Gary Varum
- Listed as
- architect, designer, engineer
- Firm
- Gary S. Varum Stru Engr
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Sep 2026
109 permits since 2000 (engineer on 87 permits, architect on 21 permits, designer on 1 permit): 80 completed, 11 in progress, 8 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 280 Green St | Manzyuk Enterprises Inc | building modernization and voluntary seismic upgrade. remodel of 6 kitchens and 6 bathrooms. construction of 2 new bathrooms. replacement of all aluminium windows. rmeodel of roof deck.Details
building modernization and voluntary seismic upgrade. remodel of 6 kitchens and 6 bathrooms. construction of 2 new bathrooms. replacement of all aluminium windows. rmeodel of roof deck. | $147,500 |
| Sep 8, 2026 | In progress issued Sep 2026 | 1175 Pacific Av | Manzyuk Enterprises Inc | interior remodel to residential building in the rear of the property including replacemant of kitchen cabinets and appliances in the existing kitchen & fixture rearrangement in the existing bathrooms, new laundry cabinets.Details
interior remodel to residential building in the rear of the property including replacemant of kitchen cabinets and appliances in the existing kitchen & fixture rearrangement in the existing bathrooms, new laundry cabinets. | $32,500 |
| Sep 4, 2026 | In progress issued Sep 2026 | 1381 07th Av | Manzyuk Enterprises Inc | 3rd floor: remodel of existing 3rd floor unit 1381 7th ave includes relocation of kitchen, remodel 2 bathrooms, addition of 1 bathroom and laundry cabinet.Details
3rd floor: remodel of existing 3rd floor unit 1381 7th ave includes relocation of kitchen, remodel 2 bathrooms, addition of 1 bathroom and laundry cabinet. | $67,500 |
| Aug 17, 2026 | In progress issued Sep 2026 | 1177 Pacific Av | Manzyuk Enterprises Inc | full remodel: kitchen and 3 baths, addition of 1-1/2 baths, replacement of alum windows with double glaszed alum windows of matching config and operation.Details
full remodel: kitchen and 3 baths, addition of 1-1/2 baths, replacement of alum windows with double glaszed alum windows of matching config and operation. | $65,000 |
| Jul 6, 2026 | In progress filed Jul 2026, not yet issued | 607 Oak St | construct 2 adu's at 1/f.Details
construct 2 adu's at 1/f. | $72,500 | |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 3675 24th St | erect (n) 2-story type vb detached adu in the rear.Details
erect (n) 2-story type vb detached adu in the rear. | $155,000 | |
| May 11, 2026 | Completed final sign-off Jun 2026 | 1235 Waller St | Manzyuk Enterprises Inc | rev to pa# 2025-0225-0613: replace (e) metal guard at roof terrace with prefabricated glass guardDetails
rev to pa# 2025-0225-0613: replace (e) metal guard at roof terrace with prefabricated glass guard | $2,500 |
| Jan 16, 2026 | In progress filed Jan 2026, not yet issued | 1235 Waller St | construction of 2 adus on 3/f by conversion of (e) auxiliary space 2025-006431prj. 1 adu will be 1 bed, 1 bathroom. 2nd adu will be a studio unit with 1 bath.Details
construction of 2 adus on 3/f by conversion of (e) auxiliary space 2025-006431prj. 1 adu will be 1 bed, 1 bathroom. 2nd adu will be a studio unit with 1 bath. | $89,500 | |
| Dec 26, 2025 | Completed final sign-off Apr 2026 | 1375 Sacramento St | Manzyuk Enterprises Inc | unit 3- partial interior remodel including reconfiguration of habitable rooms and installation of in unit clothes washer and dryerDetails
unit 3- partial interior remodel including reconfiguration of habitable rooms and installation of in unit clothes washer and dryer | $37,500 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 910 Presidio Av | Manzyuk Enterprises Inc | unit 8- kitchen replace cabintry and appliances. bathroom replace fixtures, install (n) w&d comboDetails
unit 8- kitchen replace cabintry and appliances. bathroom replace fixtures, install (n) w&d combo | $37,500 |
| Nov 24, 2025 | Completed final sign-off May 2026 | 1490 Clay St | Manzyuk Enterprises Inc | interior remodel of unit includeing remodel of kitchen and bathroom and adding (2) new bathroomsDetails
interior remodel of unit includeing remodel of kitchen and bathroom and adding (2) new bathrooms | $59,500 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 615 Oak St | Manzyuk Enterprises Inc | #615: interior remodel includes kitchen remodel, remodel of 2 bathrooms, & construction of 1 bathroom. convert living room to bedroom with eero.Details
#615: interior remodel includes kitchen remodel, remodel of 2 bathrooms, & construction of 1 bathroom. convert living room to bedroom with eero. | $47,500 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 167 Dolores St | Manzyuk Enterprises Inc | units #3 & #4 on 3rd flr: interior remodel includes kitchen relocation & replacement of fixtures in bathrooms. relocate bedrooms.Details
units #3 & #4 on 3rd flr: interior remodel includes kitchen relocation & replacement of fixtures in bathrooms. relocate bedrooms. | $49,500 |
| Nov 10, 2025 | In progress issued Nov 2025 | 299 Corbett Av | Manzyuk Enterprises Inc | recommencement and completion of work approved under 201908229595Details
recommencement and completion of work approved under 201908229595 | |
