- Jul 2006 to Feb 2025
78 permits since 2000 (architect on 76 permits, authorized agent-others on 1 permit, engineer on 1 permit, pmt consultant/expediter on 1 permit): 47 completed, 4 in progress, 16 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | Expired or cancelled withdrawn Feb 2025 | 441 Linden St | Blair Burke General Contractors Inc | interior remodel replace all finishes in kindDetails
interior remodel replace all finishes in kind | $538,000 |
| May 15, 2023 | Completed final sign-off Mar 2024 | 358 Lombard St | Blair Burke General Contractors Inc | work is limited to exterior material change at previously approved front elevations. bpa#: 201707313324 and 202201216382Details
work is limited to exterior material change at previously approved front elevations. bpa#: 201707313324 and 202201216382 | |
| Apr 20, 2023 | In progress issued Jun 2026 | 4250 26th St | new adu within the construction of a new single-family residence under separate permit bpa #2018-0214-1219.Details
new adu within the construction of a new single-family residence under separate permit bpa #2018-0214-1219. | $150,000 | |
| Jan 11, 2023 | Expired or cancelled expired Dec 2024 | 2808 Vallejo St | Devlin/Mcnally Construction | new front door and gateDetails
new front door and gate | $500 |
| Oct 28, 2022 | Completed final sign-off Dec 2024 | 2808 Vallejo St | Devlin/Mcnally Construction | expansion of previously permitted deckDetails
expansion of previously permitted deck | $1,000 |
| Aug 18, 2022 | Expired or cancelled withdrawn Apr 2024 | 325 Laidley St | the proposed project includes interior renovation, rear horizontal addition, and crawl space excavation to an existing family house.Details
the proposed project includes interior renovation, rear horizontal addition, and crawl space excavation to an existing family house. | $200,000 | |
| May 20, 2022 | In progress issued Nov 2023 | 617 Sanchez St | to demolish a 1-story, type 5, detached garage structure. (e) sfh remain the same.Details
to demolish a 1-story, type 5, detached garage structure. (e) sfh remain the same. | $1,000 | |
| Jan 21, 2022 | Completed final sign-off Mar 2024 | 358 Lombard St | Blair Burke General Contractors Inc | revision to pa 2017-0731-3324 for existing site conditions. existing encroaching wall, west wall revision, floor heights corrected based of existing conditions, window revisions, add nfpa 13r automatic sprinkler system under separate permitDetails
revision to pa 2017-0731-3324 for existing site conditions. existing encroaching wall, west wall revision, floor heights corrected based of existing conditions, window revisions, add nfpa 13r automatic sprinkler system under separate permit | |
| Nov 17, 2021 | Completed final sign-off Mar 2024 | 358 Lombard St | Blair Burke General Contractors Inc | rev to 201707313324. structural revisions. lower footing to increase topsoil for back yard garden.Details
rev to 201707313324. structural revisions. lower footing to increase topsoil for back yard garden. | |
| May 4, 2021 | Never finaled filed May 2021, never issued | 617 Sanchez St | construct accessory dwelling unit on the lower level of the new four-story home to be constructed under permit number 201901150391.Details
construct accessory dwelling unit on the lower level of the new four-story home to be constructed under permit number 201901150391. | $10,000 | |
| Dec 18, 2019 | Never finaled issued Mar 2022, no final | 153 Saturn St | renovation & horizontal addition to an (e) 4-story, 1-unit residential bldg. when completed, the (n) bldg will be a 4-story , 2-unit residential bldg.Details
renovation & horizontal addition to an (e) 4-story, 1-unit residential bldg. when completed, the (n) bldg will be a 4-story , 2-unit residential bldg. | $750,000 | |
| Nov 27, 2019 | Completed final sign-off Dec 2024 | 2808 Vallejo St | Devlin/Mcnally Construction | (n) foundation & interior renovation to (e) 3-story single residential bldg. increase habitable space in (e) basement within (e) bldg envelope.Details
