Gilbert Lam
- Listed as
- authorized agent-others, contractor
- Firm
- Glc And Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Dec 2021
114 permits since 2000 (contractor on 112 permits, authorized agent-others on 2 permits): 97 completed, 14 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ly Construction (2), Fong's Construction & Plumbing, New Era Construction Co. ***Check Id****, T & A Construction Inc
- Architects
- Thomas Biggs (3), Jim Treman (2), John Kleman (2), Thomas Dutton Biggs (2), Cassandra Mettling-Davis, Horon Lee, Sia Consulting Corp
- Engineers
- Dawn Ma (2), Jingbo Yang (2), Siavash Tahbazof (2), Bahman Ghassemzadeh, Horon Lee, Michael Hom
- Designers
- D C King
Most recent permits
Showing the 100 most recent of 114.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2021 | Completed final sign-off Sep 2022 | 170 Pfeiffer St | Glc And Company, Ly Construction | 1/f: add interior stairs to garage. replace 3/f windows in kind.Details
1/f: add interior stairs to garage. replace 3/f windows in kind. | $50,000 |
| Jul 7, 2021 | Completed final sign-off Dec 2021 | 1775 Oak St | Glc And Company | revision to pa# 202010297689. change to beams previously proposed.Details
revision to pa# 202010297689. change to beams previously proposed. | |
| Jun 18, 2021 | Completed final sign-off Aug 2022 | 170 Pfeiffer St | Glc And Company, Ly Construction | remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced.Details
remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced. | $65,000 |
| Mar 11, 2021 | Completed final sign-off Jun 2021 | 3042 Gough St | Glc And Company | to perform exploratory demo on closet and pantry for bathroom remodel. remove and replace approx. 200 sq ft. or wall finishes.Details
to perform exploratory demo on closet and pantry for bathroom remodel. remove and replace approx. 200 sq ft. or wall finishes. | $1,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 3042 Gough St | Glc And Company | add a full bathroom to rear bedroom (upper unit). widen (e) cased openings .Details
add a full bathroom to rear bedroom (upper unit). widen (e) cased openings . | $30,000 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 1905 Laguna St | Glc And Company | #104: kitchen remodel in kind. replace cabinets & countertops. bathroom remodel in kind. replace bathroom tile & finishes. no structural work performed.Details
#104: kitchen remodel in kind. replace cabinets & countertops. bathroom remodel in kind. replace bathroom tile & finishes. no structural work performed. | $20,000 |
| Oct 29, 2020 | Completed final sign-off Dec 2021 | 1775 Oak St | Glc And Company | top level: renovate 1 kitchen & 1 bathroom, new beam/opening between dining & kitchen. add a full bathroom. add 1 skylightDetails
top level: renovate 1 kitchen & 1 bathroom, new beam/opening between dining & kitchen. add a full bathroom. add 1 skylight | $75,000 |
| Oct 3, 2020 | Completed final sign-off Feb 2021 | 2032 Green St | Glc And Company | revision to pa 202001222490. change beam.Details
revision to pa 202001222490. change beam. | |
| Feb 24, 2020 | Completed final sign-off Sep 2020 | 3 Burnett Ave North Av | Glc And Company | (building b)beam in kitchen. renovate kitchen. renovate master bathroom.Details
(building b)beam in kitchen. renovate kitchen. renovate master bathroom. | $100,000 |
| Jan 22, 2020 | Completed final sign-off Feb 2021 | 2032 Green St | Glc And Company | kitchen and bath remodel, new beam in kitchen, laundry in closet (n) closet doorDetails
kitchen and bath remodel, new beam in kitchen, laundry in closet (n) closet door | $100,000 |
| Nov 12, 2019 | Completed final sign-off Jul 2020 | 819 24th Av | Glc And Company | remove extg alum. windows at front elevation. replace with new alum. clad wood windows.Details
remove extg alum. windows at front elevation. replace with new alum. clad wood windows. | $3,000 |
| Oct 11, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | Glc And Company | revision to 201906123197. extension of foundation at rearDetails
revision to 201906123197. extension of foundation at rear | $5,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2021 | 831 27th Av | Glc And Company | interior remodelto upgrade kitchen & bathrooms. in each unit. (replace front facade windows in kind under separate permit).Details
