Gregory Smith
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Gregory Smith, Architect
- Based in
- Kenfield
- On San Francisco permits
- Nov 2004 to Mar 2026
70 permits since 2000 (architect on 67 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit, pmt consultant/expediter on 1 permit): 41 completed, 1 in progress, 11 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2026 | In progress filed Mar 2026, not yet issued | 1918 Powell St | vertical addition to (e) single story garage structure, including 2 new residential units.Details
vertical addition to (e) single story garage structure, including 2 new residential units. | $250,000 | |
| Jul 11, 2024 | Completed final sign-off Apr 2025 | 1257 Chestnut St | unit 3: remodel (e) 1 bed 1 bath unit to include (n) kitchen, 2nd bedrrom & 2 bath. all work within building envelopeDetails
unit 3: remodel (e) 1 bed 1 bath unit to include (n) kitchen, 2nd bedrrom & 2 bath. all work within building envelope | $218,600 | |
| Aug 4, 2023 | Never finaled filed Aug 2023, never issued | 1440 De Haro St | altered site permit to #201612155108. pursuant to fourplex legislation/density exceptions. (a 4-story over 1 basement residential bldg, type va).Details
altered site permit to #201612155108. pursuant to fourplex legislation/density exceptions. (a 4-story over 1 basement residential bldg, type va). | $624,500 | |
| May 22, 2023 | Never finaled filed May 2023, never issued | 1068 Florida St | alteration to site permit #202101152820 pursuant to fourplex legislation/density exceptions. construct new 4 unit multi-family residential building with two-car common use garageDetails
alteration to site permit #202101152820 pursuant to fourplex legislation/density exceptions. construct new 4 unit multi-family residential building with two-car common use garage | $482,500 | |
| Feb 25, 2022 | Never finaled issued Aug 2023, no final | 2677 Mcallister St | Achill Beg Construction Inc | construct new roof deck. inverted stairs to top floor unit only. provide 5/8" gyp @ ground floor passageway on the interior wall side. provide 60-minute rear doors @ 2nd & 3rd floors. provide 2nd means of egress for roof deck to rear balcony.Details
construct new roof deck. inverted stairs to top floor unit only. provide 5/8" gyp @ ground floor passageway on the interior wall side. provide 60-minute rear doors @ 2nd & 3rd floors. provide 2nd means of egress for roof deck to rear balcony. | $30,000 |
| Feb 18, 2022 | Completed final sign-off Dec 2022 | 1471 Clay St | Superb Builders & Custom Made Cabinetry | interior remodel including ktichen and bathroom. addition of 2 new bathrooms.Details
interior remodel including ktichen and bathroom. addition of 2 new bathrooms. | $300,000 |
| Jan 27, 2022 | Completed final sign-off Aug 2022 | 383 Bartlett St | Advanced Design General Contractor | interior remodel of the existing top floor dwelling unit to include a kitchen and bath remodel, and conversion of the existing utility room into a new bath.Details
interior remodel of the existing top floor dwelling unit to include a kitchen and bath remodel, and conversion of the existing utility room into a new bath. | $85,000 |
| Dec 7, 2021 | Completed final sign-off May 2022 | 454 Waller St | Patrick Coakley Construction | revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered.Details
revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered. | |
| Sep 13, 2021 | Expired or cancelled withdrawn Oct 2023 | 2758 23rd St | remodel of the existing two story, two-flat building including the addition of a new basement level, new third floor, and new roof terrace.Details
remodel of the existing two story, two-flat building including the addition of a new basement level, new third floor, and new roof terrace. | $495,000 | |
| Jan 15, 2021 | Never finaled issued Sep 2022, no final | 1068 Florida St | to erect a 4-story, type 5b, 3-unit residential building with no basement.Details
to erect a 4-story, type 5b, 3-unit residential building with no basement. | $1,100,000 | |