(n) foundation & interior renovation to (e) 3-story single residential bldg. increase habitable space in (e) basement within (e) bldg envelope. | $2,500,000 |
| Nov 20, 2019 | Never finaled issued Feb 2020, no final | 210 Beacon St | Devlin/Mcnally Construction | removal of exterior walls, exterior deck enlargement & (n) sliding glass doorDetails
removal of exterior walls, exterior deck enlargement & (n) sliding glass door | $10,000 |
| Sep 25, 2019 | Never finaled issued May 2023, no final | 3517 Divisadero St | horizontal & vertical addition, interior renovation, facade replacement. 2 new bedrooms & 3 new baths. **maher n/a**Details
horizontal & vertical addition, interior renovation, facade replacement. 2 new bedrooms & 3 new baths. **maher n/a** | $950,000 | |
| Feb 1, 2019 | Completed final sign-off Mar 2019 | 2833 Vallejo St | revision to permits 201405155829, 201412194134, 201508214962, & 201706280580 to document as-built locations of exhaust fans, duct runs & radiant heating equipment.Details
revision to permits 201405155829, 201412194134, 201508214962, & 201706280580 to document as-built locations of exhaust fans, duct runs & radiant heating equipment. | ||
| Jan 15, 2019 | Never finaled issued Oct 2023, no final | 617 Sanchez St | to demolish 2 story single family dwelling.Details
to demolish 2 story single family dwelling. | $75,000 | |
| Jan 15, 2019 | Never finaled issued Oct 2023, no final | 617 Sanchez St | to erect 4 stories, no basement, type v-a, single family residence.Details
to erect 4 stories, no basement, type v-a, single family residence. | $550,000 | |
| Dec 17, 2018 | Expired or cancelled cancelled Jan 2026 | 1545 Pine St | unit 108: first time t.i.:pvt office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom, (n) lighting and power/data; finishes throughout. mep+l/s+f/s sep permits.Details
unit 108: first time t.i.:pvt office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom, (n) lighting and power/data; finishes throughout. mep+l/s+f/s sep permits. | $175,000 | |
| Dec 17, 2018 | Completed final sign-off Sep 2020 | 1545 Pine St | Patrick Uniacke | unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits.Details
unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits. | $220,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2019 | 235 Jersey St | D K G Construction Inc | revision to pa# 2016-0201-8493. work under this permit is limited to in-kind repairs to discovered dry-rot in (e) walls scheduled to remain to comply w/ planning departments and dbi nov# 201877781, suspension of 201602018493Details
revision to pa# 2016-0201-8493. work under this permit is limited to in-kind repairs to discovered dry-rot in (e) walls scheduled to remain to comply w/ planning departments and dbi nov# 201877781, suspension of 201602018493 | $5,000 |
| Aug 7, 2018 | Never finaled issued Oct 2018, no final | 58 Arroyo Wy | interior renovation and conversion of storage space into habitable space. window replacement at select windows in rearDetails
interior renovation and conversion of storage space into habitable space. window replacement at select windows in rear | $100,000 | |
| Feb 14, 2018 | In progress issued Oct 2024 | 4250 26th St | Casement Construction | erect (4) stories, (1) basement, type v-b, single family residence.Details
erect (4) stories, (1) basement, type v-b, single family residence. | $1,500,000 |
| Feb 14, 2018 | In progress issued Oct 2024 | 4250 26th St | demolish (3) stories, single family residence.Details
demolish (3) stories, single family residence. | $15,000 | |
| Dec 20, 2017 | Completed final sign-off Mar 2019 | 4250 26th St | D K G Construction Inc | to comply with nov201773191 ces: correction of unsafe retaining wall consisting of the following work: demo of an (e) rubble wall in rear yard along east prop line. construction of a new soldier beam & lagging retaining wall @ east prop line in rear yard.Details
to comply with nov201773191 ces: correction of unsafe retaining wall consisting of the following work: demo of an (e) rubble wall in rear yard along east prop line. construction of a new soldier beam & lagging retaining wall @ east prop line in rear yard. | $15,000 |