interior remodelto upgrade kitchen & bathrooms. in each unit. (replace front facade windows in kind under separate permit). | $140,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2021 | 831 27th Av | Glc And Company | replace (e) front façade windows inkind, non-historic building, rated c with aluminum or fiberglass windows.Details
replace (e) front façade windows inkind, non-historic building, rated c with aluminum or fiberglass windows. | $5,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | Glc And Company | remove (e) bay window & skylight. (n) windows & expanded bay @ rear of building.Details
remove (e) bay window & skylight. (n) windows & expanded bay @ rear of building. | $10,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2020 | 819 24th Av | Glc And Company | remodel/relocate 2nd fl kitchen & powder room. remodel 3rd fl. bath, add hallway, add bathDetails
remodel/relocate 2nd fl kitchen & powder room. remodel 3rd fl. bath, add hallway, add bath | $150,000 |
| Aug 5, 2019 | Never finaled issued Jan 2020, no final | 2509 Pacific Av | street sapce | ||
| Aug 5, 2019 | Never finaled issued Jan 2020, no final | 2509 Pacific Av | street sapce | ||
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 265 Lobos St | Glc And Company | repair rear dry rotted sidings with new sidingsDetails
repair rear dry rotted sidings with new sidings | $1,500 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 287 28th Av | Glc And Company | remodel master bathroom in kind. relocate main subpanel w/ in garage.Details
remodel master bathroom in kind. relocate main subpanel w/ in garage. | $18,000 |
| Jun 12, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | Glc And Company | remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place.Details
remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place. | $75,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 279 Oak Park Dr | Glc And Company | remodel 3rd floor bathroom in kind. no wall removalDetails
remodel 3rd floor bathroom in kind. no wall removal | $11,000 |
| Jun 4, 2019 | Completed final sign-off Jan 2020 | 279 Oak Park Dr | Glc And Company | remodel kitchen in kind. install new cabinets, countertops, & appliances. no wall removalDetails
remodel kitchen in kind. install new cabinets, countertops, & appliances. no wall removal | $30,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 77 Ina Ct | Glc And Company | kitchen remodel incl removing a center bearing wall, installing roof beams. all interior worksDetails
kitchen remodel incl removing a center bearing wall, installing roof beams. all interior works | $30,000 |
| Sep 7, 2018 | Completed final sign-off Aug 2019 | 65 Ina Ct | Glc And Company | 1st flr - add 1 bedroom, 1 full bath, laundry and media roomDetails
1st flr - add 1 bedroom, 1 full bath, laundry and media room | $45,000 |
| Aug 29, 2018 | Completed final sign-off Aug 2020 | 722 Sunnydale Av | Glc And Company | ti ref pa#201804176636. remodel entire second floor in-kind new elec $ recessed lights. resand floors on 2nd flr. new sheet rock in garage. 2 new winows in front of property with marvin integrity line wood fiberglass clad.Details
ti ref pa#201804176636. remodel entire second floor in-kind new elec $ recessed lights. resand floors on 2nd flr. new sheet rock in garage. 2 new winows in front of property with marvin integrity line wood fiberglass clad. | $10,000 |
| Aug 8, 2018 | Completed final sign-off Nov 2018 | 3819 18th St | Glc And Company | #1: remodel kitchen & bathroom in kind. new electrical in unit (wire/subpanel). 1 new replacement window in bathroom, 1 new replacement window in kitchen. no walls moved, removed, added or infilled, all existing layout to remain unchanged.Details
#1: remodel kitchen & bathroom in kind. new electrical in unit (wire/subpanel). 1 new replacement window in bathroom, 1 new replacement window in kitchen. no walls moved, removed, added or infilled, all existing layout to remain unchanged. | $20,000 |