| Jan 6, 2021 | Completed final sign-off Apr 2022 | 454 Waller St | light well infill at ground floor. interior remodel of 1st floor including kitchen, bathrooms & bedrooms, infill light well @ 1/fDetails
light well infill at ground floor. interior remodel of 1st floor including kitchen, bathrooms & bedrooms, infill light well @ 1/f | $75,000 | |
| Feb 7, 2020 | Expired or cancelled expired Dec 2022 | 2121 Newcomb Av | revision to pa 2019-0919-2169 add new interior doorDetails
revision to pa 2019-0919-2169 add new interior door | $300 | |
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 450 Waller St | K G Company | revision to 201909091065. change location of proposed new bath, 5 new skylights, 2x4, 1 x2x replace rear windows kindDetails
revision to 201909091065. change location of proposed new bath, 5 new skylights, 2x4, 1 x2x replace rear windows kind | $7,500 |
| Sep 19, 2019 | Expired or cancelled expired Dec 2022 | 2121 Newcomb Av | construct new package lift between extg garage and extg mezzanine. no retail selling, packaging only.Details
construct new package lift between extg garage and extg mezzanine. no retail selling, packaging only. | $20,000 | |
| Apr 16, 2019 | Expired or cancelled cancelled Jan 2026 | 2932 21st St | front bldg: repair or replace e wood siding. replace e wood windows with new clad wood windows in kindDetails
front bldg: repair or replace e wood siding. replace e wood windows with new clad wood windows in kind | $10,000 | |
| Apr 16, 2019 | Expired or cancelled cancelled Jan 2026 | 2930 21st St | rear bldg: repair or replace e wood siding. replace e wood windows with new clad wood windows in kindDetails
rear bldg: repair or replace e wood siding. replace e wood windows with new clad wood windows in kind | $10,000 | |
| Feb 20, 2019 | Never finaled issued Jul 2022, no final | 2762 23rd St | Josh Tyler Young | remodel of (e) building, including the addition of a third floor & roof terrace.Details
remodel of (e) building, including the addition of a third floor & roof terrace. | $230,000 |
| Dec 5, 2018 | Completed final sign-off Aug 2019 | 3301 Cesar Chavez St | replace exterior siding at rear and sidesDetails
replace exterior siding at rear and sides | ||
| Feb 8, 2018 | Expired or cancelled withdrawn Jul 2025 | 1918 Powell St | to erect 3 stories, 1 basement, type v-b, 2 unit residential. ** maher: n/a **Details
to erect 3 stories, 1 basement, type v-b, 2 unit residential. ** maher: n/a ** | $250,000 | |
| Feb 8, 2018 | Expired or cancelled withdrawn Jul 2025 | 1918 Powell St | to demolish 1 story private auto garage. ** maher: n/a **Details
to demolish 1 story private auto garage. ** maher: n/a ** | $10,000 | |
| Jan 12, 2018 | Never finaled issued Sep 2019, no final | 144 Peralta Av | rear yard addition adding (1) bed & (2.5) baths to (e), new total (5) bed, (3.5) bath house.Details
rear yard addition adding (1) bed & (2.5) baths to (e), new total (5) bed, (3.5) bath house. | $100,000 | |
| Sep 28, 2017 | Expired or cancelled disapproved Dec 2019 | 2758 23rd St | remodel (e) 2 unit building including the addition of a new basement 3rd fl and roof terrace. total of 2 new bedrooms and 2 new bedrooms and 2 new bathroomsDetails
remodel (e) 2 unit building including the addition of a new basement 3rd fl and roof terrace. total of 2 new bedrooms and 2 new bedrooms and 2 new bathrooms | $500,000 | |
| Sep 15, 2017 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | Bloch Construction Inc | this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinanceDetails
this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinance | |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 520 Washington St | Trainor Commercial Construction Inc. | 1/f- demolition only, preparation for future tenant improvement per ab-17. n/a ordinance #155-13. maher ord 155-13 naDetails
1/f- demolition only, preparation for future tenant improvement per ab-17. n/a ordinance #155-13. maher ord 155-13 na | $5,000 |