| Jul 31, 2017 | Completed final sign-off Mar 2024 | 358 Lombard St | Blair Burke General Contractors Inc, Excel Site Services Inc | interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms.Details
interior renovation with horizontal and vertical addition. 2 new additional bedrooms & 3.5 new additional bathrooms. | $550,000 |
| Jun 28, 2017 | Completed final sign-off Mar 2019 | 2833 Vallejo St | Linea Built Inc. | revision to app#201508214962, app#201405155829 & app#201412194134: lower level 2 recessed patio addition. rated egress doors layout revise, mechanical update, structural revision per architecture changes.Details
revision to app#201508214962, app#201405155829 & app#201412194134: lower level 2 recessed patio addition. rated egress doors layout revise, mechanical update, structural revision per architecture changes. | $25,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 2646 Union St | Impact Builders Llc, Thompson Suskind L P | modification to garage for car lift and expansion at below grade mechanical space ref 201508113883Details
modification to garage for car lift and expansion at below grade mechanical space ref 201508113883 | $5,000 |
| Oct 5, 2016 | Completed final sign-off Aug 2023 | 188 Octavia St | to erect 5 stories, no basement, type iii-a & i-a, 27 units residential & mixed use commercial. (r-2,m)Details
to erect 5 stories, no basement, type iii-a & i-a, 27 units residential & mixed use commercial. (r-2,m) | $9,000,000 | |
| Apr 15, 2016 | Completed final sign-off Apr 2017 | 1553 Pine St | Swinerton Builders | ti: no work to residential units. new finishes, non-bearing partitions and interior doors, new entry ada signage, portable ramp, new plmg fixtures to replace extg. in kind, new rear wall grab bar, form c.Details
ti: no work to residential units. new finishes, non-bearing partitions and interior doors, new entry ada signage, portable ramp, new plmg fixtures to replace extg. in kind, new rear wall grab bar, form c. | $60,825 |
| Feb 23, 2016 | Completed final sign-off Mar 2024 | 357 Day St | Devlin/Mcnally Construction | horizontal addition. interior renovation. add (2) bedroom & (2) bathrooms in the basement, 1st & 2nd floors.Details
horizontal addition. interior renovation. add (2) bedroom & (2) bathrooms in the basement, 1st & 2nd floors. | $450,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2019 | 235 Jersey St | D K G Construction Inc | interior renovation of a 2 unit building with rear & vertical expansion. 1. rear horiz. addition & vert. addition. 2. lift 1/f story 2'5". 3. add 2 bedrms & 4 baths in basement 2/f & 3/fDetails
interior renovation of a 2 unit building with rear & vertical expansion. 1. rear horiz. addition & vert. addition. 2. lift 1/f story 2'5". 3. add 2 bedrms & 4 baths in basement 2/f & 3/f | $495,000 |
| Jan 15, 2016 | Never finaled issued Jun 2017, no final | 4301 Cesar Chavez St | horizontal & vertical addition. addition of 2 bedrooms & 3 baths.Details
horizontal & vertical addition. addition of 2 bedrooms & 3 baths. | $495,000 | |
| Dec 21, 2015 | Completed final sign-off Aug 2016 | 1 Sheldon Tr | D K G Construction Inc | kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind.Details
kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind. | $100,000 |
| Dec 14, 2015 | Never finaled issued Jan 2016, no final | 4038 23rd St | Devlin/Mcnally Construction | restore e finish at entry stairs to woodDetails
restore e finish at entry stairs to wood | $3,500 |
| Oct 23, 2015 | Expired or cancelled cancelled Feb 2019 | 2440 Broadway | interior renovation & rear horizontal addition for larger living & kitchen areas. ** maher: compliance with ordinance no# 155-13 not required **Details
interior renovation & rear horizontal addition for larger living & kitchen areas. ** maher: compliance with ordinance no# 155-13 not required ** | $500,000 | |
| Aug 21, 2015 | Completed final sign-off Mar 2019 | 2833 Vallejo St | Linea Built Inc. | convert (e) lightwell into interior space and extend roof deck as shown on plan. ref pa 201412194134Details