| Nov 7, 2025 | Completed final sign-off Jun 2026 | 475 20th Av | Master V Construction | renovation of kitchen. replacement of (2) existing vinyl lightwell windows with (1) new vinyl window of equal glazing area in same opening. no change to egress or energy compliance.Details
renovation of kitchen. replacement of (2) existing vinyl lightwell windows with (1) new vinyl window of equal glazing area in same opening. no change to egress or energy compliance. | $5,000 |
| Sep 17, 2025 | Completed final sign-off Mar 2026 | 617 Oak St | Manzyuk Enterprises Inc | unit 617 and 619- interior remodel to(e)kitchens& bathrooms, addition of 1 full and 1/2 bathrooms in unit 617 and 1 full bathroom in unit 619. replacmeent of (e) windows with double glazed vinyl windows of matching configuration and operation for rear and side windows.for rear and side windows only.Details
unit 617 and 619- interior remodel to(e)kitchens& bathrooms, addition of 1 full and 1/2 bathrooms in unit 617 and 1 full bathroom in unit 619. replacmeent of (e) windows with double glazed vinyl windows of matching configuration and operation for rear and side windows.for rear and side windows only. | $57,600 |
| Sep 10, 2025 | In progress issued Feb 2026 | 299 Corbett Av | Manzyuk Enterprises Inc | rev 201908229595. additionally, units 1, 2, 3 and 4 relocation of kitchens, addition of 2 bathrooms, relocation of 4 existing bathrooms and general seismic upgrade. replacement of all existing windows with vynil windows of matching configuration and operationDetails
rev 201908229595. additionally, units 1, 2, 3 and 4 relocation of kitchens, addition of 2 bathrooms, relocation of 4 existing bathrooms and general seismic upgrade. replacement of all existing windows with vynil windows of matching configuration and operation | $125,000 |
| Jul 31, 2025 | Completed final sign-off Mar 2026 | 3678 16th St | Occidental Express | comply w/planning nov 20220115359 enf work replacement in-kind; filing in of rear 1sr fl wall including installing of windows & door; leveling roof over rear porch; replacing of rear stair and landing (in-kind) from 3rd fl to rear yard and stair from 2nd fl to rear yard to comply withDetails
comply w/planning nov 20220115359 enf work replacement in-kind; filing in of rear 1sr fl wall including installing of windows & door; leveling roof over rear porch; replacing of rear stair and landing (in-kind) from 3rd fl to rear yard and stair from 2nd fl to rear yard to comply with | |
| Jun 10, 2025 | Completed final sign-off Apr 2026 | 1235 Waller St | Manzyuk Enterprises Inc | replacement of single pane aluminum windows in kind: front and side bay windows 12; 2st & 2nd floor windows facing west 2. total 14 windows. new windows to be aluminum frame & double pane. same size, same location & opening, same operation, no structural work. u factor 0.30 maxDetails
replacement of single pane aluminum windows in kind: front and side bay windows 12; 2st & 2nd floor windows facing west 2. total 14 windows. new windows to be aluminum frame & double pane. same size, same location & opening, same operation, no structural work. u factor 0.30 max | $13,500 |
| Apr 10, 2025 | Completed final sign-off Sep 2025 | 1486 Clay St | Manzyuk Enterprises Inc | unit #1486 & 1488: interior modification includes kitchen and bathroom remodel. addition of 2 bathrooms to each unit aka 1486-88 clayDetails
unit #1486 & 1488: interior modification includes kitchen and bathroom remodel. addition of 2 bathrooms to each unit aka 1486-88 clay | $73,500 |
| Mar 11, 2025 | Completed final sign-off Sep 2026 | 1235 Waller St | Manzyuk Enterprises Inc | horizontal expansion of the 3/f and enlargement of one residential unit facing waller st. relocate kitchen, remodel 1 bathroom, construct 2 new bathrooms.Details
horizontal expansion of the 3/f and enlargement of one residential unit facing waller st. relocate kitchen, remodel 1 bathroom, construct 2 new bathrooms. | $102,300 |
| Dec 20, 2024 | Completed final sign-off Aug 2025 | 900 Presidio Av | Manzyuk Enterprises Inc | unit 8- kitchen replace cabintry and appliances. bathroom replace fixtures, install (n) w&d comboDetails
unit 8- kitchen replace cabintry and appliances. bathroom replace fixtures, install (n) w&d combo | $17,500 |
| Oct 15, 2024 | Completed final sign-off May 2025 | 4492 Mission St | Manzyuk Enterprises Inc | remodeling of existing 2nd floor single residential unit, inlcuding relocation of kitchen and bathroom, addition of 1 full bathroom and relocation of interior partition wallsDetails
remodeling of existing 2nd floor single residential unit, inlcuding relocation of kitchen and bathroom, addition of 1 full bathroom and relocation of interior partition walls | $127,000 |
| Sep 17, 2024 | Completed final sign-off Dec 2024 | 1235 Waller St | Manzyuk Enterprises Inc | removal of rear yard pool coping, construction of a pt wood deck supported by a permiter concrete beam and steel angle support structure at grade levelDetails
removal of rear yard pool coping, construction of a pt wood deck supported by a permiter concrete beam and steel angle support structure at grade level | $5,500 |