| Apr 25, 2017 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | Bloch Construction Inc | revision to app#201606109708. add 2nd restroom. new partition layout at mezzanine. n/a for maher.Details
revision to app#201606109708. add 2nd restroom. new partition layout at mezzanine. n/a for maher. | |
| Dec 15, 2016 | Never finaled issued Dec 2020, no final | 1440 De Haro St | to erect a 3 story/1 basement building consisting of 2-family dwelling units.Details
to erect a 3 story/1 basement building consisting of 2-family dwelling units. | $750,000 | |
| Nov 4, 2016 | Expired or cancelled withdrawn Jan 2021 | 1068 Florida St | erect 4-story, no basement, type 5-a, 2 dwelling units building.Details
erect 4-story, no basement, type 5-a, 2 dwelling units building. | $1,100,000 | |
| Nov 4, 2016 | Expired or cancelled withdrawn Jan 2021 | 1068 Florida St | demolish 2-story, 1 basement, type 5, 2 units building.Details
demolish 2-story, 1 basement, type 5, 2 units building. | $10,000 | |
| Jun 29, 2016 | Expired or cancelled withdrawn Mar 2017 | 2350 Market St | interior remodel of existing residential unit, replace all (e) wood windows in kind, replace (e) deck and stairs in-kind; add a bathroom to residential unit.Details
interior remodel of existing residential unit, replace all (e) wood windows in kind, replace (e) deck and stairs in-kind; add a bathroom to residential unit. | $185,000 | |
| Jun 10, 2016 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | Bloch Construction Inc | g/f: construction new restroom, loading area and mezzanine in (e) tenant space. maher na. mep/alarm/sprinkler deferred.Details
g/f: construction new restroom, loading area and mezzanine in (e) tenant space. maher na. mep/alarm/sprinkler deferred. | $50,000 |
| Apr 19, 2016 | Expired or cancelled cancelled Jan 2026 | 2121 Newcomb Av | demise out approx 3000 sf tenant space including new mezzanine and restroom for future tenant to be determined. no change of useDetails
demise out approx 3000 sf tenant space including new mezzanine and restroom for future tenant to be determined. no change of use | $50,000 | |
| Jan 22, 2015 | Completed final sign-off Mar 2016 | 101 Pinehurst Wy | Stroud Construction | remodel existing kitchen; remodel existing bath; remove existing stair and infill opening.Details
remodel existing kitchen; remodel existing bath; remove existing stair and infill opening. | $20,000 |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 1256 York St | Built By Todd | convert e roof to roof deck off 3rd fl bedrooms. replace e bedroom widows with sliding glass doors to roof deck. new windows/sliders to equal a u-factor of 0.32 or better.Details
convert e roof to roof deck off 3rd fl bedrooms. replace e bedroom widows with sliding glass doors to roof deck. new windows/sliders to equal a u-factor of 0.32 or better. | $2,000 |
| Oct 30, 2014 | Completed final sign-off Aug 2015 | 1321 Grove St | Rinaldi Construction | addition of new dwelling - 2 bedroom, 1 bath residential unit in existing basement space of existing 3 story, 3 flat building. all work will be within existing building envelope sprinklers under separate permitDetails
addition of new dwelling - 2 bedroom, 1 bath residential unit in existing basement space of existing 3 story, 3 flat building. all work will be within existing building envelope sprinklers under separate permit | $45,000 |
| Oct 16, 2014 | Completed final sign-off Jan 2020 | 3301 Cesar Chavez St | remodel 12 apartments to include: remodel kitchens, remodel bathrooms, and bathroom addition. replace 36 windows in kind, no fire escapes. all work within existing building envelope; maher n/aDetails
remodel 12 apartments to include: remodel kitchens, remodel bathrooms, and bathroom addition. replace 36 windows in kind, no fire escapes. all work within existing building envelope; maher n/a | $720,000 | |
| Sep 17, 2014 | Completed final sign-off Sep 2014 | 750 21st Av | S4s Construction Inc | minor interior revision to pa 201310189680, add a closet, relocate some doors. add a powder roomDetails