| Aug 8, 2018 | Completed final sign-off Feb 2019 | 207 Munich St | Glc And Company | no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. remodel kitchen and bathroom in kind, updating electrical in the entire unit. replacing 1 living room window- visiblle from street - fixed or ctr light w/casement on either side. 1 bedrm, 1 garage - front facing alumDetails
no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. remodel kitchen and bathroom in kind, updating electrical in the entire unit. replacing 1 living room window- visiblle from street - fixed or ctr light w/casement on either side. 1 bedrm, 1 garage - front facing alum | $35,000 |
| Jul 23, 2018 | Completed final sign-off Nov 2018 | 156 Midcrest Wy | Glc And Company | remodel 2nd floor hall bathroom in kind, replace w/ new shower pan and new tub. everything in same locationDetails
remodel 2nd floor hall bathroom in kind, replace w/ new shower pan and new tub. everything in same location | $10,000 |
| Jun 11, 2018 | Completed final sign-off Aug 2018 | 3819 18th St | Glc And Company | renew for final 201605096912, 201605318769, 201611072138Details
renew for final 201605096912, 201605318769, 201611072138 | |
| May 24, 2018 | Completed final sign-off Aug 2019 | 1378 Portola Dr | Glc And Company | add deck with stairs at rear.Details
add deck with stairs at rear. | $3,500 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 110 Steiner St | Glc And Company | add new full bathroom on ground floor behind garage.Details
add new full bathroom on ground floor behind garage. | $14,000 |
| Apr 19, 2018 | Completed final sign-off Apr 2018 | 1211 Shafter Av | Glc And Company | replace (5) vinyl windows in kind. not visible from the street. located on the rear yard wall. no framing alterations. (3) on upper level(all at same openings u factor < 0.32), (1)at lower level & (1) patio door. maher n/aDetails
replace (5) vinyl windows in kind. not visible from the street. located on the rear yard wall. no framing alterations. (3) on upper level(all at same openings u factor < 0.32), (1)at lower level & (1) patio door. maher n/a | $1,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 722 Sunnydale Av | Glc And Company | kitchen and bathroom remodel. sheetrock replacement, install tile floors at kitchen and bathroom, new shower, toilet, vanity, 3 new windows at rear, light fixtures, new roof.Details
kitchen and bathroom remodel. sheetrock replacement, install tile floors at kitchen and bathroom, new shower, toilet, vanity, 3 new windows at rear, light fixtures, new roof. | $10,000 |
| Apr 5, 2018 | Completed final sign-off Jun 2018 | 403 34th Av | Glc And Company | remodel kitchen in-kind, replace bathroom shower tiles/shower pan, waterproofing. no structural work/wall modification/wall removal.Details
remodel kitchen in-kind, replace bathroom shower tiles/shower pan, waterproofing. no structural work/wall modification/wall removal. | $20,000 |
| Feb 12, 2018 | Completed final sign-off Jun 2018 | 1211 Shafter Av | Glc And Company | remodel ground floor (1) bathroom; (2) second floor bathrooms and kitchen in kind. n/a maherDetails
remodel ground floor (1) bathroom; (2) second floor bathrooms and kitchen in kind. n/a maher | $40,000 |
| Feb 8, 2018 | Completed final sign-off May 2018 | 3819 18th St | Glc And Company | repair broken siding - not visible from street. replace like kind siding. repaint siding with like colorDetails
repair broken siding - not visible from street. replace like kind siding. repaint siding with like color | $2,000 |
| Dec 29, 2017 | Completed final sign-off Jun 2018 | 2334 Pine St | Glc And Company | 2nd fl kitchen: replace countertops, cabinets. 3rd fl: removel master bath in kindl. replace shower pan and tub. remodel hallway bathroom. replace tile, toilet, vanity, shower pan. 4th fl remodel bath in kind, replace bath in kind. replace tile, toilet, vanity and shower panDetails
2nd fl kitchen: replace countertops, cabinets. 3rd fl: removel master bath in kindl. replace shower pan and tub. remodel hallway bathroom. replace tile, toilet, vanity, shower pan. 4th fl remodel bath in kind, replace bath in kind. replace tile, toilet, vanity and shower pan | $55,000 |
