Block 6581, lot 053
524 27th St
- City’s use
- Multi-Family Residential
- Built
- 1969
- Stories
- 2
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 8,568 sq ft
- Lot
- 8,550 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off Mar 2026 | 524 27th St | Mc Cormick Construction | change (3) 30" 2x6 in like kind on exterior walkway. remove and replace 4x10 in stairway opening in like kind.Details
change (3) 30" 2x6 in like kind on exterior walkway. remove and replace 4x10 in stairway opening in like kind. | $1,500 |
| Jan 27, 2026 | In progress filed Jan 2026, not yet issued | 528 27th St | Mc Cormick Construction | sister pressuretreated 2x12 to existing balcony joists(5). change damaged double 2" x10" for a 4"x10" beam on stair openingDetails
sister pressuretreated 2x12 to existing balcony joists(5). change damaged double 2" x10" for a 4"x10" beam on stair opening | $1,500 |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 524 27th St | remove and replace shing for 8" hardi plank east exposure. not visible from streetDetails
remove and replace shing for 8" hardi plank east exposure. not visible from street | $6,950 | |
| Jul 18, 2017 | Completed final sign-off Oct 2018 | 528 27th St | soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans.Details
soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement on ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans. | $30,000 | |
| Jul 18, 2017 | Completed final sign-off Oct 2018 | 524 27th St | soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement in crawl space & ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans.Details
soft story compliance: method of compliance 2016 cebc appendix a-4. mandatory seismic retrofit per sfebc chapter 4d. bldg reinforcement in crawl space & ground floor, add shearwalls, holddowns, & anchor sill bolting to foundation as shown on plans. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mc Cormick Construction (2)
- Engineers
- Hawk Lee (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.