convert (e) lightwell into interior space and extend roof deck as shown on plan. ref pa 201412194134 | $10,000 |
| Aug 21, 2015 | Completed final sign-off Apr 2020 | 2646 Union St | Impact Builders Llc | new front and rear horizontal addition. new front and rear facades. extend the bedrooms, and interior space at the rear.Details
new front and rear horizontal addition. new front and rear facades. extend the bedrooms, and interior space at the rear. | $100,000 |
| Aug 11, 2015 | Completed final sign-off May 2019 | 2646 Union St | Impact Builders Llc, Thompson Suskind L P | the proposed project is an interior renovation and excavation of existing crawl spaces to be covered to living space. seismic upgrade, new foundation and repair work.Details
the proposed project is an interior renovation and excavation of existing crawl spaces to be covered to living space. seismic upgrade, new foundation and repair work. | $350,000 |
| Jul 16, 2015 | Completed final sign-off Aug 2016 | 456 27th St | Devlin/Mcnally Construction | lightwell infill. revision to bpa# 2013-0311-1903.Details
lightwell infill. revision to bpa# 2013-0311-1903. | $5,000 |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 525 Jersey St | Design Line Construction | interior 2/f & 3/f bathroom renovations. no change on walls and openings.Details
interior 2/f & 3/f bathroom renovations. no change on walls and openings. | $5,000 |
| Jun 5, 2015 | Expired or cancelled expired Jan 2017 | 525 Jersey St | Design Line Construction | revision to pa#201502188585. revise (e) winder stairway to straight run stairway.Details
revision to pa#201502188585. revise (e) winder stairway to straight run stairway. | $2,000 |
| Jun 3, 2015 | Completed final sign-off May 2016 | 461 02nd St | Devlin/Mcnally Construction | #457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinanceDetails
#457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinance | $75,000 |
| Jun 2, 2015 | Expired or cancelled expired Jan 2017 | 525 Jersey St | Design Line Construction | revision to appl. # 2015.0218.8585. to add a bay window extension on third floor only.Details
revision to appl. # 2015.0218.8585. to add a bay window extension on third floor only. | $10,000 |
| May 22, 2015 | Completed final sign-off Aug 2016 | 456 27th St | to copmly w/ boa decision #14-170 for upheld the suspension.Details
to copmly w/ boa decision #14-170 for upheld the suspension. | ||
| May 18, 2015 | Completed final sign-off Aug 2017 | 112 Upper Tr | Caruso Construction Inc. | rear horizontal addition for kitchen renovation & half bath.Details
rear horizontal addition for kitchen renovation & half bath. | $150,000 |
| Apr 28, 2015 | Completed final sign-off Apr 2016 | 14 Glover St | Caruso Construction Inc. | interior renovation throughout & voluntary structural strengthening at 4th floor. select iwndow replacement, windows not visible from street.Details
interior renovation throughout & voluntary structural strengthening at 4th floor. select iwndow replacement, windows not visible from street. | $150,000 |
| Mar 6, 2015 | Expired or cancelled expired Sep 2016 | 4038 23rd St | Devlin/Mcnally Construction | revision to app#201404304535.1)revision to floor layout at 1st floor. addition of occupiable attic space and new stair from 3rd floor to attic. 2)new dormers. 3) sprinklers per nfpa 13r to be filed under seperate permit.Details
revision to app#201404304535.1)revision to floor layout at 1st floor. addition of occupiable attic space and new stair from 3rd floor to attic. 2)new dormers. 3) sprinklers per nfpa 13r to be filed under seperate permit. | $80,000 |
| Feb 26, 2015 | Completed final sign-off Dec 2022 | 311 Grove St | Granite Excavation & Demolition Inc, Madden Plumbing, Llc | construct (n) 8 dwelling units with 5 storiesDetails
construct (n) 8 dwelling units with 5 stories | $3,200,000 |
| Feb 18, 2015 | Completed final sign-off Jan 2017 | 525 Jersey St | Design Line Construction | interior renovation & rear facade to be re-cladded. 1.(e)interior walls will be demoished & or reconfigured. 2)(n) finishes, fixtures & appliances will be installed. 2.exterior window opening to remain, 2) exterior rear facade re-cladded w/nw windows. nfpa 13r sprinkler under separate permit.Details