| Sep 6, 2024 | In progress issued Sep 2024 | 4585 Mission St | to comply with abe ord 51-16 program 202210054901. request an unreasonable hardship. abe #202210054901Details
to comply with abe ord 51-16 program 202210054901. request an unreasonable hardship. abe #202210054901 | ||
| Jul 29, 2024 | Completed final sign-off Jul 2025 | 1235 Waller St | Manzyuk Enterprises Inc | in units # 5, 6, 9: relocation of kitchens, add (n) laundry closet, and create new bedroom in each unit. in units # 5, 9: remodel (e) bathrooms.Details
in units # 5, 6, 9: relocation of kitchens, add (n) laundry closet, and create new bedroom in each unit. in units # 5, 9: remodel (e) bathrooms. | $65,000 |
| Jul 22, 2024 | In progress issued Jan 2025 | 2595 Folsom St | Barber Construction | remodel of 2nd floor residential space. division of current single residential unit into 2 residential units. voluntary strengthening of 2nd story of building.Details
remodel of 2nd floor residential space. division of current single residential unit into 2 residential units. voluntary strengthening of 2nd story of building. | $125,000 |
| Jul 8, 2024 | Completed final sign-off Apr 2025 | 45 Turquoise Wy | Manzyuk Enterprises Inc | interior modification: convert 1st/f storage to habitable area. addition of 2 full baths. replace of single pane alum. window w/ double-pane windows. remodel of kitchen & 2 bathrooms & 1) half bathroom windows at front to be in kind. modify (e) rear deck with new openingDetails
interior modification: convert 1st/f storage to habitable area. addition of 2 full baths. replace of single pane alum. window w/ double-pane windows. remodel of kitchen & 2 bathrooms & 1) half bathroom windows at front to be in kind. modify (e) rear deck with new opening | $58,500 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 1806 28th Av | Ibr Construction Inc | construct retaining wall in the rear of the propertyDetails
construct retaining wall in the rear of the property | $12,500 |
| Jan 18, 2024 | Completed final sign-off Oct 2024 | 4490 Mission St | Manzyuk Enterprises Inc | revision to pa# 201609026754, alterations to 1/f level commercial space, restoration of storefront to its 1960s appearance. partial voluntary lateral upgrade (no calculations submitted. no special inspection).Details
revision to pa# 201609026754, alterations to 1/f level commercial space, restoration of storefront to its 1960s appearance. partial voluntary lateral upgrade (no calculations submitted. no special inspection). | |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 751 Capp St | demolition of remnants of fire escape at south (side) elevation.Details
demolition of remnants of fire escape at south (side) elevation. | $500 | |
| Aug 25, 2023 | Completed final sign-off Oct 2025 | 2595 Folsom St | Barber Construction | tenant improvments for 1st flr dental office. voluntary seismic upgrade at the 1st story. hange of use from office to health service.Details
tenant improvments for 1st flr dental office. voluntary seismic upgrade at the 1st story. hange of use from office to health service. | $125,000 |
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 140 Portola Dr | Jva Management Corp | revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101.Details
revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101. | $27,500 |
| Jul 21, 2023 | Never finaled filed Jul 2023, never issued | 2458 33rd Av | construct an adu in repurposed space of 1st story and under horizontal expansion of 2nd story. horizontal expansion of 2nd story. voluntary seismic upgrade under ab-094.Details
construct an adu in repurposed space of 1st story and under horizontal expansion of 2nd story. horizontal expansion of 2nd story. voluntary seismic upgrade under ab-094. | $245,000 | |
| Jun 27, 2023 | Completed final sign-off Jul 2023 | 3675 24th St | Manzyuk Enterprises Inc | unit #7: revision to pa# 202212067753. reconfiguration of 1 bathroom.Details
unit #7: revision to pa# 202212067753. reconfiguration of 1 bathroom. | $100 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 1026 Capp St | Manzyuk Enterprises Inc | construct new site steps between front and rear portion of propertyDetails
construct new site steps between front and rear portion of property | $1,000 |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 121 Scott St | G B U Construction Development | to comply with nov# 202308955. underpinning of foundation under north property line wall near north west corner of building (total length of under pinning 7'-6")Details
to comply with nov# 202308955. underpinning of foundation under north property line wall near north west corner of building (total length of under pinning 7'-6") | $1,500 |
| May 23, 2023 | Completed final sign-off Jul 2023 | 3675 24th St | Avm Construction | revision to 202212067753. clarification of 1st fl window sizes and locations per nov 202301837. modification of spread footing in the front to accommodate field conditions.Details
revision to 202212067753. clarification of 1st fl window sizes and locations per nov 202301837. modification of spread footing in the front to accommodate field conditions. | $1,000 |
| Mar 1, 2023 | Expired or cancelled withdrawn Apr 2026 | 3675 24th St | erect a two story,one dwelling adu at the rear of main building type vb.Details