minor interior revision to pa 201310189680, add a closet, relocate some doors. add a powder room | |
| Nov 21, 2013 | Completed final sign-off Jan 2015 | 1028 Treat Av | K G Company | remove (e) exterior access stairs and porch, remodel (e) 1/f garage & shop space to convert to single family residential w/ interior access to (e) residential areas on 2/f. all (n) work will be within (e) bldg envelope.Details
remove (e) exterior access stairs and porch, remodel (e) 1/f garage & shop space to convert to single family residential w/ interior access to (e) residential areas on 2/f. all (n) work will be within (e) bldg envelope. | $40,000 |
| Oct 18, 2013 | Completed final sign-off Sep 2014 | 750 21st Av | S4s Construction Inc | interior remodel of 2 units including 2 new bathrooms ea unit. extend 2nd fl unit to 1st fl rear. enclose existing covered gr fl porch area. gr fl 1 bedroom, 1 family room, full bath, wetbar, new stair to 2nd fl unit. replace all windows on rear with sliding doors and guardrailingDetails
interior remodel of 2 units including 2 new bathrooms ea unit. extend 2nd fl unit to 1st fl rear. enclose existing covered gr fl porch area. gr fl 1 bedroom, 1 family room, full bath, wetbar, new stair to 2nd fl unit. replace all windows on rear with sliding doors and guardrailing | $120,000 |
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 2590 32nd Av | Terence Mcmahon Construction | install 2 new windows. construct walk in closet. relocate electrical and lightingDetails
install 2 new windows. construct walk in closet. relocate electrical and lighting | $2,500 |
| Aug 7, 2012 | Completed final sign-off Aug 2019 | 127 Buchanan St | Cullinane Plastering, Achill Beg Construction Inc, S4s Construction Inc | to erect 4 stories, 4 units residential building.Details
to erect 4 stories, 4 units residential building. | $1,000,000 |
| Jun 11, 2012 | Completed final sign-off Dec 2019 | 230 11th St | Bloch Construction Inc | repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs.Details
repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs. | $250,000 |
| May 2, 2012 | Completed final sign-off Nov 2012 | 2550 California St | revision to pa# 2011-0418-4296-replace (e) non conforming wood exterior stair with new metal stair that serves only i unit (residential). (2 seperate stairs with each serving i unit, 4 & 5-residential. add restroom to 1st floor commercial space. revise gyp board wall details 1-19 on sheet a9.2.Details
revision to pa# 2011-0418-4296-replace (e) non conforming wood exterior stair with new metal stair that serves only i unit (residential). (2 seperate stairs with each serving i unit, 4 & 5-residential. add restroom to 1st floor commercial space. revise gyp board wall details 1-19 on sheet a9.2. | $13,000 | |
| Jan 19, 2012 | Completed final sign-off Jul 2013 | 530 Ashbury St | interior remodel. kitchen, bath. add closets to existing bedrooms. convert existing utility room to new bath. new french door in existing center rear bay window openings. partial reconfiguration of existing second stair in-kind to lenghten landing.Details
interior remodel. kitchen, bath. add closets to existing bedrooms. convert existing utility room to new bath. new french door in existing center rear bay window openings. partial reconfiguration of existing second stair in-kind to lenghten landing. | $40,000 | |
| Sep 29, 2011 | Completed final sign-off May 2012 | 534 Ashbury St | S4s Construction Inc | 3rd floor unit: remodel kitchen, bath, change utility room into a new full bath, remove fireplaceDetails
3rd floor unit: remodel kitchen, bath, change utility room into a new full bath, remove fireplace | $60,000 |
| Apr 18, 2011 | Completed final sign-off Nov 2012 | 2550 California St | Bloch Construction Inc | revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits.Details
revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits. | $400,000 |
