2019 | 1916 Folsom St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. building reinforcement on ground fl, add (n) grade beams, shearwalls, holddowns & sill anchor bolts per plans. maher naDetails
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. building reinforcement on ground fl, add (n) grade beams, shearwalls, holddowns & sill anchor bolts per plans. maher na | $40,000 | |
| Sep 26, 2017 | Completed final sign-off Oct 2017 | 1050 Noriega St | administrative revision per inspector request to pa #2016-0726-3436. to correct scope description, reconfigure kitchen & bedroom, remodel (e) bath & add one (n) bath & powder rm on 2nd fl. add (n) bath at attic floor.Details
administrative revision per inspector request to pa #2016-0726-3436. to correct scope description, reconfigure kitchen & bedroom, remodel (e) bath & add one (n) bath & powder rm on 2nd fl. add (n) bath at attic floor. | ||
| Sep 26, 2017 | Completed final sign-off Nov 2019 | 1910 Folsom St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. building reinforcement on ground fl, add (n) grade beams, shearwalls, holddowns & sill anchor bolts per plans. maher naDetails
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. building reinforcement on ground fl, add (n) grade beams, shearwalls, holddowns & sill anchor bolts per plans. maher na | $40,000 | |
| Sep 12, 2017 | Completed final sign-off Jan 2020 | 278 27th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on ground floor, add (n) shearwall holddown and sill anchor bolts per plans. install 2 steel ordinary moment frame.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on ground floor, add (n) shearwall holddown and sill anchor bolts per plans. install 2 steel ordinary moment frame. | $70,000 | |
| Sep 11, 2017 | Never finaled issued Nov 2020, no final | 1730 Hyde St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 maher not reqDetails
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 maher not req | $60,000 | |
| Sep 5, 2017 | Completed final sign-off Mar 2019 | 112 Parnassus Av | Sft Construction Corp | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $45,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2019 | 1945 Pacific Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on ground floor, add (n) shearwalls, hold downs and sill anchor bolts per plans.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. bldg reinforcement on ground floor, add (n) shearwalls, hold downs and sill anchor bolts per plans. | $70,000 | |
| Aug 31, 2017 | Completed final sign-off Oct 2017 | 809 Kirkham St | remove dry rotted juliet balcony and patch n stucco to match e stucco as neededDetails
remove dry rotted juliet balcony and patch n stucco to match e stucco as needed | $1,500 | |
| Aug 30, 2017 | Completed final sign-off Jan 2020 | 1831 Larkin St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 bld reinforcement on ground floor add new shear walls, holddowns, and sill anchor bolts per plan. install structural steel cantilevered pole framesDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 bld reinforcement on ground floor add new shear walls, holddowns, and sill anchor bolts per plan. install structural steel cantilevered pole frames | $70,000 | |
| Aug 24, 2017 | Completed final sign-off Feb 2021 | 1010 Anza St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 | |
| Aug 22, 2017 | Completed final sign-off Nov 2018 | 1100 Cabrillo St | garage roof deck reinforcement and add 42" galv gaurd railDetails
garage roof deck reinforcement and add 42" galv gaurd rail | $20,000 | |
| Aug 15, 2017 | Completed final sign-off Oct 2017 | 370 23rd Av | remove 3 north side dryrot deck on 2 floors, remove dryrot wood siding and replace with hardi plank siding where decks are removed, replace window at deck and replace door to deck with new marvin infinity series wood clad windows in same opening.Details
remove 3 north side dryrot deck on 2 floors, remove dryrot wood siding and replace with hardi plank siding where decks are removed, replace window at deck and replace door to deck with new marvin infinity series wood clad windows in same opening. | $30,000 | |
| Aug 8, 2017 | Completed final sign-off Dec 2017 | 2310 46th Av | interior remodeling - add media room & relocated bathroom on ground floor. add 1/2 bath and remodel (e) bath & kitchen. reconfigure interior connecting stair to 2nd floor. legalize (e) family room, bedroom and bathroom @ ground floorDetails
interior remodeling - add media room & relocated bathroom on ground floor. add 1/2 bath and remodel (e) bath & kitchen. reconfigure interior connecting stair to 2nd floor. legalize (e) family room, bedroom and bathroom @ ground floor | $50,000 | |