erect a two story,one dwelling adu at the rear of main building type vb. | $155,000 | |
| Feb 22, 2023 | Completed final sign-off Feb 2024 | 1664 Fell St | Avm Construction | construct temporary shoring of the structure to remain in place during the process of foundation replacement per bpa 202206015360.upon complete of foundation replacement project all temporary shoring shall be removed.Details
construct temporary shoring of the structure to remain in place during the process of foundation replacement per bpa 202206015360.upon complete of foundation replacement project all temporary shoring shall be removed. | $4,500 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 3675 24th St | Manzyuk Enterprises Inc | construct one accessory dwelling unit (adu) per state requirements at the 1st floor to replace existing laundry and a portion of the crawl space.Details
construct one accessory dwelling unit (adu) per state requirements at the 1st floor to replace existing laundry and a portion of the crawl space. | $35 |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 1664 Fell St | Avm Construction | modification of rear portion of bldg by raising roof at the rear by 1'9". rev 202204273140,enclose (e) rear deck.rev 202206015360, 202111092095,concrete stem walls, lower 1/f by 12". rev 202302222384, site rtng wall to support ext. stair, correction of all items nov202305711.Details
modification of rear portion of bldg by raising roof at the rear by 1'9". rev 202204273140,enclose (e) rear deck.rev 202206015360, 202111092095,concrete stem walls, lower 1/f by 12". rev 202302222384, site rtng wall to support ext. stair, correction of all items nov202305711. | $4,500 |
| Dec 6, 2022 | Completed final sign-off Jul 2023 | 3675 24th St | Avm Construction | #7:1) repair of dryrot inkind. voluntary seismic upgrade per ab-094.relocatn of kitchen, remodel of 1 full bathroom & addition of 1 bathroom. partial alteration of front elevation.install 3 windows at 1st story instead of extg. 2)replacement of 1 window & enlargement of 1 widnow at east side elevatnDetails
#7:1) repair of dryrot inkind. voluntary seismic upgrade per ab-094.relocatn of kitchen, remodel of 1 full bathroom & addition of 1 bathroom. partial alteration of front elevation.install 3 windows at 1st story instead of extg. 2)replacement of 1 window & enlargement of 1 widnow at east side elevatn | $47,500 |
| Nov 21, 2022 | Completed final sign-off May 2023 | 3675 24th St | Avm Construction | units 1,2,4,5: relocation of full bath and kitchen, modification of windows on west exterior wall, addition of bedroom. units 3,6: relocation of full bath and kitchen, new bath & addition of bedroom. replace single pane aluminum window on side and rear elevation with double pane vinyl windows.Details
units 1,2,4,5: relocation of full bath and kitchen, modification of windows on west exterior wall, addition of bedroom. units 3,6: relocation of full bath and kitchen, new bath & addition of bedroom. replace single pane aluminum window on side and rear elevation with double pane vinyl windows. | $174,600 |
| Aug 15, 2022 | Completed final sign-off Mar 2023 | 3914 Moraga St | Prime Custom Construction Inc | incorporate a portion of unused space at 1st floor into the habitable space of the single family house, construct one full bathroom, and powder room.Details
incorporate a portion of unused space at 1st floor into the habitable space of the single family house, construct one full bathroom, and powder room. | $69,500 |
| Jun 1, 2022 | Completed final sign-off Feb 2024 | 1664 Fell St | Avm Construction | revision to approved pa 2021-1109-2095 relocation of footing for voluntary seismic upgradeDetails
revision to approved pa 2021-1109-2095 relocation of footing for voluntary seismic upgrade | |
| Apr 27, 2022 | Completed final sign-off Feb 2024 | 1664 Fell St | Avm Construction | unit 1664: addition of new family room and new bathroom, relocate extg kitchen & extg bathroom, addition of new bathroom. unit 1670 & 1668: relocate extg kitchen and extg bathroom & addition of full bathroom. 1666: minor work. replace stairs in back with new code conforming construction.Details
unit 1664: addition of new family room and new bathroom, relocate extg kitchen & extg bathroom, addition of new bathroom. unit 1670 & 1668: relocate extg kitchen and extg bathroom & addition of full bathroom. 1666: minor work. replace stairs in back with new code conforming construction. | $124,500 |
| Mar 21, 2022 | Completed final sign-off Aug 2022 | 875 Broadway | Jva Management Corp | unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6.Details
unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6. | $17,500 |
| Feb 11, 2022 | Completed final sign-off Sep 2022 | 2271 15th Av | City Construction Group | replace 1st floor window 6 foot wide with 3 foot wide door (in the rear) and infill door on side elevation (south). approved bpa 202101072281Details
replace 1st floor window 6 foot wide with 3 foot wide door (in the rear) and infill door on side elevation (south). approved bpa 202101072281 | $100 |