| Jun 24, 2009 | Completed final sign-off Oct 2009 | 536 Ashbury St | revision to 200905158481, kitchen remodel, no drawings. minor wall changes, infill 1 windowDetails
revision to 200905158481, kitchen remodel, no drawings. minor wall changes, infill 1 window | ||
| Apr 3, 2009 | Expired or cancelled cancelled Jan 2020 | 57 Lapidge St | addition to full rear yard light well at 3rd fls, add dormer to roof for new attic access stairs, add bath to attic (4th fl)Details
addition to full rear yard light well at 3rd fls, add dormer to roof for new attic access stairs, add bath to attic (4th fl) | $40,000 | |
| Apr 3, 2009 | Expired or cancelled expired May 2013 | 20 Crestline Dr | B R J Construction | at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom.Details
at unit #12: raise existing ceiling 2'-0" to 10'-0". extend rear deck to side property line, replace an existing rear-yard glazing, remodel existing interior including new kitchen & bathroom. | $174,500 |
| Jan 2, 2009 | Completed final sign-off Jan 2009 | 168 21st Av | John Parola Construction | revision to pa# 2008-0328-8224-to show new water heater locations on 1st floor workroom as required by building inspectorDetails
revision to pa# 2008-0328-8224-to show new water heater locations on 1st floor workroom as required by building inspector | |
| Jul 17, 2008 | Completed final sign-off Jan 2009 | 168 21st Av | John Parola Construction | revision to pa# 2008-0328-8224-relocate proposed f.a.u location on 3rd floor, eliminate proposed f.a.u location from 2nd floor to (e) location on 1st floor (garage level)Details
revision to pa# 2008-0328-8224-relocate proposed f.a.u location on 3rd floor, eliminate proposed f.a.u location from 2nd floor to (e) location on 1st floor (garage level) | |
| Dec 14, 2007 | Completed final sign-off Apr 2008 | 2 Henry Adams St | relocate (e) tenant space entry doors, close (e) tenant windows to common area. no lighting, electrical or plumbing workDetails
relocate (e) tenant space entry doors, close (e) tenant windows to common area. no lighting, electrical or plumbing work | $7,500 | |
| Jul 18, 2007 | Never finaled issued Jul 2007, no final | 1101 Polk St | construct transaction coutner & screen wall, relocate existing restaurant equipment with associated electrical. relcoate hand sink & mop sink. existing space is unconditioned and will remain unconditioned. existing lighting to remain.Details
construct transaction coutner & screen wall, relocate existing restaurant equipment with associated electrical. relcoate hand sink & mop sink. existing space is unconditioned and will remain unconditioned. existing lighting to remain. | $2,100 | |
| Jan 10, 2007 | Completed final sign-off Mar 2007 | 3899 24th St | Cci Com'l Constr & Improv**See 985808*** | revise storefront, office partitions, & restroom to pa# 2006/07/07/5910 submit for mechanical drawings.Details
revise storefront, office partitions, & restroom to pa# 2006/07/07/5910 submit for mechanical drawings. | $500 |
| Dec 13, 2006 | Completed final sign-off Apr 2007 | 320 Maple St | John Parola Construction | work includes demolition of 1st floor framing to lower level. new partitions, fixtures, finishes will be constructed. new bath will be addedDetails
work includes demolition of 1st floor framing to lower level. new partitions, fixtures, finishes will be constructed. new bath will be added | $50,000 |
| Dec 13, 2006 | Completed final sign-off Apr 2007 | 320 Maple St | final inspection 08902747, 08801214, 200002041064Details
final inspection 08902747, 08801214, 200002041064 | $100 | |
| Nov 16, 2006 | Completed final sign-off Jul 2007 | 101 Henry Adams St | relocation of disabled access ramp, construction of mezz level, cosmetic remodel of building entry w new tbar ceiling and flooringDetails
relocation of disabled access ramp, construction of mezz level, cosmetic remodel of building entry w new tbar ceiling and flooring | $315,000 | |
| Jun 22, 2006 | Never finaled issued Jun 2006, no final | 659 Townsend St | new restaurant remodeling including counter, backroom type i hood, t-bar ceiling. less than 49 person.Details