interior renovation & rear facade to be re-cladded. 1.(e)interior walls will be demoished & or reconfigured. 2)(n) finishes, fixtures & appliances will be installed. 2.exterior window opening to remain, 2) exterior rear facade re-cladded w/nw windows. nfpa 13r sprinkler under separate permit. | $250,000 |
| Feb 17, 2015 | Completed final sign-off Mar 2015 | 4042 23rd St | Devlin/Mcnally Construction | addition of 1 (21-1/2" x 27-3/8" velux skylight into an exisitng bathroom. it will be set back 5'6" from the property line not visible from the street. u value max. .32Details
addition of 1 (21-1/2" x 27-3/8" velux skylight into an exisitng bathroom. it will be set back 5'6" from the property line not visible from the street. u value max. .32 | $2,500 |
| Feb 17, 2015 | Completed final sign-off Apr 2017 | 1056 Haight St | revision to appl #200412292309: as built documentation of current bldg areas. relocation of fireplace, rear yard stair adjusted & balconies adjusted.Details
revision to appl #200412292309: as built documentation of current bldg areas. relocation of fireplace, rear yard stair adjusted & balconies adjusted. | ||
| Oct 7, 2014 | Never finaled filed Oct 2014, never issued | 2207 Market St | demolish 1 story retail bldg.(as replacement bldg.is having 3rd permit appl. extension, applicant will revise permit to comply with 2022 cbc/sfbc, and it will be subject to review by all review stations.Details
demolish 1 story retail bldg.(as replacement bldg.is having 3rd permit appl. extension, applicant will revise permit to comply with 2022 cbc/sfbc, and it will be subject to review by all review stations. | $30,000 | |
| Oct 7, 2014 | Never finaled filed Oct 2014, never issued | 2201 Market St | new construction of an 8 story building with 7 stories of 20 residentail dwelling units over commercial tenant spaces on the ground floor.Details
new construction of an 8 story building with 7 stories of 20 residentail dwelling units over commercial tenant spaces on the ground floor. | $2,000,000 | |
| Sep 17, 2014 | Completed final sign-off Jun 2016 | 420 El Camino Del Mar | Forsythe General Contractors | interior renovation of bathrooms & kitchen. window replacement. conversion of existing unfinished 1st floor into finished 1st floor, voluntary seismic structural upgrade.Details
interior renovation of bathrooms & kitchen. window replacement. conversion of existing unfinished 1st floor into finished 1st floor, voluntary seismic structural upgrade. | $450,000 |
| Jul 18, 2014 | Completed final sign-off Jan 2020 | 647 Duncan St | S F Garage Company Inc., Cht Properties Development | erect 3 stories, 2 basements, one single familyDetails
erect 3 stories, 2 basements, one single family | $500,000 |
| Jul 18, 2014 | Completed final sign-off Feb 2020 | 647 Duncan St | S F Garage Company Inc. | demolish 3 stories of one single family dwelling.Details
demolish 3 stories of one single family dwelling. | $30,000 |
| Jun 18, 2014 | Never finaled filed Jun 2014, never issued | 265 Shipley St | to erect 5 stories, 1 basement, type i-a / iii-a, 9 units reidential with mixed used buildng. (r-2, b, s-2) ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
to erect 5 stories, 1 basement, type i-a / iii-a, 9 units reidential with mixed used buildng. (r-2, b, s-2) ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $2,000,000 | |
| Apr 30, 2014 | Expired or cancelled expired Oct 2016 | 4038 23rd St | Devlin/Mcnally Construction | revision to pa#201302220724 changes includes interior layouts, window locations, no change to exterior building envelope. modification to exterior rear deck under separate permit.Details
revision to pa#201302220724 changes includes interior layouts, window locations, no change to exterior building envelope. modification to exterior rear deck under separate permit. | |