| Nov 15, 2017 | Completed final sign-off Jun 2018 | 324 Joost Av | Glc And Company | remodel kitchen on 2nd fl, convert laundry to (n) bathroom. remodel (e) bathroom on 3rd fl. garage reinforcement.Details
remodel kitchen on 2nd fl, convert laundry to (n) bathroom. remodel (e) bathroom on 3rd fl. garage reinforcement. | $60,000 |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 2655 21st Av | Glc And Company | new laundry 1st flDetails
new laundry 1st fl | $500 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 65 Ina Ct | Glc And Company | 2nd floor - remodel kitchen. remove load bearing wall & replace with beam and post.Details
2nd floor - remodel kitchen. remove load bearing wall & replace with beam and post. | $20,000 |
| Mar 24, 2017 | Completed final sign-off Sep 2021 | 2420 Taraval St | Glc And Company | horizontal & vertical addition @ rear to accomodate (2) additional residential units. proposed interior remodel to 1st fl adding (2)bedrooms,(1)livingroom,(1)bath,(1)kitchen. 2nd fl adding(2)bedroom,(1) master bedroom,(2)baths,(1)kitchen. 3rd fl adding(2)bedrooms,(1)master bedroom,(2)baths,(1)kitchDetails
horizontal & vertical addition @ rear to accomodate (2) additional residential units. proposed interior remodel to 1st fl adding (2)bedrooms,(1)livingroom,(1)bath,(1)kitchen. 2nd fl adding(2)bedroom,(1) master bedroom,(2)baths,(1)kitchen. 3rd fl adding(2)bedrooms,(1)master bedroom,(2)baths,(1)kitch | $425,000 |
| Mar 20, 2017 | Completed final sign-off Jul 2017 | 2658 21st Av | Glc And Company | g/f: add 2 bedrooms, family room and 1 full bathroom. 2/f: remodel (e) kitchen and (e) bathroom. add 1 (n) bathroom. infill north and south light well.Details
g/f: add 2 bedrooms, family room and 1 full bathroom. 2/f: remodel (e) kitchen and (e) bathroom. add 1 (n) bathroom. infill north and south light well. | $80,000 |
| Mar 9, 2017 | Completed final sign-off Feb 2018 | 1147 Dolores St | Glc And Company | drywall installation in basement crawlspace and deck /fencing at roof. repair weather proofing on siding. install exhaust fan in 3rd floor hallway bathroom. to comply for complaint # 201763161 #2, complaint # 201762927 # 6 & 7Details
drywall installation in basement crawlspace and deck /fencing at roof. repair weather proofing on siding. install exhaust fan in 3rd floor hallway bathroom. to comply for complaint # 201763161 #2, complaint # 201762927 # 6 & 7 | $5,000 |
| Mar 9, 2017 | Completed final sign-off May 2018 | 2927 Pierce St | Glc And Company | remodel kitchen, master bathroom with shower pan and hallway bathroom in-kind.Details
remodel kitchen, master bathroom with shower pan and hallway bathroom in-kind. | $60,000 |
| Feb 8, 2017 | Completed final sign-off May 2017 | 376 Chestnut St | Glc And Company | remodel master bath in kindDetails
remodel master bath in kind | $23,000 |
| Jan 20, 2017 | Completed final sign-off Jul 2017 | 321 Avila St | Glc And Company | remodel 2/f hallway bathroom in-kind.Details
remodel 2/f hallway bathroom in-kind. | $13,000 |
| Jan 20, 2017 | Completed final sign-off May 2017 | 1355 21st Av | Glc And Company | remodel (2) bathrooms on ground floor in kind, replace (9) rear old windows with new windows not visible from the frontDetails
remodel (2) bathrooms on ground floor in kind, replace (9) rear old windows with new windows not visible from the front | $25,000 |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 858 30th Av | Glc And Company | add new excercise room on 1st fl, addnew office & relocate existing dining area on 2nd fl.Details
add new excercise room on 1st fl, addnew office & relocate existing dining area on 2nd fl. | $10,000 |
| Jul 15, 2016 | Completed final sign-off Jul 2017 | 321 Avila St | Glc And Company | 1st fl - add 2 bedroooms, 2 full baths, foundation replaced and basement floor to be lowered by approx. 15" at all areas except (e) garage & utility room to remain. install new radiant heat, kitchen remodelDetails
1st fl - add 2 bedroooms, 2 full baths, foundation replaced and basement floor to be lowered by approx. 15" at all areas except (e) garage & utility room to remain. install new radiant heat, kitchen remodel | $75,000 |
| Jun 23, 2016 | Completed final sign-off Feb 2020 | 297 Sagamore St | Glc And Company | to erect 3 stories of one single family type 5 construction.Details