| Aug 1, 2017 | Completed final sign-off Oct 2018 | 670 Mangels Av | interior remodel: add (n) master bedroom & bathroom on ground fl.remodel kitchen on 2nd fl. repair & replace damaged stair and deck at rear (dryrot).Details
interior remodel: add (n) master bedroom & bathroom on ground fl.remodel kitchen on 2nd fl. repair & replace damaged stair and deck at rear (dryrot). | $80,000 | |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 4601 25th St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendixt a-4; add hold down anchor bolts/verify shear walls/(e) ordinary moment frame.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendixt a-4; add hold down anchor bolts/verify shear walls/(e) ordinary moment frame. | $40,000 | |
| Jul 18, 2017 | Completed final sign-off Oct 2018 | 528 27th St | soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans.Details
soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans. | $30,000 | |
| Jul 18, 2017 | Completed final sign-off Oct 2018 | 524 27th St | soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement in crawl space & ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans.Details
soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement in crawl space & ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans. | $30,000 | |
| Jul 14, 2017 | Completed final sign-off Feb 2019 | 1460 Sutter St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendiz a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendiz a-4. | $80,000 | |
| Jul 11, 2017 | Completed final sign-off Mar 2018 | 515 22nd Av | new rear deck with fire wall, height of fire wall not to exceed a maximun height of 10'Details
new rear deck with fire wall, height of fire wall not to exceed a maximun height of 10' | $15,000 | |
| Jul 6, 2017 | Completed final sign-off Mar 2018 | 2760 Sutter St | soft story compliance, method 2016 cebc appendix 4a madatory seismic retrofit per sfebc chapter 4d. building reincorcement gr fl, new shearwall, hold downs, sill anchor bolts per plans. install 1 steel ordinary moment frameDetails
soft story compliance, method 2016 cebc appendix 4a madatory seismic retrofit per sfebc chapter 4d. building reincorcement gr fl, new shearwall, hold downs, sill anchor bolts per plans. install 1 steel ordinary moment frame | $80,000 | |
| Jul 6, 2017 | Expired or cancelled expired Aug 2019 | 1383 44th Av | soft story compliance, method 2016 cebc appendix 4a madatory seismic retrofit per sfbc chapter 40. building reincorcement gr fl, new steel ordinary moment frame @ front of garage opening w/new foundation, shearwall, hold downs, sill anchor bolts per plans.Details
soft story compliance, method 2016 cebc appendix 4a madatory seismic retrofit per sfbc chapter 40. building reincorcement gr fl, new steel ordinary moment frame @ front of garage opening w/new foundation, shearwall, hold downs, sill anchor bolts per plans. | $40,000 | |
| Jun 29, 2017 | Completed final sign-off May 2018 | 1748 Larkin St | story story compliance: method 2016 cebc appendix 4a. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on gorund flr; add (n) shear walls, holdowns, & install 1 steel simpson strong wall frame.Details
story story compliance: method 2016 cebc appendix 4a. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on gorund flr; add (n) shear walls, holdowns, & install 1 steel simpson strong wall frame. | $30,000 | |
| Jun 20, 2017 | Completed final sign-off Feb 2018 | 1839 14th Av | Hubert Penny | remove non bearing wall to make master bed & remodel bath on 1st. convert 1/2 bath into full bathroom & closet on lower floor. remodel kitchen, bathroom on 2nd flr. repair & replace rear deck in kind, replace front (e) windows with alumn wood clad windows in same locations & sizesDetails
remove non bearing wall to make master bed & remodel bath on 1st. convert 1/2 bath into full bathroom & closet on lower floor. remodel kitchen, bathroom on 2nd flr. repair & replace rear deck in kind, replace front (e) windows with alumn wood clad windows in same locations & sizes | $40,000 |
| Jun 20, 2017 | Never finaled filed Jun 2017, never issued | 1453 Rhode Island St | legalization of dwelling unit installed w/o permit on grd flr under ord 43-14. all interior grd flr remodeling; bath, bar sink, install under pa #2003-1231-3257 rvised under pa #2007-0606-3229 cert of final completion and occupancy under pa #2006-1102-6719.Details
legalization of dwelling unit installed w/o permit on grd flr under ord 43-14. all interior grd flr remodeling; bath, bar sink, install under pa #2003-1231-3257 rvised under pa #2007-0606-3229 cert of final completion and occupancy under pa #2006-1102-6719. | $17,350 |