Michael Steinmann
- License
- 11824
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Glumac International
- On San Francisco permits
- Oct 2004 to Aug 2015
7 permits since 2000 (engineer on 7 permits): 3 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dpr Construction (2), Turner Construction Co (2), Northern Power Systems Inc.
- Architects
- Kevin Wilden, Rene Garcia Calara
- Authorized agents
- Alan Axworthy
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 7
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | 14th floor: mep scope of work for architectural permit # 2015-0805-3357 not issued yet. adding fsds for horizontal exit that was created. life safety deferred. compliance with maher ordinance no 155-13 not required.Details
14th floor: mep scope of work for architectural permit # 2015-0805-3357 not issued yet. adding fsds for horizontal exit that was created. life safety deferred. compliance with maher ordinance no 155-13 not required. | |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 1 Market St | Dpr Construction | selective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13Details
selective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13 | $1,300,000 |
| Apr 25, 2006 | Expired or cancelled expired Jul 2011 | 101 California St | Turner Construction Co | oti-3 13th floor, ls life safetyDetails
oti-3 13th floor, ls life safety | $10,000 |
| Apr 25, 2006 | Expired or cancelled expired Oct 2007 | 101 California St | Turner Construction Co | oti-3 24th floor ls life safety.Details
oti-3 24th floor ls life safety. | $20,000 |
| Dec 2, 2005 | Expired or cancelled expired Oct 2007 | 101 California St | oti-2 10th floor sp | $6,500 | |
| Nov 1, 2004 | Completed final sign-off Dec 2004 | 101 California St | oti-3, 32nd floor, ls only.Details
oti-3, 32nd floor, ls only. | $25,000 | |
| Oct 19, 2004 | Completed final sign-off Feb 2006 | 201 Mission St | Northern Power Systems Inc. | design and installtion of a combined heating and electicity gertnation system. the system includes*Details
design and installtion of a combined heating and electicity gertnation system. the system includes* | $550,000 |