to erect 3 stories of one single family type 5 construction. | $425,000 |
| Jun 23, 2016 | Completed final sign-off Feb 2020 | 299 Sagamore St | Glc And Company | to erect 3 stories, no basement, type v-b, single family building.Details
to erect 3 stories, no basement, type v-b, single family building. | $375,000 |
| May 17, 2016 | Completed final sign-off May 2016 | 858 30th Av | Glc And Company | revision to pa #201507020600: add new skylights at kitchen, master bathroom & hallway; new bar sink; relocate bathroom & utility room on 2nd floor. reconfigure master bathroom layout on 2nd floor. add new pantry & closet at entry area.Details
revision to pa #201507020600: add new skylights at kitchen, master bathroom & hallway; new bar sink; relocate bathroom & utility room on 2nd floor. reconfigure master bathroom layout on 2nd floor. add new pantry & closet at entry area. | $2,000 |
| May 5, 2016 | Completed final sign-off Aug 2016 | 882 35th Av | Glc And Company | remodel kitchen in kind. replace kitchen sink. no structural improvements.Details
remodel kitchen in kind. replace kitchen sink. no structural improvements. | $15,000 |
| May 5, 2016 | Never finaled issued May 2016, no final | 2027 28th Av | Glc And Company | replace 2 existing vinyl window assemblies on the front elevation with new aluminum windows; same operation; same size.Details
replace 2 existing vinyl window assemblies on the front elevation with new aluminum windows; same operation; same size. | $10,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 2027 28th Av | Glc And Company | revision to ref pa 2014 1201 2741: remove interior stairway and reconfigure (e) kitchen, add new sink at kitchen, add new skylight at hallway, replace skylight at lightwell and bathroom. infill approx 17 sf at lightwell. replace window at rear side of bld on 2ndDetails
revision to ref pa 2014 1201 2741: remove interior stairway and reconfigure (e) kitchen, add new sink at kitchen, add new skylight at hallway, replace skylight at lightwell and bathroom. infill approx 17 sf at lightwell. replace window at rear side of bld on 2nd | $7,000 |
| Apr 8, 2016 | Completed final sign-off Jul 2016 | 838 27th Av | Glc And Company | to obtain a final inspection for work approved under pa#201406188798 & pa#201404254246. all work is complete.Details
to obtain a final inspection for work approved under pa#201406188798 & pa#201404254246. all work is complete. | |
| Mar 1, 2016 | Completed final sign-off Mar 2016 | 89 Maynard St | Glc And Company | to comply w/ nov #201576651. terminate 3' from property line and openings. repair vent at exterior wall at west left property line.Details
to comply w/ nov #201576651. terminate 3' from property line and openings. repair vent at exterior wall at west left property line. | $1,000 |
| Feb 10, 2016 | Completed final sign-off Jul 2016 | 3727 21st St | Glc And Company | remodel kitchen in-kind of existing. replace window in kitchen in-kind. no structural work.Details
remodel kitchen in-kind of existing. replace window in kitchen in-kind. no structural work. | $15,000 |
| Jan 21, 2016 | Expired or cancelled expired Apr 2025 | 715 Brannan St | Glc And Company | soft demo non bearing partition / storage add non-bearing wall partitions as shown ground floor. no structural work.Details
soft demo non bearing partition / storage add non-bearing wall partitions as shown ground floor. no structural work. | $5,000 |
| Nov 4, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | Glc And Company | revision to 201505085867, 201503251894. relocate 3rd fl unit to 1st fl. relocate skylight on 3rd fl. reconfigure stairway on 2nd and 3rd fl. revise master bath, walkincloset layout on 3rd fl per plan. revise kitchen layout and add new bar sink on 2nd flDetails
revision to 201505085867, 201503251894. relocate 3rd fl unit to 1st fl. relocate skylight on 3rd fl. reconfigure stairway on 2nd and 3rd fl. revise master bath, walkincloset layout on 3rd fl per plan. revise kitchen layout and add new bar sink on 2nd fl | |
| Aug 26, 2015 | Completed final sign-off Sep 2016 | 229 Summit St | Glc And Company | add one full bath on 1st flr, turn (e) tool room into entertainment room per plan.Details
