T & A Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Jan 2015
- Last 24 months
- 0 permits filed
20 permits since 2000: 14 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2015 | Expired or cancelled cancelled Jan 2026 | 2468 15th Av | repair driveway concrete work.Details
repair driveway concrete work. | $1,000 |
| Dec 29, 2014 | Never finaled issued Jan 2015, no final | 596 Monterey Bl | convert e retail space to grocery storeDetails
convert e retail space to grocery store | $20,000 |
| Dec 12, 2014 | Never finaled issued Jan 2015, no final | 596 Monterey Bl | revision to bpa #201409035319; relocate (n) restroom per plan.Details
revision to bpa #201409035319; relocate (n) restroom per plan. | |
| Sep 3, 2014 | Never finaled issued Oct 2014, no final | 596 Monterey Bl | existing dry clean store to demo walls add accessible bathroom on 1st floor per plan. repair foundation per plan. t.i. under separate permit.Details
existing dry clean store to demo walls add accessible bathroom on 1st floor per plan. repair foundation per plan. t.i. under separate permit. | $20,000 |
| Jul 28, 2014 | Completed final sign-off Oct 2014 | 137 Paris St | remodel kitchen entirely with new cabinets, countertop, and fixtures. enlarge kitchen door opening.Details
remodel kitchen entirely with new cabinets, countertop, and fixtures. enlarge kitchen door opening. | $11,000 |
| Jul 2, 2014 | Completed final sign-off Jul 2014 | 1743 33rd Av | install floor and resurface existing stair with granite. permit to comply with nov 201482101 & 201481112. install do in tunnel entrance back 5' from opening to close from weather. install new door frame.Details
install floor and resurface existing stair with granite. permit to comply with nov 201482101 & 201481112. install do in tunnel entrance back 5' from opening to close from weather. install new door frame. | $1,000 |
| Apr 3, 2014 | Completed final sign-off Jul 2016 | 2537 22nd Av | kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work.Details
kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work. | $6,000 |
| Mar 18, 2014 | Completed final sign-off Feb 2015 | 327 Vienna St | inside demolition for damaged sheet rock in living room only for repair.Details
inside demolition for damaged sheet rock in living room only for repair. | $1,000 |
| Feb 19, 2014 | Completed final sign-off Sep 2014 | 2462 28th Av | revision to app# 201308214865. relocate kitchen and rearrange bathroom per plan.Details
revision to app# 201308214865. relocate kitchen and rearrange bathroom per plan. | $10,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 4196 Mission St | repair stairs: nov #20134971. to comply with nov 201341971. total repair not to exceed 50% of entire stair structure.Details
repair stairs: nov #20134971. to comply with nov 201341971. total repair not to exceed 50% of entire stair structure. | $500 |
| Nov 6, 2013 | Completed final sign-off Feb 2015 | 1425 Eucalyptus Dr | add deck at 2nd floor per plan, add 2 bedroms, 1 great room, 1 game room, office,and bathrooms on 1st floor per plan; enclose below existing family room at rear of building to create new bedroom.Details
add deck at 2nd floor per plan, add 2 bedroms, 1 great room, 1 game room, office,and bathrooms on 1st floor per plan; enclose below existing family room at rear of building to create new bedroom. | $35,000 |
| Nov 5, 2013 | Completed final sign-off May 2014 | 398 Winding Wy | as built. revision to app#201302150378 at ground floor. relocate bathroom, storage room and closet per plans. no structuraal change to plans.Details
as built. revision to app#201302150378 at ground floor. relocate bathroom, storage room and closet per plans. no structuraal change to plans. | |
| Oct 24, 2013 | Completed final sign-off Oct 2013 | 8 Admiral Av | to comply with complaint #201315801: repair/replace inoperable gas heating system.Details
to comply with complaint #201315801: repair/replace inoperable gas heating system. | $1,000 |
| Aug 21, 2013 | Completed final sign-off Sep 2014 | 2462 28th Av | 1)add 2 bedroom, one bathroom, playroom on 1st floor per plan. 2)add one bathroom, remodel kitchen on 2nd floor per plan. 3)add deck at rear per plan.Details
1)add 2 bedroom, one bathroom, playroom on 1st floor per plan. 2)add one bathroom, remodel kitchen on 2nd floor per plan. 3)add deck at rear per plan. | $60,000 |
| Aug 15, 2013 | Completed final sign-off Aug 2014 | 2586 San Jose Av | interior remodeling-ground floor, remove partition wall, add half bathroom. enlarge family room in (e) location. remodel kitchen & 2 bathrooms on 2nd floor in (e) location. add full bathroom on 3rd floor, replace nob & tube wiringDetails
interior remodeling-ground floor, remove partition wall, add half bathroom. enlarge family room in (e) location. remodel kitchen & 2 bathrooms on 2nd floor in (e) location. add full bathroom on 3rd floor, replace nob & tube wiring | $50,000 |
| Aug 6, 2013 | Completed final sign-off Dec 2013 | 1250 31st Av | add 3 bedrooms, family room and game room on 1st floor per plan. repair foundation per plan.Details
add 3 bedrooms, family room and game room on 1st floor per plan. repair foundation per plan. | $48,000 |
| Jul 30, 2013 | Never finaled issued Aug 2013, no final | 670 Lisbon St | interior remodel on 2nd floor per plan & repair deck in kind less than 50%. add master bedroom & bathroom on 1st floor per plan. repair retaining wall at rear.Details
interior remodel on 2nd floor per plan & repair deck in kind less than 50%. add master bedroom & bathroom on 1st floor per plan. repair retaining wall at rear. | $67,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2014 | 2586 San Jose Av | to complete work and to obtain final inspection for work approved under app#200609273487.Details
to complete work and to obtain final inspection for work approved under app#200609273487. | $15,000 |
| Jun 20, 2013 | Completed final sign-off Apr 2014 | 1743 33rd Av | repair tile in the bathroom on 2/f. tile work only.Details
repair tile in the bathroom on 2/f. tile work only. | $1,500 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 398 Winding Wy | interior remodel at gr floor. add 2 baths, 2 bedrooms, media room, study. structural work: add centerline footing, reinforce existing footing at rear of buildingDetails
interior remodel at gr floor. add 2 baths, 2 bedrooms, media room, study. structural work: add centerline footing, reinforce existing footing at rear of building | $60,000 |