Mark R. Smith
- Listed as
- authorized agent-others, contractor
- Firm
- Apex America Gc Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Sep 2024
27 permits since 2000 (contractor on 27 permits, authorized agent-others on 1 permit): 15 completed, 6 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2024 | Completed final sign-off Feb 2025 | 572 Chestnut St | Apex America Gc Inc | revision to existing pa #202401224365. new scope of works includes extension of 2nd level deck wallDetails
revision to existing pa #202401224365. new scope of works includes extension of 2nd level deck wall | |
| Aug 1, 2024 | In progress issued Sep 2024 | 2241 Jackson St | Apex America Gc Inc | ref adu pa#202403087376 & 202311201096. this permit is to amend all structural work under prev. approved adu permit to support the approved condition. the struct. scope include: 1. (n) plywd shearwall on 2nd and 3rd floor, 2. rebuild (e) side egress stair 3. provide (n)ftg for 1-hr rated wallDetails
ref adu pa#202403087376 & 202311201096. this permit is to amend all structural work under prev. approved adu permit to support the approved condition. the struct. scope include: 1. (n) plywd shearwall on 2nd and 3rd floor, 2. rebuild (e) side egress stair 3. provide (n)ftg for 1-hr rated wall | |
| Jul 22, 2024 | In progress filed Jul 2024, not yet issued | 2241 Jackson St | Apex America Gc Inc | common areas, new instulation and drywallDetails
common areas, new instulation and drywall | $10,000 |
| Apr 11, 2024 | Expired or cancelled suspend May 2024 | 50 Alta St | Apex America Gc Inc | replace 3 windows in kind on back of building. u factor 0.30 maxDetails
replace 3 windows in kind on back of building. u factor 0.30 max | $3,000 |
| Apr 10, 2024 | Completed final sign-off Dec 2024 | 2241 Jackson St | Apex America Gc Inc | removal and replacement of plaster, carpet, trim, baseboards. common area - hallways only.Details
removal and replacement of plaster, carpet, trim, baseboards. common area - hallways only. | $8,000 |
| Mar 21, 2024 | In progress issued Jun 2024 | 2241 Jackson St | Apex America Gc Inc | ab1114 - separate (e) merge unit (pa# 787852) into 2 by creating new unit #2 on 2/f under adu state program. rebuild stair on 1/f & add a new 1-hr rated fire wall. deferred submittals: (n) sprinklers per sfbc 2022 & nfpa 13 sprinkler per cbc 1028.Details
ab1114 - separate (e) merge unit (pa# 787852) into 2 by creating new unit #2 on 2/f under adu state program. rebuild stair on 1/f & add a new 1-hr rated fire wall. deferred submittals: (n) sprinklers per sfbc 2022 & nfpa 13 sprinkler per cbc 1028. | $225,000 |
| Jan 22, 2024 | Completed final sign-off Feb 2025 | 572 Chestnut St | Apex America Gc Inc | construction of new 2nd level exterior decks at 9'-6" above ground floor.Details
construction of new 2nd level exterior decks at 9'-6" above ground floor. | $10,000 |
| Nov 20, 2023 | In progress issued Mar 2024 | 2241 Jackson St | Apex America Gc Inc | to comply with nov# 202315477: (3) units remodeling (#1, 3, 5) interior works only. replace all windows in kind.Details
to comply with nov# 202315477: (3) units remodeling (#1, 3, 5) interior works only. replace all windows in kind. | $210,000 |
| Oct 19, 2023 | In progress issued Jan 2024 | 572 Chestnut St | Apex America Gc Inc | rev to pa# 202308315740, removal of 2-substandard walls separting the laundry rooms from the kitchen ont he 2/f and 3/f. reconstruction inkind of exterior walls surrounding laundry rooms. rebuilding of dry rotted exterior stair to comply w/current bldg code standards.Details
rev to pa# 202308315740, removal of 2-substandard walls separting the laundry rooms from the kitchen ont he 2/f and 3/f. reconstruction inkind of exterior walls surrounding laundry rooms. rebuilding of dry rotted exterior stair to comply w/current bldg code standards. | $50,000 |
| Aug 31, 2023 | In progress issued Oct 2023 | 572 Chestnut St | Apex America Gc Inc | limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntaryDetails
limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntary | $150,000 |
| Apr 3, 2023 | Completed final sign-off Apr 2023 | 2301 Webster St | Apex America Gc Inc | repair any plywood damaged on the roof.Details