add one full bath on 1st flr, turn (e) tool room into entertainment room per plan. | $30,000 |
| Aug 20, 2015 | Completed final sign-off Aug 2015 | 373 15th Av | Glc And Company | legalized shower in (e) bathroom closet. no walls to be altered.Details
legalized shower in (e) bathroom closet. no walls to be altered. | $1,500 |
| Aug 18, 2015 | Completed final sign-off Aug 2015 | 218 12th Av | Glc And Company | to comply with complaint #201563131. repair rear staircase, replace dryrot stair thread and post. less than 50% repaired area. repair in kind.Details
to comply with complaint #201563131. repair rear staircase, replace dryrot stair thread and post. less than 50% repaired area. repair in kind. | $1,000 |
| Aug 5, 2015 | Completed final sign-off Apr 2016 | 55 Maddux Av | Glc And Company | add two bedrooms, one bathroom, & utility/mudroom on 1st floor per plan.Details
add two bedrooms, one bathroom, & utility/mudroom on 1st floor per plan. | $25,000 |
| Jul 2, 2015 | Completed final sign-off May 2016 | 858 30th Av | Glc And Company | add new family room, bedroom & bathroom at 1st floor. replace (e) furnace & water heater. relocate (e) kitchen & dining room at 2nd floor. remodle (e) bathroom & add new bathroom at 2nd floor. replace windows throughout bldg. relocate stairway connect 1st & 2nd floor.Details
add new family room, bedroom & bathroom at 1st floor. replace (e) furnace & water heater. relocate (e) kitchen & dining room at 2nd floor. remodle (e) bathroom & add new bathroom at 2nd floor. replace windows throughout bldg. relocate stairway connect 1st & 2nd floor. | $36,000 |
| May 19, 2015 | Completed final sign-off Mar 2016 | 118 Woodland Av | Glc And Company | remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or streetDetails
remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or street | $49,500 |
| May 8, 2015 | Completed final sign-off Nov 2015 | 231 24th Av | Glc And Company | remove existing sunroom at 2nd and 3rd fl. existing 2nd floor sunroom framing to remain. new deck at rearDetails
remove existing sunroom at 2nd and 3rd fl. existing 2nd floor sunroom framing to remain. new deck at rear | $8,000 |
| Mar 27, 2015 | Completed final sign-off May 2016 | 858 30th Av | Glc And Company | remodel (e) kitchen and hallway bathroom in-kind. no walls moved, removed or added. all (e) layout to remain unchanged.Details
remodel (e) kitchen and hallway bathroom in-kind. no walls moved, removed or added. all (e) layout to remain unchanged. | $24,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | Glc And Company | remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation.Details
remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation. | $20,000 |
| Feb 10, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | Glc And Company | remodel one kitchen and 2 bathroom in each unit in kind. total 4 bathrooms and 2 kitchens.Details
remodel one kitchen and 2 bathroom in each unit in kind. total 4 bathrooms and 2 kitchens. | $54,600 |
| Feb 3, 2015 | Completed final sign-off Jul 2016 | 225 Santa Ana Av | Glc And Company | modify existing approved plans. add laundry room next to bedroom. revision to bpa #201103172277.Details
modify existing approved plans. add laundry room next to bedroom. revision to bpa #201103172277. | $20,000 |
| Jan 6, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | Glc And Company | soft demo of all interior wall finishes. not to exceed approx 500 sq ft per unit. call district inspector prior to start of work.Details
soft demo of all interior wall finishes. not to exceed approx 500 sq ft per unit. call district inspector prior to start of work. | $8,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 632 Moraga St | Glc And Company | grnd flr developement (618 sf) that includes a new family room/guest rm,bathrm & closets,relocate laundry equipment,water heater & fau;new interior stair; remodel at 2nd flr (677 sf) incl kitchen expansion into lightwell & kitchen remodel,bathrm remodel,new powder rm,new doors,new windows,2 newDetails