| Nov 9, 2021 | Completed final sign-off Feb 2024 | 1664 Fell St | voluntary seismic upgrade per ab-094. removal of existing chimneys and fireplaces.Details
voluntary seismic upgrade per ab-094. removal of existing chimneys and fireplaces. | $50,000 | |
| Feb 24, 2021 | Completed final sign-off Jul 2023 | 1024 Capp St | construction of new accessory dweeling unit (adu) building in the rear (west) of the property.Details
construction of new accessory dweeling unit (adu) building in the rear (west) of the property. | $170,000 | |
| Sep 19, 2020 | Never finaled issued Aug 2021, no final | 1237 08th Av | G B U Construction Development | interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell.Details
interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell. | $15,000 |
| Aug 21, 2020 | Completed final sign-off Sep 2021 | 3678 16th St | City Construction Group | revision to approved pa# 201912189918: reconfiguration at all floors; including relocation of kitchens and bathrooms and elimination of 1 bathroom. project is currently in initial stages of construction.Details
revision to approved pa# 201912189918: reconfiguration at all floors; including relocation of kitchens and bathrooms and elimination of 1 bathroom. project is currently in initial stages of construction. | |
| Aug 20, 2020 | Completed final sign-off Nov 2022 | 1026 Capp St | City Construction Group | revision to 201911076685. separate lower 2 story unit into 2 separate units. install 1 additonal kitchen. remove 1/2 bath at 1st fl and install 2 new baths. reconstruct exterior stair from 3rd and 2nd fl in rear. project is currently in initial stages of constructionDetails
revision to 201911076685. separate lower 2 story unit into 2 separate units. install 1 additonal kitchen. remove 1/2 bath at 1st fl and install 2 new baths. reconstruct exterior stair from 3rd and 2nd fl in rear. project is currently in initial stages of construction | $4,500 |
| Dec 18, 2019 | Completed final sign-off Sep 2021 | 3678 16th St | City Construction Group | 1/fl: convert extg workshop & storage space into 1 dwelling unit, extg garage to remain. 2/fl: remodel 1 extg bathroom & construct 3 nw bathrooms, remodel kitchen. 3rd fl: remodel 1 extg bathroom & construct 2 nw bathrms, remodel kitchen. repair of bldg: reconstruct in kind severly decayed dryrotDetails
1/fl: convert extg workshop & storage space into 1 dwelling unit, extg garage to remain. 2/fl: remodel 1 extg bathroom & construct 3 nw bathrooms, remodel kitchen. 3rd fl: remodel 1 extg bathroom & construct 2 nw bathrms, remodel kitchen. repair of bldg: reconstruct in kind severly decayed dryrot | $178,000 |
| Nov 26, 2019 | Completed final sign-off Nov 2022 | 1454 South Van Ness Av | City Construction Group | unit #3: relocate and remodel kitchen & full bathroom. construct new 3/4 bathroom. replace deteriorated wood (dryrot) in kind. replace existing gypsum board where required for plumbing and electrical lines (in kind).adding one bedroom on second floorDetails
unit #3: relocate and remodel kitchen & full bathroom. construct new 3/4 bathroom. replace deteriorated wood (dryrot) in kind. replace existing gypsum board where required for plumbing and electrical lines (in kind).adding one bedroom on second floor | $27,500 |
| Nov 7, 2019 | Completed final sign-off Nov 2022 | 1026 Capp St | City Construction Group | 1st floor: incorporate extg workroom & storage space into extg lower unit. 2nd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. 3rd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. all floors: reconstruct in severely decayed (dryrot)roof,Details
1st floor: incorporate extg workroom & storage space into extg lower unit. 2nd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. 3rd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. all floors: reconstruct in severely decayed (dryrot)roof, | $123,600 |
| Oct 15, 2019 | Completed final sign-off Jun 2020 | 753 Capp St | City Construction Group | 3rd story work: revision to app#201905069834. rebuilt framing of the rear portion of the bldg which was in severely decayed condition (dryrot) size in plan 6'-4"x21'-6". rebuilding to be in kind. replace extg interior finishes of gypsum plaster with 5/8" typex gypsum board.Details
3rd story work: revision to app#201905069834. rebuilt framing of the rear portion of the bldg which was in severely decayed condition (dryrot) size in plan 6'-4"x21'-6". rebuilding to be in kind. replace extg interior finishes of gypsum plaster with 5/8" typex gypsum board. | $21,400 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 753 Capp St | Pro Plumbing & Fire Sprinkler Inc | remove sprinkler requirement for remodel unit. administrative permit onlyDetails
remove sprinkler requirement for remodel unit. administrative permit only | |
| May 13, 2019 | Completed final sign-off Oct 2019 | 1454 South Van Ness Av | Citybest Construction | unit #2: revision to app#201902183330. construct additional 3/4 bathroom at 1st floor.Details
unit #2: revision to app#201902183330. construct additional 3/4 bathroom at 1st floor. | $14,500 |