new restaurant remodeling including counter, backroom type i hood, t-bar ceiling. less than 49 person. | $75,000 | |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 2 Henry Adams St | work includes selective demolition of (e) toilet room finishes and fixtures. new interior finishes,Details
work includes selective demolition of (e) toilet room finishes and fixtures. new interior finishes, | $30,000 | |
| Jul 5, 2005 | Expired or cancelled expired Jun 2007 | 2460 Folsom St | demolition of (e) access deck and stairs. construction of new access deck and stair in kind.Details
demolition of (e) access deck and stairs. construction of new access deck and stair in kind. | $3,000 | |
| Jul 5, 2005 | Expired or cancelled expired Dec 2007 | 111 Lyon St | interior remodel of (e) fourth floor apartment. new interior partitions. plumbing fixtures & electrDetails
interior remodel of (e) fourth floor apartment. new interior partitions. plumbing fixtures & electr | $80,000 | |
| Jul 1, 2005 | Completed final sign-off Aug 2005 | 101 Henry Adams St | minor modification to interior partitions relocate existing entry doors and windows add new lightingDetails
minor modification to interior partitions relocate existing entry doors and windows add new lighting | $10,000 | |
| Jul 1, 2005 | Completed final sign-off Aug 2005 | 101 Henry Adams St | remodel of existing public restrooms 2nd floor new fixtures partitions and finishes to replace existDetails
remodel of existing public restrooms 2nd floor new fixtures partitions and finishes to replace exist | $30,000 | |
| Jul 1, 2005 | Completed final sign-off Aug 2005 | 101 Henry Adams St | new interior partitions additional lights and electrical outletsDetails
new interior partitions additional lights and electrical outlets | $15,000 | |
| Apr 21, 2005 | Expired or cancelled expired Dec 2010 | 1680 Fulton St | work includes minor demolition of interior partitions, kitchen & bath. new partitions kitchen & bathDetails
work includes minor demolition of interior partitions, kitchen & bath. new partitions kitchen & bath | $80,000 | |
| Apr 1, 2005 | Never finaled issued Apr 2005, no final | 600 Townsend St | demo partition & door & install new partition, me, cal plub 7 sprinkler work.Details
demo partition & door & install new partition, me, cal plub 7 sprinkler work. | $10,000 | |
| Mar 18, 2005 | Completed final sign-off Nov 2007 | 43 Surrey St | work includes the demolition of an (e) bathroom & deck addition in a rear yard. a new 2 bath addition & deck will replace the (e). all mechanical, electrical & plumbing work will be design build by the contractor.Details
work includes the demolition of an (e) bathroom & deck addition in a rear yard. a new 2 bath addition & deck will replace the (e). all mechanical, electrical & plumbing work will be design build by the contractor. | $60,000 | |
| Mar 18, 2005 | Completed final sign-off May 2005 | 101 Henry Adams St | work includes the demolition of extg fixtures/partitions and finishes in an extg restrmDetails
work includes the demolition of extg fixtures/partitions and finishes in an extg restrm | $30,000 | |
| Mar 10, 2005 | Completed final sign-off Oct 2005 | 2460 Folsom St | work includes minor demolition of interior partitions, fixtures & finishes. new partitions, fix &finDetails
work includes minor demolition of interior partitions, fixtures & finishes. new partitions, fix &fin | $80,000 | |
| Dec 7, 2004 | Completed final sign-off Feb 2005 | 1025 Steiner St | revise "loft" to "closet" on plan for bldng. insp. comments correction noticeDetails
revise "loft" to "closet" on plan for bldng. insp. comments correction notice | ||
| Nov 1, 2004 | Completed final sign-off May 2005 | 101 Henry Adams St | work includes the remodel of (e) non accessible public restroom .(e) non accessible plumbing fixtureDetails
work includes the remodel of (e) non accessible public restroom .(e) non accessible plumbing fixture | $10,000 |