grnd flr developement (618 sf) that includes a new family room/guest rm,bathrm & closets,relocate laundry equipment,water heater & fau;new interior stair; remodel at 2nd flr (677 sf) incl kitchen expansion into lightwell & kitchen remodel,bathrm remodel,new powder rm,new doors,new windows,2 new | $148,000 |
| Dec 1, 2014 | Never finaled issued Dec 2014, no final | 2027 28th Av | Glc And Company | remodel e bedroom and laundry area on gr floor. remodel e bath and kitchen on 2nd fl, add new 1/2 bath on 2nd flDetails
remodel e bedroom and laundry area on gr floor. remodel e bath and kitchen on 2nd fl, add new 1/2 bath on 2nd fl | $26,000 |
| Jul 16, 2014 | Completed final sign-off Mar 2015 | 1908 Lake St | Glc And Company | replace sheetrock in (1) bedroom, living room and dining room.Details
replace sheetrock in (1) bedroom, living room and dining room. | $20,000 |
| Jun 18, 2014 | Completed final sign-off Mar 2015 | 1908 Lake St | Glc And Company | unit-1910 replace 7 windows in front with fiberglass wood clad windows and 10 windows at rear and side with vinyl windows. unit-1908 replace 5 windows in front with fiberglass wood clad windows and 9 windows at rear and side with vinyl windows.Details
unit-1910 replace 7 windows in front with fiberglass wood clad windows and 10 windows at rear and side with vinyl windows. unit-1908 replace 5 windows in front with fiberglass wood clad windows and 9 windows at rear and side with vinyl windows. | $10,000 |
| Jun 18, 2014 | Completed final sign-off Jul 2016 | 838 27th Av | Glc And Company | 2/f bathroom remodel, remodel bathroom in kind, remodel 1 shower pan, 1 tub & 1 toilet & 1 sink. no structural work.Details
2/f bathroom remodel, remodel bathroom in kind, remodel 1 shower pan, 1 tub & 1 toilet & 1 sink. no structural work. | $10,000 |
| Jun 17, 2014 | Completed final sign-off Apr 2015 | 1775 34th Av | Glc And Company | new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room.Details
new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room. | $40,000 |
| Jun 13, 2014 | Completed final sign-off Apr 2015 | 1775 34th Av | Glc And Company | remodel (1) kitchen & bathroom & master bathroom.Details
remodel (1) kitchen & bathroom & master bathroom. | $20,000 |
| May 15, 2014 | Never finaled issued May 2014, no final | 3990 Folsom St | Glc And Company | to obtain final inspection for work approved under pa# 201104154190. all work is completeDetails
to obtain final inspection for work approved under pa# 201104154190. all work is complete | |
| May 15, 2014 | Never finaled issued May 2014, no final | 3990 Folsom St | Glc And Company | to obtain final inspection for work approved under pa# 201203065420. all work is completeDetails
to obtain final inspection for work approved under pa# 201203065420. all work is complete | |
| Apr 25, 2014 | Completed final sign-off Jul 2016 | 838 27th Av | Glc And Company | enlarge existing bathroom on ground floor. remodel (e) kitchen on 2nd floor. remove wall between kitchen and dining.Details
enlarge existing bathroom on ground floor. remodel (e) kitchen on 2nd floor. remove wall between kitchen and dining. | $30,000 |
| Apr 7, 2014 | Completed final sign-off Mar 2015 | 1910 Lake St | Glc And Company | kitchen remodel in kind.Details
kitchen remodel in kind. | $12,000 |
| Apr 7, 2014 | Completed final sign-off Mar 2015 | 1908 Lake St | Glc And Company | kitchen and bathroom remodel in kind. all new finishes.Details
kitchen and bathroom remodel in kind. all new finishes. | $23,000 |
| Apr 7, 2014 | Completed final sign-off Apr 2014 | 1454 40th Av | Glc And Company | dry rot at rear wall and under front bay window. stucco repair in kind. no structural work.Details
dry rot at rear wall and under front bay window. stucco repair in kind. no structural work. | $3,500 |
| Apr 3, 2014 | Completed final sign-off Jul 2016 | 2537 22nd Av | New Era Construction Co. ***Check Id****, Glc And Company, T & A Construction Inc | kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work.Details
kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work. | $6,000 |
| Mar 14, 2014 | Never finaled issued Mar 2014, no final | 280 San Leandro Wy | Glc And Company | to comply nov#201448681 on the sewer system.Details
to comply nov#201448681 on the sewer system. | $5,000 |