| Jan 27, 2014 | Completed final sign-off Jul 2014 | 2427 Green St | Devlin/Mcnally Construction | revision to pa#201303051482 to modify shape/layout of roof deck & guardrail material from wood to glass, no increase in area. compliance with ordinance #155-13 not required.Details
revision to pa#201303051482 to modify shape/layout of roof deck & guardrail material from wood to glass, no increase in area. compliance with ordinance #155-13 not required. | $5,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 1280 10th Av | Finbarr Collins Construction Inc. | residential: kitchen remodel, retail: foundation work & accessibility improvements, no exterior work, structural upgrade per plan.Details
residential: kitchen remodel, retail: foundation work & accessibility improvements, no exterior work, structural upgrade per plan. | $75,000 |
| Apr 11, 2013 | Completed final sign-off Jan 2020 | 520 El Camino Del Mar | Moroso Construction Inc | interior & exterior renovation, rear horizontal addition, new rear yard garage, new sub basement. window replacement & new elevator. new finishes and fixtures throughout.Details
interior & exterior renovation, rear horizontal addition, new rear yard garage, new sub basement. window replacement & new elevator. new finishes and fixtures throughout. | $1,175,000 |
| Mar 11, 2013 | Completed final sign-off Aug 2015 | 456 27th St | demolish single family residenceDetails
demolish single family residence | $10,000 | |
| Mar 11, 2013 | Completed final sign-off Aug 2016 | 456 27th St | erect 3-story, 2-unit residential, type v new building.Details
erect 3-story, 2-unit residential, type v new building. | $600,000 | |
| Mar 5, 2013 | Completed final sign-off Jul 2014 | 2427 Green St | Devlin/Mcnally Construction | new roof deck & access hatch from 3rd floor ceiling.Details
new roof deck & access hatch from 3rd floor ceiling. | $30,000 |
| Dec 20, 2012 | Expired or cancelled expired Apr 2014 | 4318 26th St | Linea Built Inc. | revision to pa#2011-1013-6675 to reflect floor plan change consists of layout & location of bedrooms, living/dining & kitchen. window size & location as result of interior layout changes.Details
revision to pa#2011-1013-6675 to reflect floor plan change consists of layout & location of bedrooms, living/dining & kitchen. window size & location as result of interior layout changes. | |
| Apr 26, 2012 | Completed final sign-off Jun 2016 | 425 Douglass St | Devlin/Mcnally Construction | remodel of (e) bldg: rear yard addition and modifications of front of house. total 970 sq ft. remodeling will include 6 bedrooms, 4 bathrms, 2 powder rooms, library, living, dining, kitchen and garden level living space.Details
remodel of (e) bldg: rear yard addition and modifications of front of house. total 970 sq ft. remodeling will include 6 bedrooms, 4 bathrms, 2 powder rooms, library, living, dining, kitchen and garden level living space. | $400,000 |
| Nov 17, 2011 | Completed final sign-off Nov 2018 | 645 Duncan St | S F Garage Company Inc., Cht Properties Development | to erect 3 stories with 1 basement, single family dwelling.Details
to erect 3 stories with 1 basement, single family dwelling. | $600,000 |
| Jun 24, 2011 | Never finaled issued Jul 2011, no final | 765 Market St | interior renovation of condo including reconfiguration and kitchen and bathDetails
interior renovation of condo including reconfiguration and kitchen and bath | $150,000 | |
| Mar 23, 2011 | Completed final sign-off Aug 2011 | 310 Grant Av | Linea Built Inc. | office ti on the 4th floor. remove (e) partitions, replace w/ new configuration, finishes and appliances (kitchenete sink), new doors. (e) plbg, fixtures removed and replaced. new duct work added, extractor fan to be added to mech system.Details
office ti on the 4th floor. remove (e) partitions, replace w/ new configuration, finishes and appliances (kitchenete sink), new doors. (e) plbg, fixtures removed and replaced. new duct work added, extractor fan to be added to mech system. | $175,000 |
| Dec 7, 2009 | Expired or cancelled expired Nov 2013 | 765 Market St | 38 Degress North Latitude Builders Inc. | merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor.Details
merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor. | $50,000 |
| Nov 18, 2008 | Completed final sign-off Aug 2009 | 650 Delancey St | #107- interior renovation of extg apartment. remodel kitchen and bathroom, cabinets & finishes. replacement of extg guardrail and extg stair. new light fixtures and new plumbing fixturesDetails
#107- interior renovation of extg apartment. remodel kitchen and bathroom, cabinets & finishes. replacement of extg guardrail and extg stair. new light fixtures and new plumbing fixtures | $100,000 | |
| Aug 18, 2008 | Completed final sign-off Feb 2009 | 1197 Dolores St | interior renovation of existing kitchen & bathroom w/ new finishes, cabinets & fixtures, powder rom is to be const wall finishes in several bedrms, two new skylights, and infill windows on (e) lightwell not visible from streetDetails
interior renovation of existing kitchen & bathroom w/ new finishes, cabinets & fixtures, powder rom is to be const wall finishes in several bedrms, two new skylights, and infill windows on (e) lightwell not visible from street | $50,000 | |
| Apr 11, 2008 | Completed final sign-off Jan 2009 | 3325 Jackson St | Caruso Construction Inc. | inter renovation of single family-bsmnt work adding 3 habitable rms,install plywood sheathing on 2 fl,1st fl-work includes removing several non-bearing walls & replacing kitchen. new powder rm will be added, 2nd fl-work includes removing several non-bearing walls & adding a bathrm, new window sasheDetails
inter renovation of single family-bsmnt work adding 3 habitable rms,install plywood sheathing on 2 fl,1st fl-work includes removing several non-bearing walls & replacing kitchen. new powder rm will be added, 2nd fl-work includes removing several non-bearing walls & adding a bathrm, new window sashe | $250,000 |
| Mar 18, 2008 | Completed final sign-off Jan 2009 | 3325 Jackson St | Caruso Construction Inc. | removal of an (e) wood burning fireplace and replacement with a new gas powered (insert) fireplace on 1st floor. bathroom renovations to 2 (e) bathrooms on 2nd floor including new fixtures and finishesDetails
removal of an (e) wood burning fireplace and replacement with a new gas powered (insert) fireplace on 1st floor. bathroom renovations to 2 (e) bathrooms on 2nd floor including new fixtures and finishes | $50,000 |
| Aug 8, 2007 | Completed final sign-off Mar 2008 | 112 Upper Tr | interior remodel of master bedroom, master bath, 4th floor bedroom and 4th floor bathroom. there is no change of use or occupancy. no exterior or structural changes. minor remodel at 3rd floor.Details
interior remodel of master bedroom, master bath, 4th floor bedroom and 4th floor bathroom. there is no change of use or occupancy. no exterior or structural changes. minor remodel at 3rd floor. | $200,000 | |
| Nov 21, 2006 | Completed final sign-off Sep 2007 | 81 Langton St | 1st floor, suite #2 - change of use from r1 to b,m of a single ground floor dwelling unit of a 15 unit, 3 story building. there is no alteration to existing structure or facade to create commercial space that sells alchol.Details
1st floor, suite #2 - change of use from r1 to b,m of a single ground floor dwelling unit of a 15 unit, 3 story building. there is no alteration to existing structure or facade to create commercial space that sells alchol. | $36,000 | |
| Sep 18, 2006 | Completed final sign-off Jul 2008 | 3775 25th St | demolition of existing garage door & fence. new construction of car port roof canopy, garage door and fence. new garage door to be wood and painted.Details
demolition of existing garage door & fence. new construction of car port roof canopy, garage door and fence. new garage door to be wood and painted. | $15,000 | |
| Jul 11, 2006 | Completed final sign-off May 2008 | 8 Cityview Wy | L D Construction | construction of 3rd story addition to an existing 2-story single family dwelling. kitchen and bathroom remodel. seismic upgrade of entire house.Details
construction of 3rd story addition to an existing 2-story single family dwelling. kitchen and bathroom remodel. seismic upgrade of entire house. | $100,000 |