| May 6, 2019 | Completed final sign-off Jun 2020 | 753 Capp St | City Construction Group | 1st fl - relocation of existing unit 753a from 3rd fl; 3rd fl - 753b kitchen remodel, additionof 1 3/4 bathroom, replacement of 1 existing full bathroom with 1 3/4 bathroom, relocation of 1 existing full bathroom, general renovation of 3rd fl residential unitDetails
1st fl - relocation of existing unit 753a from 3rd fl; 3rd fl - 753b kitchen remodel, additionof 1 3/4 bathroom, replacement of 1 existing full bathroom with 1 3/4 bathroom, relocation of 1 existing full bathroom, general renovation of 3rd fl residential unit | $114,500 |
| May 1, 2019 | Completed final sign-off Dec 2019 | 565 Page St | Citybest Construction | work in units 3 and 4 only - relocation of kitchens and 1 bathroom per unit. addition of 1 bathroom per unitDetails
work in units 3 and 4 only - relocation of kitchens and 1 bathroom per unit. addition of 1 bathroom per unit | $46,500 |
| Apr 22, 2019 | Never finaled issued May 2021, no final | 2 Henry Adams St | C C I Commercial Construction & Improv | exterior facade improvement & minor interior work include facade repair, window & doors. restoration & aesthetic improvements. new metal awnings. demo of portion of 1 bay @ (e) ground flr facade & demo of portion of same bay interior floor framing & incl structural framing for new flr. mep seperate.Details
exterior facade improvement & minor interior work include facade repair, window & doors. restoration & aesthetic improvements. new metal awnings. demo of portion of 1 bay @ (e) ground flr facade & demo of portion of same bay interior floor framing & incl structural framing for new flr. mep seperate. | $350,000 |
| Feb 12, 2019 | Completed final sign-off Jan 2020 | 565 Page St | City Construction Group, Reliable Construction Inc | construction of one accessory dwelling unit (adu) at the 1st floor. proposed unit includes one habitable room, kitchen and 3/4 bathroom under ordinance no. 162-16Details
construction of one accessory dwelling unit (adu) at the 1st floor. proposed unit includes one habitable room, kitchen and 3/4 bathroom under ordinance no. 162-16 | $43,500 |
| Jan 14, 2019 | Completed final sign-off Sep 2019 | 1454 South Van Ness Av | Reliable Construction Inc | installation of roof deck over eastern portion of the roof of the (e) building. maher n/a.Details
installation of roof deck over eastern portion of the roof of the (e) building. maher n/a. | $24,750 |
| Dec 28, 2018 | Completed final sign-off Dec 2019 | 565 Page St | Citybest Construction | legalization of (e) in-law unit in basement @ south end of bldg. includes relocation of kitchen, installation of (1) 3/4 bathroom & (1) full bathroom, construction of exterior stairs in west light court and passageway along east property line. legalization under ordinance #43-14.Details
legalization of (e) in-law unit in basement @ south end of bldg. includes relocation of kitchen, installation of (1) 3/4 bathroom & (1) full bathroom, construction of exterior stairs in west light court and passageway along east property line. legalization under ordinance #43-14. | $18,550 |
| Oct 31, 2018 | Completed final sign-off Sep 2019 | 565 Page St | Reliable Construction Inc | modification of extg dwelling units 1,2,5, & 7 including relocation of kitchen, remodeling of extg bathroom and installation of one new bathroom in each of unit 1,2,5, & 7Details
modification of extg dwelling units 1,2,5, & 7 including relocation of kitchen, remodeling of extg bathroom and installation of one new bathroom in each of unit 1,2,5, & 7 | $94,500 |
| Aug 24, 2018 | Completed final sign-off Dec 2019 | 1773 11th Av | Citybest Construction | legalization of dwelling unit installed without a permit. per ordinance 43-14. location of unit is 1st floorDetails
legalization of dwelling unit installed without a permit. per ordinance 43-14. location of unit is 1st floor | $13,500 |
| Jun 8, 2018 | Completed final sign-off Mar 2019 | 682 06th Av | Jva Management Corp | remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rearDetails
remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rear | $69,500 |
| Aug 15, 2017 | Completed final sign-off Sep 2018 | 1642 Funston Av | to comply nov#201779901, repair existing rear deck., extend existing guardrail to 42" above deck.Details
to comply nov#201779901, repair existing rear deck., extend existing guardrail to 42" above deck. | $3,700 | |
| Dec 27, 2016 | Completed final sign-off Dec 2018 | 900 Presidio Av | legalization of a dwelling unit installed without a permit per ordinance no. 43-14.Details
legalization of a dwelling unit installed without a permit per ordinance no. 43-14. | $200 | |
| Dec 19, 2016 | Completed final sign-off Sep 2018 | 910 Presidio Av | add unit per ord 162-16. convert existing storage space at rear to accessory dwelling unit (adu). all work within existing building envelope. the adu will have 1 kitchen & 1 full bathroom.Details
add unit per ord 162-16. convert existing storage space at rear to accessory dwelling unit (adu). all work within existing building envelope. the adu will have 1 kitchen & 1 full bathroom. | $38,500 | |
| Jul 9, 2015 | Completed final sign-off Dec 2016 | 74 Blake St | rev. 201501317585 -to install exterior insulation &finishes system (eifs) at west, south and east exterior wall as substitution for cement plaster and hardie board siding per approved app#201401317585. the bldg is located in the rear of the lot and is completely invisible from the street.Details