repair any plywood damaged on the roof. | $1,500 |
| Apr 3, 2023 | Completed final sign-off Apr 2023 | 2301 Webster St | Apex America Gc Inc | re-roofing: remove and replace approx 2400 sq ft of flat roof.Details
re-roofing: remove and replace approx 2400 sq ft of flat roof. | $10,000 |
| Jan 26, 2023 | Expired or cancelled cancelled Jan 2026 | 2450 Market St | Apex America Gc Inc | broken house trap- sewer lateral- break portion of concrete all needed.Details
broken house trap- sewer lateral- break portion of concrete all needed. | $1,200 |
| Jan 6, 2023 | Never finaled filed Jan 2023, never issued | 704 Geary St | Apex America Gc Inc | revision of extg bldg pa#201911278358. remove portion of the front door to make more space and install double glass door.Details
revision of extg bldg pa#201911278358. remove portion of the front door to make more space and install double glass door. | $3,000 |
| Jun 17, 2022 | Expired or cancelled withdrawn Jun 2023 | 40 Alta St | Apex America Gc Inc | deck and rail repair only. less than 50%.Details
deck and rail repair only. less than 50%. | $2,000 |
| Apr 19, 2022 | Completed final sign-off Jun 2022 | 1610 Union St | Apex America Gc Inc | minor interior modifications. renovation of 2 restrooms, one to be made accessible.Details
minor interior modifications. renovation of 2 restrooms, one to be made accessible. | $27,000 |
| Mar 28, 2022 | Completed final sign-off Nov 2022 | 573 Lombard St | Apex America Gc Inc | limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures.Details
limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures. | $15,000 |
| Mar 25, 2022 | Completed final sign-off Apr 2022 | 380 14th St | Apex America Gc Inc | unit #405: one shower bathroom remodel (convert tub to shower) non structuralDetails
unit #405: one shower bathroom remodel (convert tub to shower) non structural | $7,000 |
| Feb 22, 2022 | Completed final sign-off Mar 2022 | 40 Alta St | Apex America Gc Inc | to obtain a final inspection for work approved under pa 201807245436. all work is complete. this is for unit #2.Details
to obtain a final inspection for work approved under pa 201807245436. all work is complete. this is for unit #2. | |
| Jan 10, 2022 | Never finaled issued Jan 2022, no final | 1263 Oak St | Apex America Gc Inc | bathroom remodel, non structural. apt 1.Details
bathroom remodel, non structural. apt 1. | $7,000 |
| Oct 28, 2021 | Completed final sign-off Dec 2021 | 380 14th St | Apex America Gc Inc | unit 503. one shower bathroom remodel (convert tub to shower) non structuralDetails
unit 503. one shower bathroom remodel (convert tub to shower) non structural | $7,000 |
| Sep 20, 2021 | Completed final sign-off Nov 2022 | 1439 Leavenworth St | Apex America Gc Inc | unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units.Details
unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units. | $50,000 |
| Jun 24, 2021 | Completed final sign-off Apr 2023 | 1439 Leavenworth St | Miann Builder, Apex America Gc Inc | to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom.Details
to comply w/ nov 202060101: interior renovation of a single ground floor unit to include relocation of several partition walls, kitchen cabinet replacement, one new bathrom. | $40,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | Miann Builder, Apex America Gc Inc | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Jan 8, 2021 | Completed final sign-off Sep 2021 | 24 Carnelian Wy | Apex America Gc Inc | 2 floor residential remodel. ktichen & 2.5 bath remodel. new walkin closet & enclosed vanity in master bedroom.Details
2 floor residential remodel. ktichen & 2.5 bath remodel. new walkin closet & enclosed vanity in master bedroom. | $100,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2024 | 2403 16th St | Apex America Gc Inc, Tipco Construction Inc | revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permitDetails
revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permit | $200,000 |
| Nov 27, 2019 | Expired or cancelled expired Jan 2026 | 704 Geary St | Apex America Gc Inc | tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe.Details
tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe. | $40,000 |