| Feb 4, 2014 | Completed final sign-off Mar 2014 | 1673 Church St | Glc And Company | administrative correction of use of building to remove the retail space per #2012-0925-0624. retail space converted to residential unit. delete occupancy code m.Details
administrative correction of use of building to remove the retail space per #2012-0925-0624. retail space converted to residential unit. delete occupancy code m. | |
| Feb 3, 2014 | Completed final sign-off Mar 2014 | 1673 Church St | Glc And Company | remove wall between storage room and kitchen. install 15 recess lightis in kitchen area. no work in kitchen.Details
remove wall between storage room and kitchen. install 15 recess lightis in kitchen area. no work in kitchen. | $15,000 |
| Jan 17, 2014 | Completed final sign-off Nov 2017 | 2420 Taraval St | Glc And Company | remodel existing kitchen in kind and 2 baths (one on 3rd and one on 2nd flr) repair dry rot @ front staircase, replacing stair stringer, less than 50% replacementDetails
remodel existing kitchen in kind and 2 baths (one on 3rd and one on 2nd flr) repair dry rot @ front staircase, replacing stair stringer, less than 50% replacement | $27,000 |
| Jan 6, 2014 | Completed final sign-off Dec 2014 | 3727 21st St | Glc And Company | 2 bathroom remodels in kind. replace 1 tub and 1 shower pan and all finishesDetails
2 bathroom remodels in kind. replace 1 tub and 1 shower pan and all finishes | $20,000 |
| Nov 21, 2013 | Completed final sign-off Dec 2013 | 1 Baker St | Glc And Company | remodel bathroom in hallway inkind - replace tub toilet, vanit and all tilework. relocate one light and replace exhaust fan 56 sq ft. work in unit 6c onlyDetails
remodel bathroom in hallway inkind - replace tub toilet, vanit and all tilework. relocate one light and replace exhaust fan 56 sq ft. work in unit 6c only | $9,000 |
| Jun 26, 2013 | Never finaled issued Jun 2013, no final | 2079 17th Av | Glc And Company | comply with nov# 201303944-repair damage drywall moulding in bathroom, replace toilet, install outlets in living room & kitchen.Details
comply with nov# 201303944-repair damage drywall moulding in bathroom, replace toilet, install outlets in living room & kitchen. | $500 |
| Apr 1, 2013 | Completed final sign-off Sep 2013 | 376 Chestnut St | Glc And Company | kitchen remodel in kind & bathroom remodel in kind & replace 6 rear windows, not visible from street. u factor max is 0.40. new recess lights in kitchen. comply with cec 150(n) for lighting.Details
kitchen remodel in kind & bathroom remodel in kind & replace 6 rear windows, not visible from street. u factor max is 0.40. new recess lights in kitchen. comply with cec 150(n) for lighting. | $25,000 |
| Mar 4, 2013 | Completed final sign-off Dec 2016 | 278 Capitol Av | Glc And Company | to erect 4 stories, no basement, 2 family dwellings.Details
to erect 4 stories, no basement, 2 family dwellings. | $400,000 |
| Mar 4, 2013 | Completed final sign-off Dec 2016 | 268 Capitol Av | Fong's Construction & Plumbing, Glc And Company | to erect 4 stories, no basement, 2 family dwelling units.Details
to erect 4 stories, no basement, 2 family dwelling units. | $400,000 |
| Jul 9, 2012 | Completed final sign-off Oct 2012 | 355 Hamilton St | Glc And Company | kitchen remodel in kind. replace cabinets, range, counter, floor tile, backsplash & install new appliances & paint. electrical upgrade.Details
kitchen remodel in kind. replace cabinets, range, counter, floor tile, backsplash & install new appliances & paint. electrical upgrade. | $13,000 |
| May 31, 2012 | Completed final sign-off Jul 2012 | 616 08th Av | Glc And Company | convert (e) storage room into entertainment room, add half bathroom at entertainment room on 1st floor (garage)Details
convert (e) storage room into entertainment room, add half bathroom at entertainment room on 1st floor (garage) | $12,000 |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 3990 Folsom St | Glc And Company | kitchen remodel (1) 2nd floor, bathroom remodel at ground floor. new code compliant stairs. install new skylights on 2nd floor.Details
kitchen remodel (1) 2nd floor, bathroom remodel at ground floor. new code compliant stairs. install new skylights on 2nd floor. | $50,000 |