rev. 201501317585 -to install exterior insulation &finishes system (eifs) at west, south and east exterior wall as substitution for cement plaster and hardie board siding per approved app#201401317585. the bldg is located in the rear of the lot and is completely invisible from the street. | ||
| Jun 15, 2015 | Completed final sign-off Dec 2016 | 74 Blake St | rev to pa# 201401317585, install 3 skylights at 2nd floor. not visible from the street.Details
rev to pa# 201401317585, install 3 skylights at 2nd floor. not visible from the street. | $700 | |
| Jan 31, 2014 | Completed final sign-off Dec 2016 | 74 Blake St | to erect 2 stories, no basement, single family dwelling.Details
to erect 2 stories, no basement, single family dwelling. | $175,000 | |
| Jan 31, 2014 | Completed final sign-off May 2015 | 74 Blake St | to demolish 2 stories of 1 single family dwelling (rear bldg)Details
to demolish 2 stories of 1 single family dwelling (rear bldg) | $3,500 | |
| Jan 27, 2014 | Expired or cancelled withdrawn Jan 2014 | 74 Blake St | reconstruct extg rear cottage per sfpc section 181c.2Details
reconstruct extg rear cottage per sfpc section 181c.2 | $175,000 | |
| Oct 29, 2013 | Completed final sign-off Aug 2017 | 81 Rockwood Ct | construct 2 full bathrooms and enclose space under the existing deck in the rear at ground floor to create one bedroom, office and family room.Details
construct 2 full bathrooms and enclose space under the existing deck in the rear at ground floor to create one bedroom, office and family room. | $37,500 | |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 370 Fillmore St | #1- remodel kitchen & bathroom, construct new bathroom in unit #1.Details
#1- remodel kitchen & bathroom, construct new bathroom in unit #1. | $21,500 | |
| Jul 22, 2013 | Completed final sign-off Dec 2014 | 20 Wood St | construct shaft for residential elevator to serve both units.Details
construct shaft for residential elevator to serve both units. | $4,500 | |
| May 9, 2013 | Never finaled issued Aug 2014, no final | 53 Manzanita Av | this work will result in creation of a new unit. construct new kitchen. construct 2 wood stud-framed partition walls at 1st floor.Details
this work will result in creation of a new unit. construct new kitchen. construct 2 wood stud-framed partition walls at 1st floor. | $14,500 | |
| Mar 13, 2013 | Never finaled issued Mar 2013, no final | 74 Blake St | rear bldg - the proposed work includes removal of a portion of existing bldg 74 blake st that was constructed without a permit & construction of 1-hour rated wall along south property line. (historic resourc eevaluation response by dcp of 01-17-13 determined: no historic resource present.)Details
rear bldg - the proposed work includes removal of a portion of existing bldg 74 blake st that was constructed without a permit & construction of 1-hour rated wall along south property line. (historic resourc eevaluation response by dcp of 01-17-13 determined: no historic resource present.) | $6,000 | |
| Mar 13, 2013 | Completed final sign-off Apr 2018 | 80 Blake St | vacant lot - proposed work includes removal of the area of existing bldg that encroaches into block 1068 lot 003. this permit application will remove all illegal construction on 80 blake st. (a seperate bldg permit will be obtained for 74 blake st.)Details
vacant lot - proposed work includes removal of the area of existing bldg that encroaches into block 1068 lot 003. this permit application will remove all illegal construction on 80 blake st. (a seperate bldg permit will be obtained for 74 blake st.) | $1,500 | |
| Jan 15, 2013 | Completed final sign-off Oct 2013 | 61 Rockwood Ct | expand (e) 2nd floor deck in the rear of the house, top of deck ia 9ft above grade.Details
expand (e) 2nd floor deck in the rear of the house, top of deck ia 9ft above grade. | $3,400 | |
| Oct 31, 2012 | Completed final sign-off Oct 2014 | 683 Spruce St | modify first and 2nd floor plans. remodel extg kitchen and bathroom and install 2 new bathrooms. convert storage area at 1st floor to living space. construct deck in rear at 9'-0 above extg grade. replace 2nd floor windows at front with double glazed wood windows.Details
modify first and 2nd floor plans. remodel extg kitchen and bathroom and install 2 new bathrooms. convert storage area at 1st floor to living space. construct deck in rear at 9'-0 above extg grade. replace 2nd floor windows at front with double glazed wood windows. | $47,000 | |
| Oct 10, 2012 | Expired or cancelled cancelled Jan 2026 | 76 Blake St | install decks at 2nd & 3rd floors at the rear of building to replace (e) exterior stairs. proposed construction will be fully screened from view by (e) 2-story building w/ peaked roof at the rear of subject property.Details
install decks at 2nd & 3rd floors at the rear of building to replace (e) exterior stairs. proposed construction will be fully screened from view by (e) 2-story building w/ peaked roof at the rear of subject property. | $4,500 | |
| Aug 27, 2012 | Completed final sign-off Nov 2012 | 42 Cameo Wy | relocate (e) ground floor 1/2 bathroom and expand to bathroom. separate a portion of (e) ground floor recreation room to create master bedroom. create new closet.Details
relocate (e) ground floor 1/2 bathroom and expand to bathroom. separate a portion of (e) ground floor recreation room to create master bedroom. create new closet. | $10,200 | |
| Jun 13, 2012 | Expired or cancelled cancelled Sep 2013 | 74 Blake St | remove portion of building that extends beyond the south property line. remove a portion of building at west that was constructed without permit.Details
remove portion of building that extends beyond the south property line. remove a portion of building at west that was constructed without permit. | $5,000 | |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 55 Chumasero Dr | Surber Construction | voluntary upgrade of basement non bearing partition walls.Details
voluntary upgrade of basement non bearing partition walls. | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jul 2012 | 310 Arballo Dr | Surber Construction | voluntary upgrade of non bearing partitioin wallsDetails
voluntary upgrade of non bearing partitioin walls | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 810 Gonzalez Dr | Surber Construction | voluntary upgrade of basement non bearing partition wallsDetails
voluntary upgrade of basement non bearing partition walls | $15,000 |
| Apr 26, 2012 | Completed final sign-off May 2012 | 125 Cambon Dr | Surber Construction | voluntary upgrade of basement non bearing partition walls.Details
voluntary upgrade of basement non bearing partition walls. | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jul 2012 | 355 Serrano Dr | Surber Construction | voluntary upgrade of basement non bearing partition wallsDetails
voluntary upgrade of basement non bearing partition walls | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jul 2012 | 350 Arballo Dr | Surber Construction | voluntary upgrade of basement and non bearing partition wallsDetails
voluntary upgrade of basement and non bearing partition walls | $15,000 |
| Feb 14, 2012 | Completed final sign-off Aug 2012 | 3033 22nd St | relocate unit a to gr floor existing storage area. expand unit b on the 2nd floor. unit c on 3rd floor remains unchanged- sprinklers under separate permit per nfpa 13 r- new unit and path of travel only-Details
relocate unit a to gr floor existing storage area. expand unit b on the 2nd floor. unit c on 3rd floor remains unchanged- sprinklers under separate permit per nfpa 13 r- new unit and path of travel only- | $30,757 | |
| Oct 14, 2011 | Completed final sign-off Mar 2012 | 910 Presidio Av | unit #1 - utilization of existing enclosed space at 1st story: create one additional bedroom & one additional bathroom, additoinal floor area 281 s.f. sprinkler under separate permit per nfpa 13r.Details
unit #1 - utilization of existing enclosed space at 1st story: create one additional bedroom & one additional bathroom, additoinal floor area 281 s.f. sprinkler under separate permit per nfpa 13r. | $42,806 | |
| Jul 18, 2011 | Completed final sign-off Dec 2011 | 900 Presidio Av | conversion of portion of existing storage space in basement (above grade) to exercise room. install 1/2 bath, 2 new windows. preserve existing interior wall and ceiling gyp board finishes and existing fire sprinkler systemDetails
conversion of portion of existing storage space in basement (above grade) to exercise room. install 1/2 bath, 2 new windows. preserve existing interior wall and ceiling gyp board finishes and existing fire sprinkler system | $6,500 | |
| Mar 7, 2011 | Completed final sign-off Oct 2011 | 910 Presidio Av | Citybest Construction | screen open stairs with vertical closely spaced 2x2 wood slats. screen egress balcony railing with aluminum sheets. install continuous friez at top. screen parking spaces in front with roll up doors (no roof). replace windows wiwth aluminum france windows conforming to escape & rescue requirements.Details
screen open stairs with vertical closely spaced 2x2 wood slats. screen egress balcony railing with aluminum sheets. install continuous friez at top. screen parking spaces in front with roll up doors (no roof). replace windows wiwth aluminum france windows conforming to escape & rescue requirements. | $6,500 |
| Feb 25, 2011 | Completed final sign-off Oct 2011 | 900 Presidio Av | Citybest Construction | screen open stairs with vertical closely spaced 2x2 wood slats. screen egress balcony railing with aluminum sheets. install continuous friez at top. screen parking spaces in front with roll up doors (no roof). replace windows with aluminum frame windows conforming to escape & rescue requirements.Details
screen open stairs with vertical closely spaced 2x2 wood slats. screen egress balcony railing with aluminum sheets. install continuous friez at top. screen parking spaces in front with roll up doors (no roof). replace windows with aluminum frame windows conforming to escape & rescue requirements. | $14,000 |
| Jan 16, 2009 | Expired or cancelled expired May 2012 | 100 Font Bl | voluntary upgrade of basement non-bearing partitions.Details
voluntary upgrade of basement non-bearing partitions. | $15,000 |